Report on Tripping Analysis

ADDIS EAST 2 (BELA) SUBSTATION

Over current & Earth fault relay co-ordination

Over current fault relay co-ordination:

RELAY MICOM P123 SETTINGS (Relay 1 for incoming 1 & Relay 2 for incoming 2)

Relay Location: 15kV incomer feeder panel (15kV Switchboard)

Protection Functions: 50/51, 50N/51N

BASIC FAULT CALCULATION:-


Fault level at 15 kV Bus:

Our transmission system is an interconnected system. We have kept some grading

In the operating time in system according to voltage level. If fault occur on down

Stream feeder, it cleared the fault. In case of fault not clear by the feeder than

Upstream feeder will trip it. For this purpose we use IDMT (Inverse Definite

Minimum Time Characteristic Curve (NI or SI) to calculate the TMS of each feeder.

Full load current of 25MVA transformer = 25,000/(1.732x15)=963.4A

Start current low = 110% of full load current = 1.1 x 963.4 =1059.74A

1059.74A =1059.74/1200 = 0.883In

Set it at 0.8In

Start current low setting = 0.8In

High stage is about 2-10 times of the full load current = 4 x 963.4A = 3853.6A (Assumption

Was made with reference to switchboard supplier)

High stage setting = 3853.6/1200 = 3.3In


`Parameter Range Settings Remarks
Low Stage Setting

Start current low set


(3I>) 0.1-25.00In 0.8In 110%=1059.74A
setting

Operation Mode
(3I>) Delay Type IEC curves Def. time DMT

Time Dial (3I>) in 0.025-10 1s


DMT or Delay Time

High Stage setting

Start current low set 0.5-40In 3.3In


(3I>>)

Operation Mode Definite DMT


(3I>>) Time/Instant.

Operation Time 0-150s 100ms


(3I>>)
Instant Stage setting
Start current low 0.5-40In N/A
set(3I>>>)

Operation Mode Definite N/A


(3I>>>) Time/Instant.
Operate time(3I>>) 0-150s N/A

Earth Fault Protections (50N/51N):

Low stage set =20% full load current = 0.2 x 963.4 = 192A (10%-40% of full load current

Based on the protective relays application guide by manufacturer and assumption was

Made with reference


192.68 / 1200 = 0.16In or 16% of In

Set it at 0.1In or 10% of in

`Parameter Range Settings Remarks


Low Stage Setting

Start current low set


(3I>) 0.1-25.00In 0.1In 10%=1059.74A
setting

Operation Mode
(3I>) Delay Type IEC curves Def. time DMT

Time Dial (3I>) in 0.025-10 1s


DMT or Delay Time

High Stage setting

Start current low set 0.5-40In 0.5In


(3I>>)

Operation Mode Definite DMT


(3I>>) Time/Instant.

Operation Time 0-150s 100ms


(3I>>)
Instant Stage setting
Start current low 0.5-40In N/A
set(3I>>>)

Operation Mode Definite N/A


(3I>>>) Time/Instant.
Operate time(3I>>) 0-150s N/A

Relay Location: 15kV feeder panel (15kV Line 4)

Protection Functions: 50/51, 50N/51N

Let the operating time of relay to be 0.3 seconds

The three-phase fault current viewed by relay is I3phf = 25000/(1.732x15)x0.1018=9452.639 A


Plug setting of relay in amperes = 9.811 A.

Therefore TMS of relay is TMS = 0.3*[(9452.639/9.811)0.02 –1]/0.14=0.3198

Since the TMS range of p123 relay is in range of 0.05 – 1 in steps of 0.05

Hence above calculated TMS is approximated to 0.35

Now as per the approximated TMS, recalculated operating time is:

Top line 4’ = 0.35*0.14/[(9452.639/600)0.02 –1] = 0.864sec. But old time setting is 150ms now
we have change the setting as follow

`Parameter Range Settings Remarks


Low Stage Setting

Start current low


set 0.1-25.00In 1In
(3I>)

Operation Mode We have changed to


(3I>) Delay Type IEC curves Def. time DMT IDMT IEC SI

Time Dial (3I>) in 0.025-10 150MS New setting will be in


DMT or Delay TMS=0.15
Time

High Stage setting

Start current low set 0.5-40In 2In


(3I>>)

Operation Mode Definite DMT


(3I>>) Time/Instant.

Operation Time 0-150s 50ms


(3I>>)
Instant Stage setting
Start current low 0.5-40In N/A
set(3I>>>)

Operation Mode Definite N/A


(3I>>>) Time/Instant.
Operate time(3I>>) 0-150s N/A

15 KV switchboard protections settings For Shegole and Black lion substation

Relay Location: 15kV incomer feeder panel (15kV Switchboard)

Protection Functions: 50/51, 50N/51N (SHEGOLE)

Designation Protection relay CT and VT ANSI Code Setting


ratio
15KV Outgoing feeder REF 615 CT 800/1 A 50/51 Start value=0.66xIn
(PHLPTOC1) Start value Mult=1
3I> and Operate delay time=0.05
Operating curve=IEC Norm Inv

Start value=3xIn
Start value Mult=1
(PHHPTOC1) Operate delay time=50ms
3I>> Operating curve=IEC Def.Time

50N/51N Start value=0.2xIn


EFHPTOC1 Start value Mult=1
3Io>> Operate delay time=50ms
Operating curve=IEC Def.Time
EFLPTOC1 Start value=0.05xIn
3Io> Start value Mult=1
Operate delay time=50ms
Operating curve=IEC Def.Time

15KV Incomer REF 615 CT 1600/1 A 50/51 Start value=1.5xIn


feeder DPHHPDOC1 Start value Mult=1
3I>> Operate delay time=100ms
Operating curve=IEC Def.Time
Directional mode=forward

DPHLPDOC1 Start value=1xIn


3I> Start value Mult=1
Operate delay time=150ms
Operating curve=IEC Def.Time
Directional mode=non dir
50N/51N Start value=0.1xIn
EFHPOTC1 Start value Mult=1
3Io>> Operate delay time=100ms
Operating curve=IEC Def.Time
DEFHPDEF1 Start value=0.1xIn
3Io>>->1 Start value Mult=1
Operate delay time=100ms
Operating curve=IEC Def.Time
Directional mode=non dir

15KV Bus coupler REF 615

15 KV switchboard protections settings For Shegole and Black lion substation


Relay Location: 15kV incomer feeder panel (15kV Switchboard)

Protection Functions: 50/51, 50N/51N (BLACK LION)

Designation Protection relay CT and VT ANSI Code Setting


ratio
15KV Outgoing feeder REF 615 CT 800/1 A 50/51 Start value=0.66xIn
(PHLPTOC1) Start value Mult=1
3I> and Operate delay time=0.05
Operating curve=IEC Norm Inv

Start value=3xIn
Start value Mult=1
(PHHPTOC1) Operate delay time=50ms
3I>> Operating curve=IEC Def.Time

50N/51N Start value=0.1xIn


EFHPTOC1 Start value Mult=1
3Io>> Operate delay time=40ms
Operating curve=IEC Def.Time
EFLPTOC1 Start value=0.05xIn
3Io> Start value Mult=1
Operate delay time=40ms
Operating curve=IEC Def.Time

15KV Incomer REF 615 CT 1600/1 A 50/51 Start value=1.4xIn


feeder DPHHPDOC1 Start value Mult=1
3I>> Operate delay time=100ms
Operating curve=IEC Def.Time
Directional mode=Non dir

DPHLPDOC1 Start value=1.8xIn


3I> Start value Mult=1
Operate delay time=0.1
Operating curve=IEC norm.inv
Directional mode=non dir

50N/51N Start value=0.63xIn


EFHPOTC1 Start value Mult=1
3Io>> Operate delay time=100ms
Operating curve=IEC Def.Time
DEFHPDEF1 Start value=0.1xIn
3Io>>->1 Start value Mult=1
Operate delay time=100ms
Operating curve=IEC Def.Time
Directional mode=non dir

15KV Bus coupler REF 615


15 KV switchboard protections settings For Shegole and Black lion substation
Relay Location: 15kV incomer feeder panel (15kV Switchboard)

Protection Functions: 50/51, 50N/51N (ADDIS EAST 1)

Designation Protection relay CT and VT ANSI Code Setting


ratio
15KV Outgoing feeder REF 615 CT 800/1 A 50/51 Start value=0.7xIn
(PHLPTOC1) Start value Mult=1
3I> and Operate delay time=0.05
Operating curve=IEC Norm Inv

Start value=2.7xIn
Start value Mult=1
(PHHPTOC1) Operate delay time=50ms
3I>> Operating curve=IEC Def.Time

50N/51N Start value=0.2xIn


EFHPTOC1 Start value Mult=1
3Io>> Operate delay time=50ms
Operating curve=IEC Def.Time
EFLPTOC1 Start value=0.05xIn
3Io> Start value Mult=1
Operate delay time=100ms
Operating curve=IEC Def.Time

15KV Incomer REF 615 CT 1600/1 A 50/51 Start value=1.5xIn


feeder DPHHPDOC1 Start value Mult=1
3I>> Operate delay time=200ms
Operating curve=IEC Def.Time
Directional mode=Non dir

DPHLPDOC1 Start value=1xIn


3I> Start value Mult=1
Operate delay time=0.1
Operating curve=IEC Norm.inv
Directional mode=non dir

50N/51N Start value=0.9xIn


DEFLPDEF1 Start value Mult=1
3Io>> Operate delay time=200ms
Operating curve=IEC Def.Time
Directional mode=non dir

DEFHPDEF1 Start value=0.2xIn


3Io>>->1 Start value Mult=1
Operate delay time=150ms
Operating curve=IEC Def.Time
Directional mode=non dir

15KV Bus coupler REF 615


Note we have not change the settings of shegole,black lion and addis east 1substation