This document summarizes the primary current injection test of an 11kV feeder CT for the Bangladesh Power Development Board. The test was conducted at the Thakurgaon substation as part of a turnkey project to develop the 10-Town Power Distribution System. A pulser current injector was used to inject 50A of primary current into each phase of the CT, and secondary currents were measured to verify the CT ratios were within specifications.
This document summarizes the primary current injection test of an 11kV feeder CT for the Bangladesh Power Development Board. The test was conducted at the Thakurgaon substation as part of a turnkey project to develop the 10-Town Power Distribution System. A pulser current injector was used to inject 50A of primary current into each phase of the CT, and secondary currents were measured to verify the CT ratios were within specifications.
This document summarizes the primary current injection test of an 11kV feeder CT for the Bangladesh Power Development Board. The test was conducted at the Thakurgaon substation as part of a turnkey project to develop the 10-Town Power Distribution System. A pulser current injector was used to inject 50A of primary current into each phase of the CT, and secondary currents were measured to verify the CT ratios were within specifications.
Customer Bangladesh Power Development Board (BPDB)
Project Construction of 06 (Six) Nos. New 33/11 kV Substation Including Design, Supply, Installation & Commissioning on Turnkey Basis, Under 10-Town Power Distribution System Development Project. Contract 09845, Dated - 13.09.2012 Substation thakurgaon Location/Feeder Outgoing Feeder 1
TEST EQUIPMENT: PULSER CURRENT INJECTOR
MODEL: PULSER
CT RATIO: 400 – 200/5 – 5A
PRIMARY Secondary Current Measured
PHASE CURRENT INJECTED, I IR(Core1/Core2) IY(Core1/Core2) IB(Core1/Core2) IN(Core1/Core2) (A) (A) (A) (A) (A)