This document summarizes the primary current injection test of an 11kV feeder CT. The test was conducted by Energypac Engineering Ltd. for Bangladesh Power Development Board as part of a substation project in Thakurgaon. Primary currents of 51A, 50A and 50A were injected into the phases and the corresponding secondary currents were measured and found to be within acceptable limits.
This document summarizes the primary current injection test of an 11kV feeder CT. The test was conducted by Energypac Engineering Ltd. for Bangladesh Power Development Board as part of a substation project in Thakurgaon. Primary currents of 51A, 50A and 50A were injected into the phases and the corresponding secondary currents were measured and found to be within acceptable limits.
This document summarizes the primary current injection test of an 11kV feeder CT. The test was conducted by Energypac Engineering Ltd. for Bangladesh Power Development Board as part of a substation project in Thakurgaon. Primary currents of 51A, 50A and 50A were injected into the phases and the corresponding secondary currents were measured and found to be within acceptable limits.
Customer Bangladesh Power Development Board (BPDB)
Project Construction of 06 (Six) Nos. New 33/11 kV Substation Including Design, Supply, Installation & Commissioning on Turnkey Basis, Under 10-Town Power Distribution System Development Project. Contract 09845, Dated - 13.09.2012 Substation thakurgaon Location/Feeder Outgoing Feeder 3
TEST EQUIPMENT: PULSER CURRENT INJECTOR
MODEL: PULSER
CT RATIO: 400 – 200/5 – 5A
PRIMARY Secondary Current Measured
PHASE CURRENT INJECTED, I IR(Core1/Core2) IY(Core1/Core2) IB(Core1/Core2) IN(Core1/Core2) (A) (A) (A) (A) (A)