The document provides test results for a 33 kV bus disconnector switch located at a 33/11 kV substation in Mirsharai, Chittagong. Insulation resistance tests found resistances between 7.4 and 17 GΩ when a 5kV DC voltage was applied. A checklist verifies proper installation, contact alignment and movement, insulation, lubrication, and earthing of the disconnector switch.
The document provides test results for a 33 kV bus disconnector switch located at a 33/11 kV substation in Mirsharai, Chittagong. Insulation resistance tests found resistances between 7.4 and 17 GΩ when a 5kV DC voltage was applied. A checklist verifies proper installation, contact alignment and movement, insulation, lubrication, and earthing of the disconnector switch.
The document provides test results for a 33 kV bus disconnector switch located at a 33/11 kV substation in Mirsharai, Chittagong. Insulation resistance tests found resistances between 7.4 and 17 GΩ when a 5kV DC voltage was applied. A checklist verifies proper installation, contact alignment and movement, insulation, lubrication, and earthing of the disconnector switch.