This document summarizes the primary current injection test of an 11kV feeder CT for the Bangladesh Power Development Board. The test was conducted on the outgoing feeder 4 at the Thakurgaon substation to check the ratio and phase relationship between the primary and secondary currents. The test equipment injected 50A currents into each phase and measured the corresponding secondary currents, confirming the CT was functioning properly.
This document summarizes the primary current injection test of an 11kV feeder CT for the Bangladesh Power Development Board. The test was conducted on the outgoing feeder 4 at the Thakurgaon substation to check the ratio and phase relationship between the primary and secondary currents. The test equipment injected 50A currents into each phase and measured the corresponding secondary currents, confirming the CT was functioning properly.
This document summarizes the primary current injection test of an 11kV feeder CT for the Bangladesh Power Development Board. The test was conducted on the outgoing feeder 4 at the Thakurgaon substation to check the ratio and phase relationship between the primary and secondary currents. The test equipment injected 50A currents into each phase and measured the corresponding secondary currents, confirming the CT was functioning properly.
Customer Bangladesh Power Development Board (BPDB)
Project Construction of 06 (Six) Nos. New 33/11 kV Substation Including Design, Supply, Installation & Commissioning on Turnkey Basis, Under 10-Town Power Distribution System Development Project. Contract 09845, Dated - 13.09.2012 Substation thakurgaon Location/Feeder Outgoing Feeder 4
TEST EQUIPMENT: PULSER CURRENT INJECTOR
MODEL: PULSER
CT RATIO: 400 – 200/5 – 5A
PRIMARY Secondary Current Measured
PHASE CURRENT INJECTED, I IR(Core1/Core2) IY(Core1/Core2) IB(Core1/Core2) IN(Core1/Core2) (A) (A) (A) (A) (A)