The document summarizes the primary current injection test of an 11kV feeder CT for the Bangladesh Power Development Board. It lists the customer, project details, contract information, substation location and feeder. It then shows the test equipment used, the CT ratio, and tables of primary currents injected and the corresponding secondary currents measured for each phase. The test was witnessed on April 1st, 2015.
The document summarizes the primary current injection test of an 11kV feeder CT for the Bangladesh Power Development Board. It lists the customer, project details, contract information, substation location and feeder. It then shows the test equipment used, the CT ratio, and tables of primary currents injected and the corresponding secondary currents measured for each phase. The test was witnessed on April 1st, 2015.
The document summarizes the primary current injection test of an 11kV feeder CT for the Bangladesh Power Development Board. It lists the customer, project details, contract information, substation location and feeder. It then shows the test equipment used, the CT ratio, and tables of primary currents injected and the corresponding secondary currents measured for each phase. The test was witnessed on April 1st, 2015.
Customer Bangladesh Power Development Board (BPDB)
Project Construction of 06 (Six) Nos. New 33/11 kV Substation Including Design, Supply, Installation & Commissioning on Turnkey Basis, Under 10-Town Power Distribution System Development Project. Contract 09845, Dated - 13.09.2012 Substation thakurgaon Location/Feeder Outgoing Feeder 2
TEST EQUIPMENT: PULSER CURRENT INJECTOR
MODEL: PULSER
CT RATIO: 400 – 200/5 – 5A
PRIMARY Secondary Current Measured
PHASE CURRENT INJECTED, I IR(Core1/Core2) IY(Core1/Core2) IB(Core1/Core2) IN(Core1/Core2) (A) (A) (A) (A) (A)