1. INTRODUCTION The brief from the Employer required geometrically complex roof structure over
The Putrajaya Convention Centre is not only a state-of-the art world class the Plenary Hall was conceptualised as a
located in Precinct 5 of the Federal conference centre, but also an icon “Spine Truss” spanning across the North-
Administration Centre of Putrajaya. It is building, which can be a landmark for South direction.
situated on the top of ‘Puncak Selatan’ the country. Being sited on top of the Working together with the architect
and has a commanding view of the highest hill is the Federal Administration Hijjas Kasturi, Perunding Mahir Bersatu
Boulevard. The Putrajaya Convention
Centre was completed in April 2003 at a
cost of approximately RM600 million.
The Putrajaya Convention Centre has
a total area of 135,000 m2 inclusive of
basement carparks and multi-level
convention facilities at higher levels. The
Plenary Hall is on the 1st Floor and
surrounded by a ring of galleries, both
VVIP and VIP lounges, a viewing deck
and a conference hall. The Head of States
Hall is located on the ground floor,
surrounded by VVIP meeting rooms and
lounges. The lower ground mezzanine
floor has meeting rooms, a reception
area, administration and maintenance
office. On the lower ground floor, there
are meeting rooms, a restaurant and a
column-free banquet hall that can host a
2,600 seated silver service dinner. The stunning Putrajaya Convention Centre - A spectacular iconic structure for Malaysia
Perunding Mahir Bersatu Sdn. Bhd. is Centre of Putrajaya, so nothing less than Sdn. Bhd. produced the conceptual
the concept engineer for the Putrajaya an icon building justifies its position. design and drawings with poundage for
Convention Centre and was subsequently The brief also required a 2,800 tender. Prior to the tender, the quantity
assigned to be the Checking Engineer for numbers of uninterrupted view seating surveyor worked out the preliminary
Putrajaya Holdings Sdn. Bhd. at the plenary hall, a 70m column-free estimated cost plan of the buildings for
Upon the completion of the tender banquet hall below the plenary hall and a our client Putrajaya Holdings Sdn. Bhd.
exercise, IJM Corporation Sdn. Bhd. (IJM) Head of State conference hall in between. Seven (7) tenderers were pre-qualified
was awarded the ‘Design and Build’ for This offered a challenge to the Structural and a competitive bid was held. Finally,
Putrajaya Convention Centre. Sinclair Engineer and the Contractor. IJM won and the tendered sum was close
Knight Merz Engineering Sdn. Bhd. to the estimated budgetary cost submitted
(SKM) was then appointed by IJM as the How to achieve client’s requirement earlier by Putrajaya independent quantity
contractor’s consulting engineer. and budget surveyor. The client Putrajaya Holdings
With thorough understanding of the Sdn. Bhd. was satisfied that the column-
2. CLIENT REQUIREMENT / client’s brief and needs, the team applied free Banquet Hall, uninterrupted view of
BUDGET its local knowledge, tailored solutions and the Plenary Hall and budgetary cost met
Putrajaya Holding Sdn. Bhd., the a highly skilled team with leading their requirement.
Employer of this project was given a task expertise in long-span roofing structure,
to complete this project in time for the 11th to deliver the project. The team 3. SIGNIFICANCE OF THE
Organisation of Islamic Conference (OIC) conceptualised using the radial arms PROJECT TO THE COMMUNITY
in October 2003. This commitment to together with compression ring beam and The Malaysia Government recognised
host this conference resulted in a 22 grillage beams to create a 70m “column- the impact that the hosting of major
months design and build contract. free” banquet hall. The long span events can have on export earnings. By

8 JURUTERA, October 2006


08•10•12•14•16•putrajaya ICC 9/11/06 10:17 AM Page 10

CO VER S TORY

hosting and attracting major events like is founded on hard material 108.0m and the inner diameter is 58.4m.
Organisation of Islamic Congress (OIC) in (decomposed shale) except at a small The inner space is a non-suspended slab.
Malaysia which attracted tourists and portion at the outer ring where the The shape adopted is most efficient to
their important tourist dollars. ground is filled. A raft foundation resist the ring tension force from the
Besides tourism, this major project is bearing on hard material was designed to outward push of the rake column.
very significant to the Malaysia support the building and at the filled The analysis of the raft was carried
Government, as an Islamic country taking ground, bore piles were used. This final out using the finite element analysis.
the leading role. It generates close position of the main building was (Typical results and reinforcement detail,
cooperation, bilateral trades and smart determined after a value engineering in stress diagrams are shown in Figure 1
partnerships especially within the Islamic exercise was carried out by the concept and 2).
world. Some of the Malaysia companies engineer, Perunding Mahir Bersatu Sdn. As the tension ring forces are also
have gone offshore and are working in the Bhd. The main building was shifted so circular, the reinforcement is also aligned
Middle East countries and Sudan. that most parts of the foundation is sited in a circular pattern. This was achieved
On the local front, this mega project on hard material. by rolling the bar to the required
delivered within 22 months to meet OIC The raft foundation is shaped like a diameter.
deadline, proved the ability of Malaysian ‘doughnut’ and the thickness varies from The total volume of concrete for the
3
consultants and contractors to deliver 1.50m to 2.25m. The outer diameter is main raft is 12,800m and casting was
“fast track” mega projects. Economically,
it activated the construction industries
and created employment for the local
industries.
The completed Putrajaya Convention
Centre did become an icon building as
promised and the 10th OIC was
successfully held. This project has made
the country proud not only because the
Putrajaya Convention Centre has
achieved state-of-the-art world class
standard and also it was completed with
high quality within a record-breaking
time of 22 months.
The completion of the Putrajaya
Convention Centre on time and on
budget has in a way made known to the
rest of the world the capabilities of the
Malaysian construction industry as a
whole. The design by the Architect was
Figure 1: Raft – Hoop Tension – kM/m2
stunning and has offered a lot of
challenges to the structural engineer and
the construction team, which were
overcome professionally and skilfully.
The completed Putrajaya Convention
Centre is a world class venue hosting
major conferences, exhibitions, meetings
and banquet. Its position has also made
this monument a tourist attraction.
Visitors can get a commanding view of
the boulevard and the lake.

4. ENGINEERING ASPECT
4.1 FOUNDATION
The main building is supported by three
series of radiating circular columns, of
which the diameter of the concentric rings
are 70m, 100m and 130m, respectively.
The platform level of the main
building is at RL +60.0m and the building Figure 2: Raft – Circumferential Bending Moment – kNm/m

10 JURUTERA, October 2006


08•10•12•14•16•putrajaya ICC 9/11/06 10:17 AM Page 12

CO VER S TORY

compressing ring beam. floor onwards. The columns were composite


Within the compression columns with steel plate with thickness from
ring beam (900 x 2700) 20mm to 40mm infilled with concrete.
was a system of grillage The design for structural continuity at the
beams 250 x 2000mm column had created a challenge. An
(30m diameter) innovative design was carried out on the
The analysis of the F1 column node using the STRAND 7 program.
frame was carried out A typical beam to column connection
using finite elements. The modelling is shown in Figure 4. To achieve a
design criteria was not rigid connection between the radiating beam,
only for strength but also the steel column was fabricated into two
the dynamics acceptance halves and the radiating beam slotted in
criteria, this will be between and welded. (Refer to Figure 5).
Putrajaya Convention Centre construction - Night View elaborated in the section Each of these column nodes weighed
below. approximately 10 ton and were fabricated
divided into 8 segments. Each casting Above the ground floor the structural off site. A 200T capacity crawler crane
was completed in about 12 to 18 hours. system consisted of composite columns, was used to erect the nodes.
Thermal insulation using polystyrene structural steel frame and reinforced For the erection of the steel member, one
sheets and sand bedding was provided concrete composite slab with shear unit of 150T and 200T capacity crawler cranes
after casting. connectors. The steel beam was on a and four tower cranes with 2.5T tiploads
radial and circumferential arrangement. were used. Erection of beam was done in
4.2 STRUCTURAL SYSTEM The majority of the beams were such a way to form a square closed loop for
The main building consists of 6 levels constructed of Grade 43 steel built-up stability of the structure.
of functioning space: - sections (using plate
(a) Lower ground (on the raft, housing thickness up to
the Banquet Hall); 40mm) and UB steel
(b) Ground Floor (Head of States Hall); beams of up to
(c) 1 st Floor (main entrance to the 388kg/m, acting
Plenary Hall and meeting rooms); compositely with the
(d) 2nd Floor (Plenary Hall and meeting concrete floor slab.
rooms); The outer most
(e) 3 rd Floor (Plenary Hall, meeting row column (Ring C)
rooms and viewing decks); and stopped at the ground
(f) 4th Floor (Mechanical rooms). floor and the inner row
column (Ring A and B)
The shape of the building is circular continued to the roof
hence the structural grid is also circular at 15° inclination
on plan. The inner ring is 70m in outward from first Figure 3: F1 Frame - Ground floor
diameter, the middle ring is 100m and the
outer ring is 130m. The inner 2 rows of
columns (Ring A and B) were 2.0m in
diameter and the outer most row (Ring
C) consists 900mm2 columns.
The lower ground floor housed the
column-free Banquet Hall. The span
between the column is 70m and above
the Banquet Hall is the Head of States
hall and the Plenary Hall. To support the
loadings from the Plenary Hall, an
innovative radiating portal frame (F1
frame) was developed (Figure 3). The F1
frame is part of the inner most row
column (Ring A). The horizontal member
of the F1 frame reached out 20m towards
the centre. The depth of the horizontal
member was 3.9m. All the horizontal
member of the F1 frame stop at the Figure 4: Column Node

12 JURUTERA, October 2006


08•10•12•14•16•putrajaya ICC 9/11/06 10:18 AM Page 14

CO VER S TORY

The fabrication events. The span of the F1 frame which is


and erection of the 70m and being the support for the entire
roof truss was most plenary hall loadings had indeed created
challenging as it a challenge to the design team.
involved extensive
welding and tight 4.2.2.1 DESIGN METHODOLOGY
distortion control. FOR DYNAMICS BEHAVIOUR
A high degree of The structure was first tuned to achieve
accuracy in fabrica- a natural frequency of 5Hz, thereafter a
tion was required detail analysis using the STRAND7
such that the program was carried out to determine the
individual compo- accelerations. The results were checked
nents were aligned against the National Building Code (NBC)
properly during of Canada for compliance. The NBC has set
Figure 5: Plate Girder welded into half of Column Steel Node erection. In order to a limit of 4% to 7% g for the expected usage
catch up with the i.e. rhythmic activities. (The acceptance
tight construction criteria are shown in Table 1). After a series
schedule, the of iteration the design team was able to
fabricator had to contain the accelerations within the limits.
produce 300 tons of In the modelling of the structure the
steel per week. following assumptions were made: -
The most (i) The mode of vibration of concern
challenging in the was the vertical components.
erection process (ii) The floor vibration was induced
was the erection of primarily by human traffic.
the spine truss. The (iii) The forcing frequency was between
spine truss was 1.5 and 3.0Hz.
analysed in stages (iv) The maximum dynamic load was
Figure 6: Roof Truss – Wire Frame to represent the 0.375kPa. (Refer to Table 2)
sequences of (v) Damping 10%.
The Plenary Hall was formed using erection supported by temporary towers.
built-up steel beam raked and shaped in two The temporary towers were 55 m. (Refer 5. CONSTRUCTION
(2) directions. Precast planks with structural to Figure 7). METHODOLOGY
topping were used to form the seats. The foundation system for Putrajaya
4.2.2 DESIGN FOR DYNAMICS Convention Centre was a reinforced
4.2.1 ROOF One of the most challenging technical concrete raft foundation. The thickness of
The roof structure is unique with its aspect of the project was the harmonics of the
complicated geometry and long span. building. In recent years vibrations due to
The shape of the roof resembles a human activities have created serviceability
‘pending’ which is a buckle worn in issues in health clubs, gymnasiums, stadiums
Malay weddings. The spine truss and even office buildings. These vibrations
spanned 90m and had a depth varying are annoying to the users.
from 3.60m to 7.50m. This spine truss Three factors have given rise to these
supported the centre roof, inner roof and problems: -
part of the outer roof (refer to Figure 6). (a) increased human activities such as
The spine was supported by ‘Crab aerobics and audience participation;
Claw’s at either end. Each ‘Crab Claw’ (b) decreased natural frequency because
transfered the load to four columns. The of increased floor spans and design
roof structure was modelled using the which has been pushed towards the limit;
finite element program STRAND 7. The (c) decreased damping and mass in
model was 3-dimensional representing building construction.
the entire roof including the ‘Crab Claw’ In this project (a) and (b) were the
support. prevailing factors.
Sufficient access elements were The F1 frame which supported the
provided for easy maintenance of the plenary hall was checked for dynamics
building and services, considering clear acceptance. The audience in the plenary Figure 7: View of Temporary Steel Support for
span and height. hall must feel comfortable during all Spine Roof Erection

14 JURUTERA, October 2006


08•10•12•14•16•putrajaya ICC 9/11/06 10:18 AM Page 16

CO VER S TORY

Table 1: Acceptance criteria


simplified with the load path clearly
Occupancies affected by the vibration Acceleration limit, percent gravity defined and analysed to provide sound
engineering to a major project.
Office and Residential 0.4 to 0.7
Dining, Dancing, Weight Lifting 1.5 to 2.5 7. CONCLUSION
Aerobics, rhythmic activities only 4 to 7 The completed Putrajaya Convention
Mixed use occupancies housing aerobics 2 Centre is not just a landmark but an icon
building in the Federal Administration
Table 2: Design parameters for rhytmic events Centre of Putrajaya.
The teams of engineers, architect,
Activity Forcing Weight of Dynamic Dynamic
project managers and contractor have
frequency participation load factor load
ff wβ psf α αwβ psf been delighted with the way in which the
ideas that the team developed have been
Dancing 1.5 - 3.0 12.5 (27ft2/couple) 0.5 6.25 transformed on site at Putrajaya.
The completion of Putrajaya
Lively concert 1.5 - 3.0 31.3 (5ft2/couple) 0.25 7.83
Convention Centre on time and on
or sports event
budget has not only made the Malaysian
Government proud but has also shown
Aerobics
that local contractors and engineers are
- 1st Harmonic 2 - 2.75 4.2 (42ft2/person) 1.5 6.30
able to deliver a mega project within
- 2 Harmonic
nd
4 - 5.50 4.2 (42ft /person)
2
0.6 2.52 twenty-two months.
- 3rd Harmonic 6 - 8.25 4.2 (42ft2/person) 0.1 0.42 It has become a masterpiece, a marvel
of engineering and the pride and glory of
the raft foundation varied from 2.50m to challenging as it involved extensive the Malaysian engineering sector. ■
1.50m. The total volume of the concrete welding and right distortion control.
raft foundation was approximately
12,800m 3 and the casting of the raft 6. SIGNIFICANCE OF
foundation was divided into eight ENGINEERING SOLUTION
sectors. The concreting pour of each The significance of some of the
sector of the raft was approximately engineering solutions was to meet the
1,500m3 and was casted within 16 to 18 requirement of a 70m column-free banquet
hours continuously, commencing in the hall supporting the Head of State Hall and
late evening till early the next morning. a Plenary Hall of 2800 seating capacity.
The column from basement up to In summary, the significance of
ground floor was constructed in concrete. engineering solution are as follows: -
The ground floor structural system 1. The team devised a sculptural system
consists of conventional reinforced of radial arms together with the
concrete frame, compression ring beam, compression ring beams and grillage
Internal pictures of Putrajaya Convention Centre
grillage beams and slabs which were beams. - Head of State Hall
casted in situ. 2. The relocation of the raft foundation
From the ground floor up to the roof, of the building along the main
the columns raking at 15% angle were boulevard axis by 60m, so as to be
made up of composite circular steel founded on rock, demonstrated the
sections infilled with concrete. The column utility of value engineering.
diameter of 1,400mm was rolled from steel 3. The long span geometrically complex
plates of thickness varying from 20mm to roof structure over the plenary hall
40mm. Shear connections of 19mm and was conceptualised as a “Spine Truss”
100mm long were provided throughout spanning across the North-South
the length of the column. At the beam-to- axis, supported by “crab claws” at
column junction, some of the plate girder either ends.
beams were punched through the column 4. The rigid moment connection
to create a rigid moment connections. The between the plate girder beam and
roof structure was unique with column node was an innovative Internal pictures of Putrajaya Convention Centre
- The 2800 Seat Plenary Hall
complicated geometry and long span. engineering solution.
Fabrication of the truss connections
especially the “Crab Claw” end frame With the concept developed, the
support for the central roof was most complex mega building was then

16 JURUTERA, October 2006