KINGDOM OF BAHRAIN AMENDMENT NO. 2 PAGE 1
TO DESC. S-4135 E
MINISTRY OF ELECTRICITY & WATER
ELECTRICITY DISTRIBUTION DIRECTORATE OF 2 .
PLANNING AND DEVELOPMENT DEPARTMENT

AMENDMENT NO. 2 (OF NOVEMBER 2004)


EDD DE SC Rf PTION NO.: S-4135 E.
11 KV {SF6 ) /VACUUM CIRCUIT BREAKER UNIT

1. This amendment supersedes amendment no. 1 of October 2002.

2. Page 4 of 48, Replace sub-clause 3.1 with the following:

3.1 11 kV Distribution System

Nominal voltage: 11000 volt ± 6%, three phase, three wire


Highest.voltage 12000 volt
Frequency 50 Hz±2%
Neutral arrangement The system neutral is connected to earth through
a low resistance at the sending end station.
Maximum prospective 20 kA (350 MVA) at 11 kV for short time duration
fault level of 1 second (max.).

3. Page 6 of 48, Replace sub-clause 7.1.2 with the following:

7.1.2 The nominal rating of the CB unit and its accessories shall be at least
350 MVA at 11 kV and the rated short-time duration is 1 second.

,· 4: Page 12 of 48 -' sub-clause 7i9.1, Page 14 of 48 - sub-clause 7.9.2, Page 15 of 48 -


sub-clause 7.9.3, Page 17 of 48 - sub-clause 7.9.5, Page 18 of 48 - sub-clause 7.9.6,
Page 20 of 48 - sub-clause 7.9.7, Page 22 of 48 - sub-clause 7.9.9, Page 23 of 48 -
sub-clause 7.9.10, and Page 25 of 48 - sub-clause 7.9.11 -Amend the requirements
of the I (THERMAL) for the CURRENT TRANSFORMERS used for protection as
follows:

CURRENT TRANSFORMERS

SERVICE PROTECTION MEASUREMENT INSTRUMENT


I (THERMAL) 20 kA for 1 second 20 kA for 1 second

5. Page 35 of 48, Table 3 - Delete part 1-C 'POWER FREQUENCY VOLTAGE WET
TEST'.
. ' \
'
KINGDOM OF BAHRAJN AMENDMENT NO. 2 PAGE 2
TO DESC. S-4135 E
MINISTRY OF ELECTRiCIW & WATER
ELECTRICITY DISTRIBUTION DIRECTORATE OF 2
PLANNING AND DEVELOPMENT DEPARTMENT

6. Page 35 of 48, Table 3 - Replace part 3 a) by the following:

Sr. Test Reference Specified Value


No .. 2 3 4
1
3 a) Short time
....
withstand current tests IEC56 To withstand 20 kA
. - ·•·. .. . .. ······
for1 second

7. Page 47 of 48, Table 5 - Delete part 1-C 'POWER FREQUENCY VOLTAGE WET
TEST.

8. Page 48 of 48, Add the following clause after clause 23

Confirm Acceptance to bear the cost of works inspection by third party independent
agency, if required by theDirectorate. YES/NO

Approved by:

Original Signed By \
\ SAO.ER AL .JOWDER I
1

SAQER SALMAN AL JOWDER


DIRECTOR,
ELECTRICITY DISTRIBUTION
... ··,. --- ... •- ...•