Check List for Drainage, Electrical Duct, Firefighting system Design for

civil Work of CPA

Deadline for submission


1. All draft drawing, calculation, BOQ and specification within 31 th March 2023.
2. All final drawing, calculation, BOQ and specification within 6 th April 2023.

List of submittals (For Draft and final)

Sl No Item

1 Drainage and Sewerage A. Plan


B. Detail Drawing
C. Specification
D. BOQ
E. Calculation and Report
2 Civil work of Electrical system A. Plan
and Cable Box B. Detail Drawing
C. Specification
D. BOQ
E. Calculation and Report
3 Fire Fighting System A. Plan
B. Detail Drawing
C. Specification
D. BOQ
E. Calculation and Report
Responsible Person and Progress of work

Sl No Item Scope of work Responsible Person Draft Final


31/03/2023 06/04/2023
1 Drainage A. Plan SM Engineering
and B. Detail Drawing SM Engineering
Sewerage C. Specification SM Engineering
D. BOQ SM Engineering
E. Calculation and Report SM Engineering
2 Civil work A. Plan SM Engineering
of B. Detail Drawing SM Engineering
Electrical C. Specification SM Engineering
system and D. BOQ SM Engineering
Cable Box E. Calculation and Report SM Engineering
3 Fire A. Plan SM Engineering
Fighting B. Detail Drawing SM Engineering
System C. Specification SM Engineering
D. BOQ SM Engineering
E. Calculation and Report SM Engineering

Special Check of – Gray Zone