PROJECT NAME: CESARS HIDEAWAY SITE DEV PLAN

START DATE: SEPTEMBER 14, 2022


COMPLETION: OCTOBER 01, 2022 (Draft 01 – For evaluation with OCBO)

ASSIGNE DEADLIN
ITEM DESCRIPTION STATUS
D E
Site Development Plan Christian
Vicinity Map Christian
Perspective Christian

Architectural Fence Plan Christian


(For Building I Floor Plan Building Christian
and II) Elevation and Sections Building Christian
Reflected Ceiling Plan Building Christian
Door and Window Sched Building I Christian
Roof Plan Building Christian
Foundation Plan Building Sheena 09.23.2022
2F Framing Plan Building Sheena 09.23.2022
Roof Framing Plan Building Sheena 09.23.2022

Structural Footing Schedule Sheena 09.23.2022


(For Building I Beam Schedule Sheena 09.23.2022
and II) Column Schedule Sheena 09.23.2022
Truss Details Sheena 09.23.2022
Fence Structural Details Sheena 09.23.2022
Septic Structural Details Sheena 09.23.2022
Lighting Layout Christian
Electrical Power Layout Christian
Load Computation Sheena 10.01.2022
Waterline Layout Christian
Plumbing Sanitary Layout Christian
Septic Details Christian
CCTV Layout Sheena 10.01.2022
Electronics
FDAS Layout Sheena 10.01.2022
Mechanical Filtration System Computation Sheena 10.01.2022