Manage project time
BSBPMG531
Student Declaration
To be filled out and submitted with assessment responses
✓ I declare that this task and any attached document related to the task is all my own work and I have not
cheated or plagiarised the work or colluded with any other student(s)
✓ I understand that if I am found to have plagiarised, cheated or colluded, action will be taken against me
according to the process explained to me
✓ I have correctly referenced all resources and reference texts throughout these assessment tasks.
✓ I have read and understood the assessment requirements for this unit
✓ I understand the rights to re-assessment
✓ I understand the right to appeal the decisions made in the assessment

Unit Title
Unit Code
Paulo James C. Dizon
Student name

Student ID 66185
number
Student Paulo James C. Dizon Date 18/09/2022
signature

Task Number

BSBPMG531 - Manage project time V3 2021 Page 2


RTO Provider: 91153 - CRICOS Code: 02672K
greenwichcollege.edu.au
------OFFICE USE ONLY-----
For Trainer and Assessor to complete:

◻ Student requested reasonable adjustment for the assessment

Question Marking Sheet - Assessor to complete.

Did the student satisfactorily address each question as instructed:


Completed satisfactorily
S NYS DNS Comments
Question 1
Question 2
Question 3
Question 4
Question 5
Question 6
Question 7
Task Outcome: Satisfactory ☐ Not Yet Satisfactory ☐

Student Name: Paulo James C. Dizon

Assessor Name:

Assessor Signature:

Date:

BSBPMG531 - Manage project time V3 2021 Page 3


RTO Provider: 91153 - CRICOS Code: 02672K
greenwichcollege.edu.au
Table of Content

Student Declaration 2
Task 1 – Knowledge Questionnaire 5
Question 1 6
Question 2 6
Question 3 7
Question 4 7
Question 5 7
Question 6 8
Question 7 8
References 8

BSBPMG531 - Manage project time V3 2021 Page 4


RTO Provider: 91153 - CRICOS Code: 02672K
greenwichcollege.edu.au
Task 1 – Knowledge Questionnaire

Task summary and instructions

What is this assessment This assessment is a written questionnaire with a mix of objective and
task about? subjective questions.

The questionnaire is designed to meet the knowledge required to meet the


unit requirements safely and effectively.

The questions focus on the knowledge evidence required for this unit of
competency:

● estimation techniques to determine task duration and resource effort


● procedures for identifying critical path
● procedures for managing project baselines, establishment and variance
● project life cycle phases
● best-practice time management methodologies, their capabilities,
limitations, applications and outcomes
● key tools for project scheduling
● work breakdown structures and how they apply to project schedules.

Your assessor will be looking for demonstrated evidence of your ability to


answer the questions satisfactorily, follow instructions, conduct online
research and review real or simulated business documentation as instructed.
What do I need to do to ● submit your answers to the questions within the set timeframe,
complete this task ● answer all questions as instructed,
satisfactorily? ● answer all questions using your own words and reference any sources
appropriately,
● all questions must be answered satisfactorily.

It is advisable to:

● review the questions carefully,


● answer the questions using online research and the learning material
provided for the unit and by reviewing real or simulated relevant
business documentation (such as policies and procedures),
● further research the topics addressed in each question.

Specifications You must submit to GOALS the

● assessment coversheet,
● answers to all questions,
● references.

Resources and • computer with Internet access,


equipment • access to Microsoft Office suites or similar software,
• learning material.

BSBPMG531 - Manage project time V3 2021 Page 5


RTO Provider: 91153 - CRICOS Code: 02672K
greenwichcollege.edu.au
Task summary and instructions

Re-submission You will be provided feedback on your performance by the Assessor. The
opportunities feedback will indicate if you have satisfactorily addressed the requirements
of each part of this task. If any parts of the task are not satisfactorily
completed, the assessor will explain why, and provide you with written
feedback along with guidance on what you must undertake to demonstrate
satisfactory performance. Re-assessment attempt(s) will be arranged at a
later time and date. You have the right to appeal the outcome of assessment
decisions if you feel that you have been dealt with unfairly or have other
appropriate grounds for an appeal. You are encouraged to consult with the
assessor prior to attempting this task if you do not understand any part of
this task or if you have any learning issues or needs that may hinder you
when attempting any part of the task.

Answer all the questions below:

Question 1

Explain each of the following estimating techniques and how each can be used to
determine task duration and resource effort within a project.

Estimating techniques Explanation (40-80 words/estimating technique)


Analogous Estimating it is an approach that provides a cost estimate based on the data
provided using data from comparable projects. In order to prove the
data's reusability, analogous estimation must incorporate expert
opinion. When there is not enough knowledge about the project,
analogous estimation is employed.
Parametric Model Estimating is a method for estimating the time, money, and resources required
for a project to be successful that is based on statistics and accuracy.
Parametric estimating leverages the connection between variables to
get precise estimates by combining historical and statistical data.
3 Point Estimating In management and information systems applications, the three-point
estimating approach is used to create an approximative probability
distribution that represents the outcome of future occurrences, based
on relatively little information.
Expert Judgment Estimating It is a method of project estimating that relies on the expert's
assumption to evaluate quantitative project considerations, such as
deadlines and prospective assets.
Reserve Analysis An explanation of how to establish a saving for the plan term,
budget, assessed fetch, or stores for an extent by determining the
main highlights and connections of the several components inside the
project management plan.
Bottom-Up Analysis An approach focuses on looking at individual stocks. Thus, in
bottom-up investing, the speculator places more emphasis on a

BSBPMG531 - Manage project time V3 2021 Page 6


RTO Provider: 91153 - CRICOS Code: 02672K
greenwichcollege.edu.au
Estimating techniques Explanation (40-80 words/estimating technique)
specific firm than on the sector in which that company operates or
the overall state of the economy.

Question 2

Describe the critical path of a project and explain the steps used to identify it using the
Critical Path Method.

(50-100 words)

The Critical Path Method (CPM) is a method for determining schedule flexibility and identifying activities
required for project completion. The longest series of tasks that must be completed on schedule for the
project to be concluded is known as a critical path in project management. The rest of the project will be
delayed if important activities are delayed.
1. List Activities
2. Establish Dependencies
3. Make a Network Diagram
4. Gauge Task Duration
5. Calculate Critical Path
6. Determine the Float

Question 3

Explain the concept of a project baseline, the procedures for establishing project
baselines and how to manage adjustments to a project baseline due to a major change to
project scope, cost or schedule.

(80-120 words)

Project Baseline establishes the point at which the project will start, how its outcomes will be assessed at
each status reporting period, and how it will be compared to initial expectations. The creation of an extended
arrangement and the recognizable proof of the alterations that can be acknowledged or rejected amid the
execution life cycle are key components of the arranging and assessment preparation.
Making an extended pattern is simple to do, however it relies on your approach. For instance, you could use
the following techniques: Project Schedule (Contingency) and Project Budget Actuals

Question 4

Summarise the project life cycle phases and describe each phase.

BSBPMG531 - Manage project time V3 2021 Page 7


RTO Provider: 91153 - CRICOS Code: 02672K
greenwichcollege.edu.au
Project phase Summary and description (40-80 words/phase)
Initiation The initiation phase is the first phase of the whole project
management life cycle. This phase's goals are to define the initiative,
develop a business case for it, and secure approval. During this
period, the project director may perform any of the following: Make a
feasibility analysis, Create a project charter, Identify key stakeholders
and select tools for project management
Planning The planning phase is crucial to creating an extensive guide that the
entire team can follow. In order to match the requirements outlined
by the business, here is frequently where all of the nuanced parts
and objectives are diagrammed.
Implementation (execution) The majority of the extension occurs during the execution phase.
Deliverables are created to indubitably form the project's assembly
requirements. The majority of the time, resources, and people are
frequently committed to this part of the project. A kickoff assembly is
organised to confirm the formal start of the execution stage, as was
previously mentioned.
Closing (finalisation) Within the project management life cycle, the closure stage could be
a fundamental phase. It marks the project's formal end and provides
time for reflection, wrapping up, and material organising.

Question 5

Select and explain three best-practice time management methodologies. For each,
summarise their capabilities, limitations, applications and outcomes.

Best-practice time management Explanation and summary of capabilities, limitations,


methodologies applications and outcomes. (50-100 words/best practice)
Pareto Analysis According to the presentation, Vilfredo Pareto, an Italian financial
expert, may have invented the 80/20 rule. The idea holds that 20%
of actions may provide 80% of results. The goal of the Pareto
analysis is to help you select tasks that are most effective in solving
problems.
Pomodoro Technique This method uses a clock to divide your work into intervals. Due to
Cirillo's tomato-shaped clock, each interval is referred to as a
Pomodoro. The Pomodoro technique not only teaches you how to
manage your time effectively, but also how to develop goals and
carry them through. You'll be able to better stick to your week by
week and day by day plans.
Rapid Planning Method (RPM) RPM, often known as a "outcome, rationale, and massive activity
plan," stands for "rapid arranging method." Motivational speaker Tony
Robbins developed it as a strategy to get your mind ready to focus on
a picture of what you need so that you'll make it genuine.

Question 6

Summarise the following key tools for project scheduling.

BSBPMG531 - Manage project time V3 2021 Page 8


RTO Provider: 91153 - CRICOS Code: 02672K
greenwichcollege.edu.au
Schedule Network Analysis
Schedule Network Analysis A technique that is frequently used in extension administration. The
approach entails visualising the various project tasks and connecting
them inside the project management framework.
Critical Path Analysis According to Critical Path Analysis, some tasks are required to be
finished on time in order for the project as a whole to be finished on
time. It also knows which jobs may be put off in case resources need
to be redistributed to catch up on neglected or intrusive errands.
Schedule Compression Schedule compression refers to a group of techniques used to
shorten the duration of a project without sacrificing the outcome.
Slamming, fast-tracking, and asset reallocation are examples of
common plan compression techniques.

Question 7

Explain how a work breakdown structure is used to create project schedules (50-100
words).

A Work Breakdown Structure (WBS) separates tasks and products that are connected across a certain
distance. Each element of the WBS that promotes budgeting and the job of responsibilities has an associated
asset. The WBS may be used to determine the extend's fundamental strategy and create the extend plan.

References

Please include your references below:

(Please refer to this referencing guide if needed or speak to your trainer for any specific referencing
requirements for this assessment)

McConnell, E. (2012, September 11). Project Baseline and How to Manage It.
Mymanagementguide.com. https://mymanagementguide.com/project-baseline-how-to-manage/
Raeburn, A. (2022, June 30). Better project management starts with expert judgment. Asana.

https://asana.com/resources/expert-judgment

Team Asana. (2021, July 5). Critical Path Method: How to Use CPM for Project Management •

Asana. Asana. https://asana.com/resources/critical-path-method

BSBPMG531 - Manage project time V3 2021 Page 9


RTO Provider: 91153 - CRICOS Code: 02672K
greenwichcollege.edu.au
University of St. Augustine for Health Sciences. (2019, October 3). 9 Popular Time Management

Techniques and Tools. University of St. Augustine for Health Sciences.

https://www.usa.edu/blog/time-management-techniques/

Wrike. (2019). Understanding the Project Lifecycle | Project Management Guide. Wrike.com.

https://www.wrike.com/project-management-guide/project-lifecycle/