Drafting Services By : AF Check:
4477-BWO –Barossa
1 Summary
1 SUMMARY ................................................................................................................................................................ 2
2 GENERAL ................................................................................................................................................................... 3
5 LIFTING ANALYSIS...................................................................................................................................................... 7
2 General
Based on reference files and meeting with Propak/IST on 13th April 2022, the lifting structure and
connections design was conducted based on this calculation sheet.
216437-WTREC-RevC2
CISC-S16-19
AISC 15TH EDITION
BTH 2020
3.3 Units
Length mm
Elevation mm
Load kN
Stress MPa
3.5 Materials
3.6 Software
Staad Pro V8i Version 20.07.11.90 by Bentley Systems Inc. Licensed to HyperShell
Consultants Inc.
5 Lifting analysis
Lug
Lug
Lug plate
IPN260 Flange
25 mm THK
to IPN260 flange
Shall be welded
Dhole = 2.5” R = 115
10
200
10
22.5”
220
12”
12”
IPN260
10
Lug plate
IPN260 Flange
25 thk.
to IPN260 flange
Shall be welded
Dhole = 2.5” R = 115
10
200
10
3 sides
564
220
300
300
IPN260
10
Lug 1
Lug 2
10
Dhole = 2”
R = 75 Dhole = 2”
R = 100
Lug 1 Lug 2
Lug plate
20 mm THK. Lug plate
casing
15 mm THK
STIFF PL
100
6
100
10 THK
6
6 Stiff. PL
Typ. 3 sides
6 10 THK
UPN200
UPN200
6 Typ. 3 sides
150 8 6
Dhole = 2.5”
R = 100 mm
Lug plate
25 mm THK.
10
TYP
100
TYP
6
50
Added HE200B
Dhole = 2.5”
R = 112
Lug plate
25 mm THK.
10
3 sides
10
180
HE260B
200
10
HE260B
200
Lug 1
300
Dhole = 2.5”
R = 100 mm
Lug plate
25 mm THK.
6
10
TYP
100
TYP
6
50
6
Exist UPN200 Added HE200B Exist UPN200
6
Casing
6
STIFF PL
10 THK N.S/F.S 3 sides 6
HE160B
5.6 Y-Duct
5.6.1. Jacking
The idea is to support the Y-duct on top of the existing floor at T.O.S. EL +47000 until connecting the
Y-Duct to the Inlet Plenum (OTSG).
Staad analysis
Staad model to check the Y-Duct integrity for the jacking system.
All members and casing plates around jacking point pass the own weight of the Y-Duct.
Jacking Location
Connection Details
5.6.2. Shipping
Staad analysis
Staad model to check the Y-Duct integrity for the shipping system.
All members and casing plates around shipping skid beams support point pass the own weight of the
Y-Duct.
Skid location
Connections
Chevron Connection
Chevron to HE200B
Chevron to UPN200
5.6.3. Lifting
Lug 1
capacity = 11800 kg
Dhole = 2.5”
R = 100 mm
10
STIFF PL
15 THK N.S/F.S Lug plate
35 mm THK.
TYP
100
TYP
6
50
50
Added HE200B
Lug 2
capacity = 9100 kg
Lug 2
Lug 2
Dhole = 2.5”
R = 85
Lug plate
25 mm THK.
10
3 sides
10
150
HE200B
250
10
HE200B
150
Lug 3
capacity = 9100 kg
Lug 3
Lug 3
Lug 3
Lug 3
Lug plate
Dhole = 2.5” 25 mm THK.
R = 85
10
3 sides
10
100
10
UPN160
250
HE200B
150
As the inlet duct has been split, no need to ship the inlet on its side, but keep it upright.
Uprighting process will not be required, and the shipping and installation position will be same.
Lifting procedure:
Lug details
capacity = 1900 kg