Customer : Page : 1 of 45

Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

IST, A Division of Propak Systems Ltd.

4477-BWO –Barossa

Lifting design and lugs

3 19/06/2022 Inlet duct bolted lifting lug AF


2 16/06/2022 Y-duct lifting, Inlet duct lifting AF
Update loads, Y-duct jacking, shipping, and lifting
1 06/06/2022 AF
Inlet duct lifting
0 22/04/2022 Preliminary AF
Rev Date Revision Description By Check App.

All rights reserved © HyperShell Consultants inc.


Customer : Page : 2 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

1 Summary

1 SUMMARY ................................................................................................................................................................ 2

2 GENERAL ................................................................................................................................................................... 3

3 REFERENCES AND GENERAL INFORMATION .............................................................................................................. 4

3.1 REFERENCE DOCUMENTS ................................................................................................................................................ 4


3.2 CODES AND STANDARDS ................................................................................................................................................. 4
3.3 UNITS ......................................................................................................................................................................... 4
3.4 AXES DEFINITION ........................................................................................................................................................... 5
3.5 MATERIALS .................................................................................................................................................................. 5
3.6 SOFTWARE ................................................................................................................................................................... 5

4 INLET DUCT WEIGHTS ................................................................................................................................................ 6

5 LIFTING ANALYSIS...................................................................................................................................................... 7

5.1 OTSG EXHAUST HOOD ................................................................................................................................................... 7


5.2 WHRU EXHAUST HOOD + OUTLET DAMPER + RECT. ELBOW................................................................................................. 8
5.3 WHRU ELBOW DUCT .................................................................................................................................................... 9
5.4 OTSG/WHRU INLET PLENUM/DUMPBOX DUCT.............................................................................................................. 10
5.5 Y-DUCT ..................................................................................................................................................................... 15
5.5.1. Jacking ........................................................................................................................................................... 15
Staad analysis ................................................................................................................................................................................. 16
Jacking Location ............................................................................................................................................................................. 17
Connection Details ......................................................................................................................................................................... 18
5.5.2. Shipping ......................................................................................................................................................... 21
Staad analysis ................................................................................................................................................................................. 22
Skid location ................................................................................................................................................................................... 23
Skid member size ........................................................................................................................................................................... 24
Connections ................................................................................................................................................................................... 25
5.5.3. Lifting ............................................................................................................................................................. 34
5.6 INLET RECTANGULAR DUCT ............................................................................................................................................ 43

All rights reserved © HyperShell Consultants inc.


Customer : Page : 3 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

2 General

Based on reference files and meeting with Propak/IST on 13th April 2022, the lifting structure and
connections design was conducted based on this calculation sheet.

All rights reserved © HyperShell Consultants inc.


Customer : Page : 4 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

3 References and General Information

3.1 Reference Documents

 4477-BWO-N-FD-00001_E - Topside structural basis of design

 OTSG and WHRU report file by BWO

 Lifting Analysis pdf file by IST

 3D model: Integrated M90 M91 STR and Vendor Model_08-June-22

 Lifting STAAD models by Simon Landreville (HS)

 216437-WTREC-RevC2

3.2 Codes and Standards

The codes used for design are as follows:

 CISC-S16-19
 AISC 15TH EDITION
 BTH 2020

3.3 Units

Units are used according to SI system:

Length mm
Elevation mm
Load kN
Stress MPa

All rights reserved © HyperShell Consultants inc.


Customer : Page : 5 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

3.4 Axes definition

X Longitudinal direction, positive forward


Y Transverse direction, positive toward portside from centreline
Z Vertical direction, positive upwards from baseline

3.5 Materials

W-members DNV-GL-VL D36 Metric beams HEB260


C- & Angles DNV-GL-VL D36 C6 or C8 UPN200 or UPN250
Plates DNV-GL-VL D36 no corrosion allowance required
Welds FEXX = 70 ksi (480 MPa)

3.6 Software

 Staad Pro V8i Version 20.07.11.90 by Bentley Systems Inc. Licensed to HyperShell
Consultants Inc.

All rights reserved © HyperShell Consultants inc.


Customer : Page : 6 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

4 Inlet duct weights

The weights are extracted from the document 216437-WTREC-RevC2

All rights reserved © HyperShell Consultants inc.


Customer : Page : 7 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

5 Lifting analysis

5.1 OTSG exhaust hood

Lug capacity = 9000 kg

Lug
Lug

Lug plate
IPN260 Flange
25 mm THK
to IPN260 flange
Shall be welded
Dhole = 2.5” R = 115

10
200

10
22.5”

220
12”

12”

IPN260

10

All rights reserved © HyperShell Consultants inc.


Customer : Page : 8 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

5.2 WHRU exhaust hood + Outlet Damper + Rect. Elbow

Lug capacity = 9000 kg

Lug plate
IPN260 Flange
25 thk.
to IPN260 flange
Shall be welded
Dhole = 2.5” R = 115

10
200

10
3 sides
564

220
300

300

IPN260
10

All rights reserved © HyperShell Consultants inc.


Customer : Page : 9 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

5.3 WHRU Elbow duct

Lug capacity = 2000 kg

Lug 1

Lug 2

10

Dhole = 2”
R = 75 Dhole = 2”
R = 100
Lug 1 Lug 2
Lug plate
20 mm THK. Lug plate
casing

15 mm THK

STIFF PL
100

6
100

10 THK
6

6 Stiff. PL
Typ. 3 sides
6 10 THK
UPN200
UPN200
6 Typ. 3 sides
150 8 6

All rights reserved © HyperShell Consultants inc.


Customer : Page : 10 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

5.4 OTSG Inlet Plenum/DumpBox duct

Lug 1 capacity = 8900 kg

Dhole = 2.5”
R = 100 mm
Lug plate
25 mm THK.

10
TYP
100

TYP
6
50

Added HE200B

Exist HE200B 300 Exist HE200B


6
STIFF PL
10 THK N.S/F.S 3 sides 6

All rights reserved © HyperShell Consultants inc.


Customer : Page : 11 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

Lug 2 capacity = 11800 kg

Dhole = 2.5”
R = 112

Lug plate
25 mm THK.

10
3 sides
10
180

HE260B
200

10

HE260B
200

All rights reserved © HyperShell Consultants inc.


Customer : Page : 12 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

5.5 WHRU Inlet Plenum/DumpBox duct

Lug 1 capacity = 6600 kg

All rights reserved © HyperShell Consultants inc.


Customer : Page : 13 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

Lug 1

300

Dhole = 2.5”
R = 100 mm
Lug plate
25 mm THK.
6
10
TYP
100

TYP
6
50

6
Exist UPN200 Added HE200B Exist UPN200
6

Casing
6
STIFF PL
10 THK N.S/F.S 3 sides 6
HE160B

All rights reserved © HyperShell Consultants inc.


Customer : Page : 14 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

Lug 2 of WHRU is the same as Lug 2 of OTSG (Page 11)

All rights reserved © HyperShell Consultants inc.


Customer : Page : 15 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

5.6 Y-Duct

5.6.1. Jacking

The idea is to support the Y-duct on top of the existing floor at T.O.S. EL +47000 until connecting the
Y-Duct to the Inlet Plenum (OTSG).

All rights reserved © HyperShell Consultants inc.


Customer : Page : 16 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

Staad analysis

Staad model to check the Y-Duct integrity for the jacking system.
All members and casing plates around jacking point pass the own weight of the Y-Duct.

All rights reserved © HyperShell Consultants inc.


Customer : Page : 17 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

Jacking Location

All rights reserved © HyperShell Consultants inc.


Customer : Page : 18 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

Connection Details

All rights reserved © HyperShell Consultants inc.


Customer : Page : 19 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

All rights reserved © HyperShell Consultants inc.


Customer : Page : 20 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

All rights reserved © HyperShell Consultants inc.


Customer : Page : 21 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

5.6.2. Shipping

All rights reserved © HyperShell Consultants inc.


Customer : Page : 22 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

Staad analysis

Staad model to check the Y-Duct integrity for the shipping system.
All members and casing plates around shipping skid beams support point pass the own weight of the
Y-Duct.

All rights reserved © HyperShell Consultants inc.


Customer : Page : 23 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

Skid location

All rights reserved © HyperShell Consultants inc.


Customer : Page : 24 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

Skid member size

All rights reserved © HyperShell Consultants inc.


Customer : Page : 25 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

Connections

Connection UPN200 to HE200B


Six locations

All rights reserved © HyperShell Consultants inc.


Customer : Page : 26 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

Connection UPN200 & L75x75x6 to HE200B


Eight locations

All rights reserved © HyperShell Consultants inc.


Customer : Page : 27 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

Connection UPN200 & 2L75x75x6 to HE200B


Four locations

All rights reserved © HyperShell Consultants inc.


Customer : Page : 28 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

Connection UPN200 & L75x75x6 to UPN200


Four locations

All rights reserved © HyperShell Consultants inc.


Customer : Page : 29 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

All rights reserved © HyperShell Consultants inc.


Customer : Page : 30 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

All rights reserved © HyperShell Consultants inc.


Customer : Page : 31 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

Chevron Connection

All rights reserved © HyperShell Consultants inc.


Customer : Page : 32 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

Chevron to HE200B

All rights reserved © HyperShell Consultants inc.


Customer : Page : 33 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

Chevron to UPN200

All rights reserved © HyperShell Consultants inc.


Customer : Page : 34 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

5.6.3. Lifting

Lug 1
capacity = 11800 kg

Dhole = 2.5”
R = 100 mm
10

STIFF PL
15 THK N.S/F.S Lug plate
35 mm THK.
TYP
100

TYP
6
50

50
Added HE200B

Exist HE200B 400 Exist UPN200


8
STIFF PL
15 THK N.S/F.S 3 sides 8

All rights reserved © HyperShell Consultants inc.


Customer : Page : 35 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

Lug 2
capacity = 9100 kg

All rights reserved © HyperShell Consultants inc.


Customer : Page : 36 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

Lug 2

All rights reserved © HyperShell Consultants inc.


Customer : Page : 37 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

Lug 2

Dhole = 2.5”
R = 85

Lug plate
25 mm THK.

10
3 sides
10
150

HE200B
250

10

HE200B
150

All rights reserved © HyperShell Consultants inc.


Customer : Page : 38 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

Lug 3
capacity = 9100 kg

All rights reserved © HyperShell Consultants inc.


Customer : Page : 39 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

Lug 3

All rights reserved © HyperShell Consultants inc.


Customer : Page : 40 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

Lug 3

All rights reserved © HyperShell Consultants inc.


Customer : Page : 41 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

Lug 3

All rights reserved © HyperShell Consultants inc.


Customer : Page : 42 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

Lug 3

Lug plate
Dhole = 2.5” 25 mm THK.
R = 85
10
3 sides
10
100

10

UPN160
250

HE200B
150

All rights reserved © HyperShell Consultants inc.


Customer : Page : 43 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

5.7 Inlet rectangular duct

As the inlet duct has been split, no need to ship the inlet on its side, but keep it upright.
Uprighting process will not be required, and the shipping and installation position will be same.

Lifting procedure:

All rights reserved © HyperShell Consultants inc.


Customer : Page : 44 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

Lug plate location:

All rights reserved © HyperShell Consultants inc.


Customer : Page : 45 of 45
Engineering and
Drafting Services By : AF Check:

Subject : 4477-BWO –Barossa Date : 19/06/2022


Project : 4477-BWO –Barossa
Lifting analysis and lug design REV. : 3

Lug details
capacity = 1900 kg

All rights reserved © HyperShell Consultants inc.