Reviewer on Professional Practice

RA 545, history of architectural organizations, code of ethics and spectrum of architectural services

1. When was the birth of the first professional 14. The act to regulate the practice of architecture in
association of architects, civil engineers and the Philippines. a) RA 544 b) RA 545 c) PD 957
surveyors in the Philippines? a) September 14, d) Architects Code
1902 b) June 17, 1950 c) June 16, 1050 d) 15. Which is not a qualification to become a member
December 21, 1945 of the Board of Architecture? a) Filipino citizen
2. Who was the first president of the first b) holder of BS Architecture c) licensed architect
professional association of architects, civil d) faculty member of a school
engineers and surveyors in the Philippines? a) 16. What is the term for the members of the Board of
Tomas Mapua b) Juan Nakpil c) Guillermo Architecture? a) three years b) five years c) six
Tolentino d) Guillermo Gardiner years d) four years
3. What was the name of the first professional 17. The licensure examination for architects is
association of architects, civil engineers and mandated by _____. a) National Building Code
surveyors in the Philippines? a) Academia de b) Architects' Code of Ethics c) United
Ingeniera, Arquitectura y Agrimensura de Architects of the Philippines d) RA 545
Filipinas b) Philippine Institute for Architects c) 18. The number of years that the architects are liable
Academia de Arquitectura y Agrimensura de for buildings they design. a) 10 b) 15 c) 25 d) 50
Filipinas d) League of Philippine Architects 19. It was organized to foster growth and renewal of
4. In 1904, the first school of architecture was urban and rural communities in an integrative
founded in the Philippines. What is its name? a) manner that promotes optimum land-use,
Escuela de Ingenieria y Arquitectura b) adequate shelter and environment protection. a)
University of the Philippines c) National National Home Mortgage and Finance
University d) Bauhaus Corporation b) Home Development and Mutual
5. The profession for engineers and architects was Fund c) National Housing Authority d) Housing
first recognized in 1921 by the National and Land Use Regulatory Board
Assembly. This is called the _____. a) Act No. 20. Which office administers the provident savings
2985 b) Republic Act 545 c) Act of 1933 d) Act fund for housing .a) Home Financing
of 1921 Corporation b) Home Development Mutual Fund
6. The first batch of Filipino architects were c) Pag-ibig Fund d) National Home Mortgage
registered under the name of _____. a) architects and Finance Corporation
b) engineers c) foreman d) maestro de obras 21. The agency tasked for the building of housing
7. The first recorder Filipino architect. a) Tomas units and residential condominiums. a) National
Mapua b) Felix Arroyo Roxas c) Jose Rizal d) Housing Authority b) Chamber of Realtors and
Felix Manalo Builders Association c) Home Insurance
8. The Philippine Institute for Architects came from Guarantee Corporation d) Philippine
_____. a) AAAF b) League of Philippine Constructors Association
Architects c) Association of Philippine 22. The office that coordinates and supervises the
Government Architects d) Philippine Architects Philippine government housing agencies. a)
Society HUDCC b) SSS c) Pag-Ibig d) Unified Home
9. PIA was founded in _____. a) 1902 b) 1775 c) Lending Program
1898 d) 1933 23. Programming is under the _____ services of an
10. What was the name of the first official newsletter architect. a) construction b) design c) pre-design
of PIA? a) Architects' Journal b) Bricks c) The d) specialized allied
Grid d) krokis 24. The process of preparing the construction
11. When was the League of Philippine Architects documents and specifications to set forth all the
founded? a) August 05, 1950 b) June 17, 1950 c) details for architectural, structural, mechanical,
January 23, 1957 d) September 14, 1902 electrical, sanitary and plumbing. a) design
12. The Architects National Code was officially development phase b) schematic design
adopted by the Board of Examiners for development phase c) construction phase d)
Architects in _____. a) October 30, 1965 b) contract document phase
January 23, 1957 c) June 17, 1950 d) June 16, 25. Industrial buildings belong to the _____ category
1950 of project classification. These are simple
13. When was the United Architects of the structures and have a utilitarian character. a)
Philippines founded? a) 1975 b) 1973 c) 1975 d) group I b) Group II c) Group III d) Group IV
1962

Page 1 of 4
26. "Site selection" belong to the _____ services of architect without duly notifying the architect
an architect. a) regular design b) comprehensive concerned… a) relationship with manufacturers,
c) pre-design d) post-construction dealers and agents b) relationship with client c)
27. What is the minimum basis fee for Group 2 relationship with colleagues and subordinates d)
buildings? a) 6% b) 7% c) 8% d) 10% relationship with contractor
28. What is the minimum basic fee for the design of 41. When undertaking a renovation project, the
mausoleums and memorial shrines? a) 7% b) architect should do this… a) undertake the
10% c) 12% d) 20% project on a design-build basis b) get building
29. What is the total design fee for four identical permit c) ask permission from the owner d)
residential buildings that cost PhP 2million notify the original designer
each.? a) 800,000 b) 560,000 c) 400,000 d) 42. When an owner approaches an architect
320,000 requesting for a proposal but the architect is in
30. What is the professional fee for a renovation doubt whether an architect has already been
project of hospitals. a) 8% b) 12% c) 10% d) 6% commissioned for the project. This should be
31. What is the customary percentage of payment to done…a) ignore the doubt and propose anew b)
the architect upon the signing of contract? a) ascertain the doubt and refrain if an architects
15% b) 10% c) 20% d) 5% has been commissioned already c) turndown the
32. How much percentage of the fee is the architect project d) take the opportunity and disregard
entitle upon the completion of the contract whatever the client has done before
documents? a) 85% b) 15% c) 35% d) 50% 43. The architect has been a offered sample tile for
33. Whose responsibility is it to give information on heavy traffic areas. This tiles will be installed for
site ownership and topographical surveys. a) free in the architect's house. The architect can
architect b) owner c) contractor d) project take this step… a) accept the offer provided that
manager the architect pay for the labor and materials b)
34. Whose responsibility is it to pay for design not accept the offer at all c) insist that the sample
consultation on acoustics and communication tiles be installed on heavy traffic areas d) the
systems. a) owner b) contractor c) architect d) architect should insist that these tiles be donated
client to charitable institutions
35. The payment to the architect more than the 44. Why is it that the architect should not accept free
regular design fee to compensate for out of town engineering services, or receive substantial gifts
trips beyond 100 kilometers from the established or commissions in favor of any contractor? a)
office. a) pre-design services b) per diem c) because this is unethical b) because the
arbitration fee d) consultancy fee contractor's design is inferior c) because this
36. The cost of completed structure to the owner, places the architect under moral obligation d)
including plumbing and electrical fixtures, because the owner has paid the architect already
mechanical equipment, communication and 45. The architect should refrain from taking part in
electronic system, elements attached to the paid advertisement that endorse any materials of
building and all items indicated in the drawings. equipment… a) relationship with contractor b)
a) bid price b) project construction cost c) relationship with manufacturers, dealers and
architect's estimate d) bill of materials agents c) relationship with the people d)
37. Limit the architect's presentation to a prospective relationship with colleagues and subordinates
client sample of work… a) relationship to client 46. The fee for landscape design services… a) 12%
b) relationship to colleagues and subordinates c) to 20% b) 7% to 10% c) 10% to 15% d) 15% to
relationship to client d) relationship to people 20%
38. To not knowingly compete with other architects 47. Which is not a specialized allied service of an
on the basis of fee differences … a) relationship architect? a) landscaping b) interior designing c)
with colleagues b) relationship with contractor c) acoustic engineering d) programming
relationship with client d) relationship with 48. The art and science of ordering the use of land
dealers and siting of buildings and communication
39. To not avail of technical services which may be routes to secure the maximum practicable degree
accompanied by obligation that is detrimental to of economy, social amenities, convenience and
the best interest of the client… a) relationship aesthetics. a) physical planning b)
with manufacturers, dealers and agents b) comprehensive planning c) land-use planning d)
relationship with client c) relationship with zoning
people d) relationship with contractor 49. The planning of industrial estates and
40. To not undertake renovation project of a building commercial centers is a type of _____ services.
that has been previously undertaken by another

Page 2 of 4
a) regular design b) landscaping c) administration c) building maintenance d) post
comprehensive services d) physical planning construction evaluation
50. The fee for physical planning is based on _____. 63. The type of architectural service that spans from
a) building area b) cost of the project c) multiple predesign to post construction. a) comprehensive
of direct personal expense d) area of planning b) phsycial planning c) specialized
development allied services d) comprehensive architectural
51. The range of all services offered by the services
environmental planner from data base gathering 64. Comprehensive architectural services… a)
to environmental impact statements up to the construction management b) post construction
formulation of the master development plan. a) services c) regular design services d) project
land-use planning b) physical planning c) project management
management d) comprehensive planning 65. Two types of design building service… a)
52. Which is not a component of a master regular design and by administration b) by-
development plan? a) physical b) economic c) administration and guaranteed maximum cost c)
socio-cultural d) political regular design and construction services d) pre-
53. The study that is concerned with studying and design and regular design
identifying the possible outcome of a particular 66. The money that is entrusted by the owner to the
development to a specific development of a site. architect so that the construction can operate.
a) environmental compliance certificate b) This money is subject to liquidation by the
biodiversity c) environmental protection d) architect to the owner. a) revolving capital b)
environmental impact statement budget c) estimated project construction cost d)
54. Architect's construction service that includes liquidated damages
quality control of work, evaluation and carrying 67. The type of design-build engagement where the
out of construction work and keeping or records. architect shares certain liabilities on the cost of
a) construction management b) project the project and at the same time have the
management c) comprehensive service d) full- opportunity to benefit should the final cost of the
time supervision project does not exceed the budget. a) by
55. When the architect performs construction administration b) performance bond c) guarantee
services he is working under the ____. a) bond d) guaranteed maximum cost
contractor b) owner c) sub-contractor d) 68. What will happen with this case? The guaranteed
consultants maximum cost is PhP 5million. The actual cost
56. The task of assisting the contractor in the is PhP 4.5million. a) PhP 0.5million goes to the
interpretation of contract documents… a) records owner b) PhP 0.5million is divide between the
keeping b) controlling quality c) inspecting d) architect and owner c) PhP 0.50million goes to
evaluating the architect d) PhP 50k goes to the architect and
57. reviewing and verifying the nature, quantities the PhP 450k goes to the owner
and contractor's prices on change orders claimed 69. Which is not a method of selection of architects?
by the contractor… a) evaluating b) records a) direct selection b) fee bidding c) comparative
keeping c) inspecting d) controlling quality selection d) design competition
58. Who initiates change orders? a) contractor b) 70. When comparing architects, which is not
owner c) sub-contractor d) architect considered? a) date of organization b) client
59. Critical path method is used for _____. a) reference c) number of technical staff d)
quality control b) scheduling c) cost control d) proposed fee
value engineering 71. A method of architect's compensation which is
60. Which is not a post construction service? a) based on the project cost. a) percentage b)
building maintenance b) equipment maintenance personnel expense c) per diem d) fixed fee
c) programming d) building administration 72. The type of architects' compensation that is
61. Architect's service that seeks to determine the generally adopted by government agencies. a)
effectiveness of the various building systems and multiple of personnel expense b) percentage c)
functional effectiveness of the plan… a) grounds mixed method d) fixed fee
administration b) equipment and building 73. A type of architect's compensation that applies to
maintenance c) building administration d) post none creative designing work such as attendance
construction evaluation to meetings and ocular inspection of sites. a)
62. Billing of building tenants for rentals and utilities percentage b) fixed fee c) multiple of direct
and monitoring of security and janitorial personnel expense d) per diem and reimbursable
services… a) equipment maintenance b) building expense

Page 3 of 4
74. The multiple of direct personnel expense utilizes 75. A compensation type that is based on technical
a multiplier. This is for _____. a) tax and hour expended by consultants, technical staff and
contingencies b) overhead and profit c) architects. a) percentage b) multiple of direct
allowance and travel d) consultants and personnel expense c) fixed fee d) professional
professionals fee plus expense.
*****

Page 4 of 4