SERVICES : Design Drawing DATE: 1-Oct-2021

Denote as: P/Mgr : Project Manager / S-Eng : Site Engineer


T-Lea : Team Leader / S-Wor : Skilled Worker (Technician / Electrician / Fitter / Welder / Plumber) / Work : Worker (Helper)

LOCATION STAFFINGS Sub-


N Name DESCRIPTION/WORKER ACTIVITIES Body Temperature REMARKS
Level G/Line HR P/Mgr S/Eng T/Lea S/Wor Work Total
A SITE OFFICE WORKS

1 Sous seryrainsey 36.5 1 1

2 Muth davery 36.4 1 1

3 Hor Kosal BOQ Fire Hydrant at The Palm 36.3 1 1

4 Yin Bunthoeun 0 0

5 Chhut Chomreun 0 0

6 Oeun Panha 0 0

7 Theng Sameng Shop drawing FF water at FAO project 36.3 1 1

8 Chea Phirum 0 0

9 Mut Phary Shop drawing Sewage water at FAO project 36.4 1 1

10 Mao Seavlang Revise Sleeve at FAO project 36.3 1 1

11 Sem Sreykhe Shop drawing Rain water at FAO project 1 1

12
Summary Carried Forward 2 1 4 0 0 0 7

TOTAL SUMMARY 2 1 4 0 0 0 7