ACTION TRACKING OF FIRE PROTECTION SYSTEM TESTING

NO. DATE LOCATION DESCRIPTION PICTURES DEFECT NO. STATUS REMARK

Genangan air di UCA sisi


timur dan antara turbine - Done
UBA 20
1 3-Jan-22 Cable Tunnel

1 lampu mati di UCA sisi


2022/254 Done
timur

Spare Sarang burung di


2 10-Jan-22 Done
Transformer beberapa titik

Baut gland packingnya


3 9-Feb-22 Crusher isolation valve for EAC 2022/3791 Done
53 tail end korosif

Lampu Emergency Exit


Engineering
4 15-Feb-22 mati di ground floor sisi 2022/4306 In Proggress
Building
barat

Baut pada fire bell longgar 2022/6728 In Proggress

5 2-Mar-22 UBX Building


Lampu Emergency Exit
5 2-Mar-22 UBX Building mati di ground floor sisi 2022/6718 In Proggress
timur dan barat

4 lampu pada switchgear


2022/6727 In Proggress
mati