In cold conditions, synthetic oil or ensuring circulated oil should be used when cutting pipe to prevent issues.
The procedure involves excavating the site, attaching slings to control pipe swing, evacuating the line per purging and drain procedures, and preparing for the cut by considering NDT, determining cut location allowing extra pipe, removing coating and cleaning the area.
In cold conditions, synthetic oil or ensuring circulated oil should be used when cutting pipe to prevent issues.
The procedure involves excavating the site, attaching slings to control pipe swing, evacuating the line per purging and drain procedures, and preparing for the cut by considering NDT, determining cut location allowing extra pipe, removing coating and cleaning the area.
In cold conditions, synthetic oil or ensuring circulated oil should be used when cutting pipe to prevent issues.
The procedure involves excavating the site, attaching slings to control pipe swing, evacuating the line per purging and drain procedures, and preparing for the cut by considering NDT, determining cut location allowing extra pipe, removing coating and cleaning the area.
NOTE: In cold conditions, consider using synthetic oil or ensure the
oil in the power units has been circulated prior to cutting.
Procedure Cutting the
Pipe l. Excavate the site and install pipe supports. 2. Attach slings to control swing of the pipe.
BOOK 3: PIPELINE Section
FACILITIES PROCEDURES Subject
E*IVBRIDGE Cutting the Pipe with Wachs or Fein Saw
Purpose To cut hot pipelines for repair or modification using a Wach
Related Standards Company
Book 2: Safety 03-02-01 Safê Work Permit — Hazard Assessme 11-02-01 Tool Operation Tab 13 Personal Protective Equipment 14-02- Equipment
Book 3: Pipeline Facilities
Tab 04 Trenching and Excavations 06-03-01 Grounding Pipe for Induced Voltage 06-03-03 Drainup/Linefill 06-03-06 Purging the Pipeline with Nitrogen 06-03-21 Bonding.for Static Electricity Requirements Prerequisite Before using pipe saws, check: for loose, missing or broken parts the condition an the cutter wheel and guide wheels or rollers t has all the parts, spare parts, and accessories needed f 3. Evacuate the line as per 06-03-03 Drainup/Linefill and 06- 03-06 Purging the Pipeline with Nitrogen.
4. Prepare to make the cut:
a) NDT should be considered before making a cut. b) Determine where the cold cut will be made on the pipe, allowing extra pipe for hot cuts and fit-up. c) Remove the pipeline coating and clean the immediate area. March 31, 2010 Page I of 3 This document is uncontrolled unless contained within a Contro//ed Copy O&MP Manua/ or Then wèwed on the Pipeline Safety Compliance Sharepoint website.