Project :
Reference Calculation
(A) Details
Gradient at = 1: 100
= 1.000 %
Adopt to = 20 min
The total basin volume required for the site = 300 x 4.1
= 1,230 m3
Settling Zone
Table 12.17 Required settling zone, V1 = 615 m3 (half the total volume)
file:///conversion/tmp/scratch/507280082.xlsx
DR YG TAN JURUTERA PERUNDING SDN BHD
Project :
Reference Calculation
Sediment Storage Zone
At Base, WB
= W1 - 2 x Z x( y1/2 + y2 ) = 16 m
At Base, LB
= L1 - 2 x Z x( y1/2 + y2 ) = 48 m
Depth
Settling Zone, y1 = 0.6 m
Table 12.17 The spillway for this sediment basin must be designed for 10-year ARI.
The sill level must be set a minimum 300mm above the basin top water level.
To simplify the calculations the following assumption are made:
- assume riser pipe flow iis orifice flow through the top of the pipe only
- riser pipe head is 300m, i.e. the height between the top of the pipe and the spillway crest level
where:-
i = the average rainfall intensity (mm/hr) for selected ARI (T) and storm duration (d);
T = average recurrence interval, ARI (years);
d = storm duration (hours); 0.20 ≤ d ≤ 72
λ, K, θ & η = fitting constants dependent on the raingauge location JPS Sungai Manggis
file:///conversion/tmp/scratch/507280082.xlsx
DR YG TAN JURUTERA PERUNDING SDN BHD
Project :
Reference Calculation
Appendix 2.B λ = 56.0520
Table 2.B1 K = 0.1520
θ = 0.1940
η = 0.8570
Itc = 137.65 mm/hr
Orifice size, Do = 50 mm
Cd = 0.62 (use 0.6 for Do < 50 mm, 0.62 for Do >= 50 mm)
Area for each orifice, Ao = 1.97E-03 m2
At height of increments of 200 mm, starting at the bottom of the pipe, put:
1 rows of 4 x 50 mm (orifices evenly spaced
around the sump)
(c ) Determination of Qriser
Try Dimension
Emergency spillway base width, B = 2 m
Effective head on the spillway crest, Hp = 0.3 m
Table 2.7 Spillway discharge coefficient, Csp = 1.83