You are on page 1of 2

Power Block OHE Fault Test KHARKOPAR SSP Section UP& DN LINE

KHARKOPAR/SSP
43/12

Test : 1

Date : 16/03/2023

Condition : D/rod at (location 50/28 km) on DN URAN Line Feeding End Of NAVASHEVA
SP BY Closing CB 4865 AT KHARKOPAR SSP

CB Closed:
KHARKOPAR SSP SIDE TIME
CB : 4865 DN URAN 15.32.59

Desired Tripping: KHARKOPAR SSP CB4865 DN URAN REAY OPERATED (DPR Z-1,)

Operation : Following Tripping is observed.

KHARKOPAR SSP NAVASHEVA SSP

CB-4865 CB-4921
DPR Z1, DPR Z1,
FAULT VALUE
R=+0.39 , X=+1.62 R=+0.43 , X=+1.43
I=2.19 KA, V=6.11 KV I=1.09 KA, V=1.23 KV
Dist:-5.66 KM , Dist:-3.53 KM ,
FCT:-70Ms FCT:-71Ms

Remark: Relay action and operation of CB’s are found in order. The relay setting shall be
revised by latched ‘X’ value.
Power Block OHE Fault Test KHARKOPAR SSP Section UP& DN LINE
KHARKOPAR/SSP
43/12

Test : 2

Date : 16/03/2023

Condition : D/rod at (location 50/27 km) on UP URAN Line Feeding End Of NAVASHEVA
SP BY Closing CB 4863 AT KHARKOPAR SSP

CB Closed:
KHARKOPAR SSP SIDE TIME
CB : 4863 UP URAN 15.37.05

Desired Tripping: KHARKOPAR SSP CB4863 UP URAN REAY OPERATED


(DPR Z-1,Z-2)

Operation : Following Tripping is observed.

KHARKOPAR SSP NAVASHEVA SSP

CB-4863 CB-4923
DPR Z1,Z2 DPR Z1,Z2
FAULT VALUE
R=+0.28 , X=+1.61 R=+0.39 , X=+1.39
I=2.21 KA, V=6.06 KV I=1.08 KA, V=1.19 KV
Dist:-5.62 KM , Dist:-3.43 KM ,
FCT:-78Ms FCT:-73Ms

Remark: Relay action and operation of CB’s are found in order. The relay setting shall be
revised by latched ‘X’ value.

You might also like