You are on page 1of 3

Residual Risk

S Risk Rating Action


Hazard Risk Who is at Risk Necessary Control Measures Rating
R By
S L Rating S L Rating

KING ABDUL AZIZ ROAD PROJECT - MAKKAH


Risk Assessment Electric Arc Welding Serial # 14
Electric  Muscle cramp,  Welders,  Welding machine shall be grounded properly.
shock  Cells and tissue  Helpers  No damage cable shall be allowed to use.
damages  Workers  Welding machine shall be shut down during breaks,
associated with pray time and end of the shift.
 Internal organ burns
1.
 Muscle contraction
task 4 4 16  Welding cables shall be secured after completion the
job.
CM/
HSEM
3 1 03
 Cardiac arrest  Outlet fitted with GFCI shall be allowed to use.
 Skin burn  Provide grounding (earth) to welding machine.
 Death or fatal  Use appropriate PPE.
Injuries from  Impact  Welding Crew  Wear Mandatory PPE.
insufficient injuries(falling/flying  Site Workers.  Wear Welding Hood to protect the eyes from infra-red
PPE- objects) visible light and ultra violet radiation.
Personal  Penetration  Wear Aprons and Legging especially approved for
Protective
2. Equipment.
injuries(sharp objects
piercing foot/hand)
4 3 12 welders which will provide effective protection against
heat, flying sparks and falling metals.
CM/
HSEM
2 1 02
 Dehydration  Wear Leather Gloves which will protect your hands
 Skin burns against heat spark, molten metal and radiation.
Gloves should be long enough to protect wrists and
forearm or use leather sleeves.

1
Residual Risk
S Risk Rating Action
Hazard Risk Who is at Risk Necessary Control Measures Rating
R By
S L Rating S L Rating

Fires and  Skin burns  Welding crew  Display Sign board “Danger keep out Hot Work in
explosion  Fractures  Site workers Progress.
 Burn.  Nearby  Display Emergency numbers, Provision if first
contractor facilities and emergency vehicle, on call
 Cataract
employees  Adequate Supervision.
 Ultra violet & radiation  Lawful visitor on  Conduct prestart meeting.
could cause eyes site  Assign trained fire watch with fire extinguisher.
injury.  Assign competent person for welding work.
 Inspect the work area before use and identify any
potential fire risks.
 Remove any flammable / combustible materials,
material which cannot be removed cover with fire
resistant blankets.
 Provide spark arresting screen around the welding
activity and under the welding activity whilst welding
at height to avoid the spark, hot chips, molten
material from flying and falling to avoid burn, injury
and fire hazards.
3 4 4 16  Remove rust inhibitors paints, degreasers or other
coating from metals to be welded to avoid hazardous
CM/
HSEM
4 1 04
fumes and gases.
 Provide welding screen to protect other employees
working in the area.
 Electrode connector insulation shall be free of cracks
or damage and all connections made tight.
 Welding cables should be fitted with proper cable
connections. Do not make temporary or taped joints
on damaged cables (use male female connector.
 Keep welding cables clear of equipment and
materials which could cause damage to them.
 Do not leave the cable coiled on the machine – it will
alter the current flow and disturb the welding process,
cable might also burn.
 Assign fire watch for 30 minutes during break and
end of shift to observe any potential fire hazard.
 Shut down the welding machine during breaks and
end of shift.
Welding  Dizziness  Welders.  Provide adequate ventilation by using exhaust/vent
fumes and  Rapture of stomach  Workers. fans.
gases  Supervisors
wall.
4
 Respiratory problem  Foremen. 4 4
16 CM/
2 2
04
HSEM

PM – Project Manager Risk Matrix Severity


Project: King Abdul Aziz Road Project CM – Construction Manager 1 2 3 4 5
HSEM – HSE Manager 1 1 2 3 4 5
Assessment
Carried out by: Hassan Askari Likelihood of
2
3
2
3
4
6
6
9
8
12
10
15
Harm 4 4 8 12 16 20
Assessment Date: June 20, 2017 5 5
S = Severity
10 15
15 to 25 High
20 25

L = Likelihood 8 to 12 Medium High


Key
Rating = S X L 4 to 6 Medium Low
Approved BY: Diab El Hage 2 to 3
1
Low
Insignificant