COMPANY IDENTIFICATION CODE
Job-Type-N°
REQUEST FOR INSPECTION FORM
Mixed by PDF Mixer - https://pdfmixer.com RFI_01
(RFI)
(The Pro version will not add this text) SHEET DOC.CLASS ISSUE
1/1 00
ITP PHASE REF:
RFI NO.: 001 1.2

DATE: 04TH MAY 2023

PROJECT NAME: BIOFUEL – INDUSTRIAL START-UP AGRI HUB


UNIT : - SYSTEM : -
TO : CPY Project QaQc Coordinator FROM : CTR Construction Manager
SUBSYSTEM : NA AREA : NA
Contractor Client
NA NA
Drawing : Drawing :

REQUEST FOR INSPECTION:


We request your attendance to inspect the following works : TRIAL MIX DESIGN FOR C25/30 CONCRETE
Inspection Time: 15:00 PM Location: GEOLAB , SONGOLO, POINTE NOIR, CONGO

Inspection #: First Second Third Other (Please Specify):___________


Type of Inspection: Visual Testing Joint Inspection Hold Point Witness Point

Purpose of the Inspection: Applicable QCP Tick Applicable QCF More Details
o Equipment
o Survey & Setting out
o Earth Works
o Civil & Concrete Works 30A100DBQB23030 QCF_004, MAR , QCF_017, QCF_018 TRIAL MIX
o Roads & Paving
o Mechanical & Structural
o Piping Works
o Building Works
o Electrical & Instrument Works
o Process Works
Other (Specify): TRIAL MIX FOR CONCRETE FORMULA (25-XC3/XC4-D25-S4-42.5N-SHR & 25-XC4-D25-S23-42.5N)

Particular Details:

ATTACHEMENT: YES NO

ENGINEERS COMMENT: THE WORKS ARE

□ APPROVED AS NOTED

□ APPROVED

□ REJECTED
Notes: Legible Signature requested
NAME DATE SIGNATURE
CONTRACTOR ALEXANDRE ABOU ZEID 4-May-23
RFI_01

COMPANY Mixed by PDF Mixer - https://pdfmixer.com


(The Pro version will not add this text)

This document is Tecnimont’s property, and cannot be used by others for any purpose, without prior written consent

You might also like