You are on page 1of 53

OVERALL QAQC STATUS 9/30/2021

WELDING PROGRESS STATUS OVERALL RT STATUS 9/30/2021 REPAIR R

ACUMMU
LATIVE
INCOMPL WELDING TOTAL JT REMAINI
COMPLETED PROGRES
ETE FRESH RT ACC REJ RESHOT NG RT Total Repair
WELD S
WELD SHOT SHOT
(COM+IN
COM)

2336 2 2338 2330 1997 333 0 6 333

DAILY WELDING PROGRESS 9/30/2021 DAILY RT PROGRESS 9/30/2021


INCOMPLETED
TODAY PREVIOUS
ACCUMULATIVE WELD RT REQUESTED BACK LOG

REPAIR
3 2325 2338 2 FRESH REPAIR R1
R2
FRESH

3 0 0 0
FJC ACTIVITY 9/30/2021
TODAY PREVIOUS
ACCUMULATIVE
REMAINING
20 1717 1737 597

WELD REJECTION REPAIR RATE 9/30/2021


Joint % Length %

14.29 0.23
REPAIR R1 REPAIR R2

BACK LOG BACK LOG ACUMMUL TOTAL


TO TO ATIVE REMAININ
REJ TOTAL ACC REPAIR G TO
ACC (SHOT) REPAIR REJ (SHOT) REPAIR
(SHOT) (CONSTR REPAIR (SHOT)
(CONSTR R1+R2 REPAIR
UCTION) UCTION

320 0 3 21 21 0 0 354 3

REPAIR
REPAIR R1
R2
0 0
OVERALL QAQC STATUS 10/1/2021

WELDING PROGRESS STATUS OVERALL RT STATUS 10/1/2021 REPAIR R

ACUMMU
LATIVE
INCOMPL WELDING TOTAL JT REMAINI
COMPLETED PROGRES
ETE FRESH RT ACC REJ RESHOT NG RT Total Repair
WELD S
WELD SHOT SHOT
(COM+IN
COM)

2336 2 2338 2330 1997 333 0 6 333

DAILY WELDING PROGRESS 10/1/2021 DAILY RT PROGRESS 10/1/2021


INCOMPLETED
TODAY PREVIOUS
ACCUMULATIVE WELD RT REQUESTED BACK LOG

REPAIR
3 2325 2338 2 FRESH REPAIR R1
R2
FRESH

3 0 0 0
FJC ACTIVITY 10/1/2021
TODAY PREVIOUS
ACCUMULATIVE
REMAINING
20 1717 1737 597

WELD REJECTION REPAIR RATE 10/1/2021


Joint % Length %

14.29 0.23
REPAIR R1 REPAIR R2

BACK LOG BACK LOG ACUMMUL TOTAL


TO TO ATIVE REMAININ
REJ TOTAL ACC REPAIR G TO
ACC (SHOT) REPAIR REJ (SHOT) REPAIR
(SHOT) (CONSTR REPAIR (SHOT)
(CONSTR R1+R2 REPAIR
UCTION) UCTION

320 0 3 21 21 0 0 354 3

REPAIR
REPAIR R1
R2
0 0
OVERALL QAQC STATUS 10/2/2021

WELDING PROGRESS STATUS OVERALL RT STATUS 10/2/2021 REPAIR R

ACUMMU
LATIVE
INCOMPL WELDING TOTAL JT REMAINI
COMPLETED PROGRES
ETE FRESH RT ACC REJ RESHOT NG RT Total Repair
WELD S
WELD SHOT SHOT
(COM+IN
COM)

2342 0 2342 2334 2001 333 0 8 333

DAILY WELDING PROGRESS 10/2/2021 DAILY RT PROGRESS 10/2/2021


INCOMPLETED
TODAY PREVIOUS
ACCUMULATIVE WELD RT REQUESTED BACK LOG

REPAIR
4 2338 2342 0 FRESH REPAIR R1
R2
FRESH

3 0 0 0
FJC ACTIVITY 10/2/2021
TODAY PREVIOUS
ACCUMULATIVE
REMAINING
20 1717 1737 603

WELD REJECTION REPAIR RATE 10/2/2021


Joint % Length %

14.27 0.23
REPAIR R1 REPAIR R2

BACK LOG BACK LOG ACUMMUL TOTAL


TO TO ATIVE REMAININ
REJ TOTAL ACC REPAIR G TO
ACC (SHOT) REPAIR REJ (SHOT) REPAIR
(SHOT) (CONSTR REPAIR (SHOT)
(CONSTR R1+R2 REPAIR
UCTION) UCTION

320 0 3 21 21 0 0 354 3

REPAIR
REPAIR R1
R2
0 0
OVERALL QAQC STATUS 10/3/2021

WELDING PROGRESS STATUS OVERALL RT STATUS 10/3/2021

ACUMMU
LATIVE
INCOMPL WELDING TOTAL JT
COMPLETED PROGRES REMAINING
ETE FRESH RT ACC REJ RESHOT
WELD S RT SHOT
WELD SHOT
(COM+IN
COM)

2344 0 2344 2338 2004 334 0 6

DAILY WELDING PROGRESS 10/3/2021 DAILY RT PROGRESS 10/3/2021


INCOMPLETED
TODAY PREVIOUS
ACCUMULATIVE WELD RT REQUESTED

2 2342 2344 0 FRESH REPAIR R1 REPAIR R2


2 0 0
FJC ACTIVITY 10/3/2021
PREVIOUS
ACCUMULATIVE
REMAINING KP11H3
TODAY
7A
KP11H3
13 1737 1750 592 7B

WELD REJECTION REPAIR RATE 10/3/2021


Joint % Length %

14.29 0.22
REPAIR R1 REPAIR R2

BACK LOG BACK LOG ACUMMUL TOTAL


TO TO ATIVE REMAININ
REJ TOTAL ACC REPAIR G TO
Total Repair ACC (SHOT) REPAIR REJ (SHOT) REPAIR
(SHOT) (CONSTR REPAIR (SHOT)
(CONSTR R1+R2 REPAIR
UCTION) UCTION

334 320 0 3 21 21 0 0 355 3

KP00H76
KP02H02

KP0H59
OVERALL QAQC STATUS 10/4/2021

WELDING PROGRESS STATUS OVERALL RT STATUS 10/4/2021

ACUMMU
LATIVE
INCOMPL WELDING TOTAL JT
COMPLETED PROGRES REMAINING
ETE FRESH RT ACC REJ RESHOT
WELD S RT SHOT
WELD SHOT
(COM+IN
COM)

2347 1 2348 2346 2012 334 0 1

DAILY WELDING PROGRESS 10/4/2021 DAILY RT PROGRESS 10/4/2021


INCOMPLETED
TODAY PREVIOUS
ACCUMULATIVE WELD RT REQUESTED

3 2342 2348 1 FRESH REPAIR R1 REPAIR R2


3 0 0
FJC ACTIVITY 10/4/2021
PREVIOUS
ACCUMULATIVE
REMAINING KP11H5
TODAY
3
KP18H3
17 1750 1767 578 4
KP18H3
5
WELD REJECTION REPAIR RATE 10/4/2021
Joint % Length %

14.24 0.22
REPAIR R1 REPAIR R2

BACK LOG BACK LOG ACUMMUL TOTAL


TO TO ATIVE REMAININ
REJ TOTAL ACC REPAIR G TO
Total Repair ACC (SHOT) REPAIR REJ (SHOT) REPAIR
(SHOT) (CONSTR REPAIR (SHOT)
(CONSTR R1+R2 REPAIR
UCTION) UCTION

334 320 0 3 21 21 0 0 355 3

KP00H76
KP02H02

KP0H59
OVERALL QAQC STATUS 10/5/2021

WELDING PROGRESS STATUS OVERALL RT STATUS 10/5/2021

ACUMMU
LATIVE
INCOMPL WELDING TOTAL JT
COMPLETED PROGRES REMAINING
ETE FRESH RT ACC REJ RESHOT
WELD S RT SHOT
WELD SHOT
(COM+IN
COM)

2352 2 2354 2349 2015 334 0 3

DAILY WELDING PROGRESS 10/5/2021 DAILY RT PROGRESS 10/5/2021


INCOMPLETED
TODAY PREVIOUS
ACCUMULATIVE WELD RT REQUESTED

6 2342 2354 2 FRESH REPAIR R1 REPAIR R2


5 0 0
FJC ACTIVITY 10/5/2021
PREVIOUS
ACCUMULATIVE
REMAINING KP11H4
TODAY
5
KP11H4
22 1767 1789 561 9
KP18H3
6
WELD REJECTION REPAIR RATE KP18H3
10/5/2021 7
KP18H3
Joint % Length %
8
14.22 0.22
REPAIR R1 REPAIR R2

BACK LOG BACK LOG ACUMMUL TOTAL


TO TO ATIVE REMAININ
REJ TOTAL ACC REPAIR G TO
Total Repair ACC (SHOT) REPAIR REJ (SHOT) REPAIR
(SHOT) (CONSTR REPAIR (SHOT)
(CONSTR R1+R2 REPAIR
UCTION) UCTION

334 320 0 3 21 21 0 0 355 3

KP00H76
KP02H02

KP0H59
OVERALL QAQC STATUS 10/6/2021

WELDING PROGRESS STATUS OVERALL RT STATUS 10/6/2021

ACUMMU
LATIVE
INCOMPL WELDING TOTAL JT
COMPLETED PROGRES REMAINING
ETE FRESH RT ACC REJ RESHOT
WELD S RT SHOT
WELD SHOT
(COM+IN
COM)

2357 2 2359 2352 2018 334 0 5

DAILY WELDING PROGRESS 10/6/2021 DAILY RT PROGRESS 10/6/2021


INCOMPLETED
TODAY PREVIOUS
ACCUMULATIVE WELD RT REQUESTED

5 2354 2359 2 FRESH REPAIR R1 REPAIR R2


5 0 0
FJC ACTIVITY 10/6/2021
PREVIOUS
ACCUMULATIVE
REMAINING KP18H3
TODAY
9
KP18H4
28 1817 1845 510 0
KP18H4
1
WELD REJECTION REPAIR RATE KP18H4
10/6/2021 2
KP12H4
Joint % Length %
3
14.20 0.22
REPAIR R1 REPAIR R2

BACK LOG BACK LOG ACUMMUL TOTAL


TO TO ATIVE REMAININ
REJ TOTAL ACC REPAIR G TO
Total Repair ACC (SHOT) REPAIR REJ (SHOT) REPAIR
(SHOT) (CONSTR REPAIR (SHOT)
(CONSTR R1+R2 REPAIR
UCTION) UCTION

334 320 0 3 21 21 0 0 355 3

KP00H76
KP02H02

KP0H59
OVERALL QAQC STATUS 10/7/2021

WELDING PROGRESS STATUS OVERALL RT STATUS 10/7/2021

ACUMMU
LATIVE
INCOMPL WELDING TOTAL JT
COMPLETED PROGRES REMAINING
ETE FRESH RT ACC REJ RESHOT
WELD S RT SHOT
WELD SHOT
(COM+IN
COM)

2362 1 2363 2357 2023 334 0 5

DAILY WELDING PROGRESS 10/7/2021 DAILY RT PROGRESS 10/7/2021


INCOMPLETED
TODAY PREVIOUS
ACCUMULATIVE WELD RT REQUESTED

5 2354 2363 2 FRESH REPAIR R1 REPAIR R2


5 0 0
FJC ACTIVITY 10/7/2021
PREVIOUS
ACCUMULATIVE
REMAINING KP12H4
TODAY
1
KP12H4
28 1817 1845 515 7
KP12H4
9
WELD REJECTION REPAIR RATE KP18H2
10/7/2021 3
KP18H2
Joint % Length %
4
14.17 0.22
REPAIR R1 REPAIR R2

BACK LOG BACK LOG ACUMMUL TOTAL


TO TO ATIVE REMAININ
REJ TOTAL ACC REPAIR G TO
Total Repair ACC (SHOT) REPAIR REJ (SHOT) REPAIR
(SHOT) (CONSTR REPAIR (SHOT)
(CONSTR R1+R2 REPAIR
UCTION) UCTION

334 320 0 3 21 21 0 0 355 3

KP00H76
KP02H02

KP0H59
OVERALL QAQC STATUS 10/9/2021

WELDING PROGRESS STATUS OVERALL RT STATUS 10/9/2021

ACUMMU
LATIVE
INCOMPL WELDING TOTAL JT
COMPLETED PROGRES REMAINING
ETE FRESH RT ACC REJ RESHOT
WELD S RT SHOT
WELD SHOT
(COM+IN
COM)

2366 0 2366 2365 2031 334 0 1

DAILY WELDING PROGRESS 10/9/2021 DAILY RT PROGRESS 10/9/2021


INCOMPLETED
TODAY PREVIOUS
ACCUMULATIVE WELD RT REQUESTED

5 2354 2366 2 FRESH REPAIR R1 REPAIR R2


4 0 0
FJC ACTIVITY 10/9/2021
PREVIOUS
ACCUMULATIVE
REMAINING KP18H2
TODAY
5
KP18H2
28 1817 1845 519 6
KP18H2
7
WELD REJECTION REPAIR RATE KP18H2
10/9/2021 8
Joint % Length %

14.12 0.22
REPAIR R1 REPAIR R2

BACK LOG BACK LOG ACUMMUL TOTAL


TO TO ATIVE REMAININ
REJ TOTAL ACC REPAIR G TO
Total Repair ACC (SHOT) REPAIR REJ (SHOT) REPAIR
(SHOT) (CONSTR REPAIR (SHOT)
(CONSTR R1+R2 REPAIR
UCTION) UCTION

334 320 0 3 21 21 0 0 355 3

KP00H76
KP02H02

KP0H59
OVERALL QAQC STATUS 10/10/2021

WELDING PROGRESS STATUS OVERALL RT STATUS 10/10/2021

ACUMMU
LATIVE
INCOMPL WELDING TOTAL JT
COMPLETED PROGRES REMAINING
ETE FRESH RT ACC REJ RESHOT
WELD S RT SHOT
WELD SHOT
(COM+IN
COM)

2369 1 2370 2369 2035 334 0 0

DAILY WELDING PROGRESS 10/10/2021 DAILY RT PROGRESS 10/10/2021


TODAY ACCUMULATIVEINCOMPLETED
PREVIOUS WELD RT REQUESTED

5 2354 2370 2 FRESH REPAIR R1 REPAIR R2


3 0 0
FJC ACTIVITY 10/10/2021
PREVIOUS
ACCUMULATIVEREMAINING KP18H2
TODAY
9
KP18H3
28 1817 1845 522 0
KP13H8
2A
WELD REJECTION REPAIR RATE 10/10/2021
Joint % Length %

14.10 0.22
REPAIR R1 REPAIR R2

BACK LOG BACK LOG ACUMMUL TOTAL


TO TO ATIVE REMAININ
REJ TOTAL ACC REPAIR G TO
Total Repair ACC (SHOT) REPAIR REJ (SHOT) REPAIR
(SHOT) (CONSTR REPAIR (SHOT)
(CONSTR R1+R2 REPAIR
UCTION) UCTION

334 320 0 3 21 21 0 0 355 3

KP00H76
KP02H02

KP0H59
OVERALL QAQC STATUS 10/11/2021

WELDING PROGRESS STATUS OVERALL RT STATUS 10/11/2021

ACUMMULATIVE
TOTAL JT
COMPLETED INCOMPLETE WELDING REMAINING
PROGRESS FRESH RT ACC REJ
WELD WELD RT SHOT
SHOT
(COM+INCOM)

2373 1 2374 2371 2037 334 2

DAILY WELDING PROGRESS 10/11/2021


INCOMPLETED
TODAY PREVIOUS ACCUMULATIVE WELD
4 2370 2374 1

FJC ACTIVITY 10/11/2021

TODAY PREVIOUS ACCUMULATIVE REMAINING

8 1819 1827 544

WELD REJECTION REPAIR RATE 10/11/2021


Joint % Length %
14.09 0.22

WELD COMPLETED 86.04 %


FJC 66.24 %
TRENCHING 31.70 %
LOWER IN 30.99 %
BACKFILLING 26.42 %

TRENCHING
TODAY PREVIOUS ACCUMULATIVE REMAINING
379.76 10330 22260

LOWER IN
TODAY PREVIOUS ACCUMULATIVE REMAINING
384.26 10100 22490

TODAY PREVIOUS ACCUMULATIVE REMAINING


87.6 8610 23980
1. TRENCHING : 10.33km(379.76)/32.59km
2. LOWERING IN : 10.10km(384.26m)/32.59km
3. BACKFILLING : 8.61km(87.6m)/32.59km
TOTAL PIPELINE LENGTH (m) 32590
TOTAL WELD 2758
REPAIR R1 REPAIR R2

BACK LOG ACUMMUL TOTAL


TO ATIVE
TOTAL ACC REPAIR REMAINING TO
Total Repair ACC (SHOT) REPAIR REPAIR
REPAIR (SHOT) R1+R2
(CONSTR
UCTION)

334 320 3 21 21 355 3

KP00H76 DAILY RT PROGRESS 10/11/2021


KP02H02 RT REQUESTED
REPAIR
KP01H59 FRESH REPAIR R2
R1
4 0 0

KP18H1
4
KP18H1
5
KP18H1
6
KP13H8
2
OVERALL QAQC STATUS 10/12/2021

WELDING PROGRESS STATUS OVERALL RT STATUS 10/12/2021

ACUMMULATIVE
TOTAL JT
COMPLETED INCOMPLETE WELDING REMAINING
PROGRESS FRESH RT ACC REJ
WELD WELD RT SHOT
SHOT
(COM+INCOM)

2377 0 2377 2376 2042 334 1

DAILY WELDING PROGRESS 10/12/2021


INCOMPLETED
TODAY PREVIOUS ACCUMULATIVE WELD
4 2370 2377 1

FJC ACTIVITY 10/12/2021

TODAY PREVIOUS ACCUMULATIVE REMAINING

18 1827 1845 530

WELD REJECTION REPAIR RATE 10/12/2021


Joint % Length %
14.06 0.22

WELD COMPLETED 86.19 %


FJC 66.90 %
TRENCHING 32.19 %
LOWER IN 31.33 %
BACKFILLING 26.79 %

TRENCHING
TODAY PREVIOUS ACCUMULATIVE REMAINING
153.79 10330 10490 22100

LOWER IN
TODAY PREVIOUS ACCUMULATIVE REMAINING
114.79 10100 10210 22380

TODAY PREVIOUS ACCUMULATIVE REMAINING


119.5 8610 8730 23860
TOTAL PIPELINE LENGTH (m) 32590
TOTAL WELD 2758
REPAIR R1 REPAIR R2

BACK LOG ACUMMUL TOTAL


TO ATIVE
TOTAL ACC REPAIR REMAINING TO
Total Repair ACC (SHOT) REPAIR REPAIR
REPAIR (SHOT) R1+R2
(CONSTR
UCTION)

334 320 3 21 21 355 3

KP00H76 DAILY RT PROGRESS 10/12/2021


KP02H02 RT REQUESTED
REPAIR
KP01H59 FRESH REPAIR R2
R1
4 0 0

KP18H1
4
KP18H1
5
KP18H1
6
KP13H8
2
OVERALL QAQC STATUS 10/13/2021

WELDING PROGRESS STATUS OVERALL RT STATUS 10/13/2021

ACUMMULATIVE
TOTAL JT
COMPLETED INCOMPLETE WELDING REMAINING
PROGRESS FRESH RT ACC REJ
WELD WELD RT SHOT
SHOT
(COM+INCOM)

2380 0 2380 2379 2045 334 1

DAILY WELDING PROGRESS 10/13/2021


INCOMPLETED
TODAY PREVIOUS ACCUMULATIVE WELD
3 2377 2380 1

FJC ACTIVITY 10/13/2021


TODAY PREVIOUS ACCUMULATIVE REMAINING
26 1845 1871 507

WELD REJECTION REPAIR RATE 10/13/2021


Joint % Length %
14.04 0.22

WELD COMPLETED 86.29 %


FJC 67.84 %
TRENCHING 33.05 %
LOWER IN 32.31 %
BACKFILLING 27.37 %

TRENCHING
TODAY PREVIOUS ACCUMULATIVE REMAINING
278.26 10490 10770 21820

LOWER IN
TODAY PREVIOUS ACCUMULATIVE REMAINING
323.3 10210 10530 22060

TODAY PREVIOUS ACCUMULATIVE REMAINING


192.95 8730 8920 23670
TOTAL PIPELINE LENGTH (m) 32590
TOTAL WELD 2758
REPAIR R1 REPAIR R2

BACK LOG ACUMMUL TOTAL


TO ATIVE
TOTAL REPAIR REMAINING TO
Total Repair ACC (SHOT) REPAIR ACC (SHOT) REPAIR
REPAIR R1+R2
(CONSTR
UCTION)

334 320 3 21 21 355 3

KP00H76 DAILY RT PROGRESS 10/13/2021


KP02H02 RT REQUESTED
REPAIR
KP01H59 FRESH REPAIR R2
R1
3 0 0

KP14H20A
KP14H23RW
KP30H53
OVERALL QAQC STATUS 10/14/2021

WELDING PROGRESS STATUS OVERALL RT STATUS 10/14/2021

ACUMMULATIVE
TOTAL JT
COMPLETED INCOMPLETE WELDING REMAINING
PROGRESS FRESH RT ACC REJ
WELD WELD RT SHOT
SHOT
(COM+INCOM)

2385 0 2385 2382 2048 334 3

DAILY WELDING PROGRESS 10/14/2021


INCOMPLETED
TODAY PREVIOUS ACCUMULATIVE WELD
5 2380 2385 0

FJC ACTIVITY 10/14/2021


TODAY PREVIOUS ACCUMULATIVE REMAINING
15 1871 1886 497

WELD REJECTION REPAIR RATE 10/14/2021


Joint % Length %
14.02 0.22

WELD COMPLETED 86.48 %


FJC 68.38 %
TRENCHING 33.11 %
LOWER IN 32.40 %
BACKFILLING 28.51 %

TRENCHING
TODAY PREVIOUS ACCUMULATIVE REMAINING
20 10770 10790 21800

LOWER IN
TODAY PREVIOUS ACCUMULATIVE REMAINING
30 10530 10560 22030

TODAY PREVIOUS ACCUMULATIVE REMAINING


372.4 8920 9290 23300
TOTAL PIPELINE LENGTH (m) 32590
TOTAL WELD 2758
REPAIR R1 REPAIR R2

BACK LOG ACUMMUL TOTAL


TO ATIVE
TOTAL REPAIR REMAINING TO
Total Repair ACC (SHOT) REPAIR ACC (SHOT) REPAIR
REPAIR R1+R2
(CONSTR
UCTION)

334 320 3 21 21 355 3

KP00H76 DAILY RT PROGRESS 10/14/2021


KP02H02 RT REQUESTED
REPAIR
KP01H59 FRESH REPAIR R2
R1
5 0 0

KP30H53A
KP30H53B
KP14H21
KP14H37
KP06H09
OVERALL QAQC STATUS 10/16/2021

WELDING PROGRESS STATUS OVERALL RT STATUS 10/16/2021

ACUMMULATIVE
TOTAL JT
COMPLETED INCOMPLETE WELDING REMAINING
PROGRESS FRESH RT ACC REJ
WELD WELD RT SHOT
SHOT
(COM+INCOM)

2386 2 2388 2386 2052 334 0

DAILY WELDING PROGRESS 10/16/2021


INCOMPLETED
TODAY PREVIOUS ACCUMULATIVE WELD
3 2385 2388 2

FJC ACTIVITY 10/16/2021


TODAY PREVIOUS ACCUMULATIVE REMAINING
1 1886 1887 497

WELD REJECTION REPAIR RATE 10/16/2021


Joint % Length %
14.00 0.22

WELD COMPLETED 86.51 %


FJC 68.42 %
TRENCHING 33.57 %
LOWER IN 32.40 %
BACKFILLING 28.51 %

TRENCHING
TODAY PREVIOUS ACCUMULATIVE REMAINING
154.66 10790 10940 21650

LOWER IN
TODAY PREVIOUS ACCUMULATIVE REMAINING
0 10560 10560 22030

TODAY PREVIOUS ACCUMULATIVE REMAINING


0 9290 9290 23300
TOTAL PIPELINE LENGTH (m) 32590
TOTAL WELD 2758
REPAIR R1 REPAIR R2

BACK LOG ACUMMUL TOTAL


TO ATIVE
TOTAL REPAIR REMAINING TO
Total Repair ACC (SHOT) REPAIR ACC (SHOT) REPAIR
REPAIR R1+R2
(CONSTR
UCTION)

334 320 3 21 21 355 3

KP00H76 DAILY RT PROGRESS 10/16/2021


KP02H02 RT REQUESTED
REPAIR
KP01H59 FRESH REPAIR R2
R1
1 0 0

KP30H51
OVERALL QAQC STATUS 10/17/2021

WELDING PROGRESS STATUS OVERALL RT STATUS 10/17/2021

ACUMMULATIVE
TOTAL JT
COMPLETED INCOMPLETE WELDING REMAINING
PROGRESS FRESH RT ACC REJ
WELD WELD RT SHOT
SHOT
(COM+INCOM)

2392 0 2392 2387 2053 334 5

DAILY WELDING PROGRESS 10/17/2021


INCOMPLETED
TODAY PREVIOUS ACCUMULATIVE WELD
4 2385 2392 0

FJC ACTIVITY 10/17/2021


TODAY PREVIOUS ACCUMULATIVE REMAINING
10 1887 1897 493

WELD REJECTION REPAIR RATE 10/17/2021


Joint % Length %
13.99 0.22

WELD COMPLETED 86.73 %


FJC 68.78 %
TRENCHING 34.31 %
LOWER IN 32.40 %
BACKFILLING 28.51 %

TRENCHING
TODAY PREVIOUS ACCUMULATIVE REMAINING
391.95 10940 11180 21410

LOWER IN
TODAY PREVIOUS ACCUMULATIVE REMAINING
0 10560 10560 22030

TODAY PREVIOUS ACCUMULATIVE REMAINING


0 9290 9290 23300
TOTAL PIPELINE LENGTH (m) 32590
TOTAL WELD 2758
REPAIR R1 REPAIR R2

BACK LOG ACUMMUL TOTAL


TO ATIVE
TOTAL REPAIR REMAINING TO
Total Repair ACC (SHOT) REPAIR ACC (SHOT) REPAIR
REPAIR R1+R2
(CONSTR
UCTION)

334 320 3 21 21 355 3

KP00H76 DAILY RT PROGRESS 10/17/2021


KP02H02 RT REQUESTED
REPAIR
KP01H59 FRESH REPAIR R2
R1
1 0 0

KP30H51
OVERALL QAQC STATUS 10/18/2021

WELDING PROGRESS STATUS OVERALL RT STATUS 10/18/2021

ACUMMULATIVE
TOTAL JT
COMPLETED INCOMPLETE WELDING REMAINING
PROGRESS FRESH RT ACC REJ
WELD WELD RT SHOT
SHOT
(COM+INCOM)

2392 0 2392 2392 2058 334 0

DAILY WELDING PROGRESS 10/18/2021


INCOMPLETED
TODAY PREVIOUS ACCUMULATIVE WELD
4 2385 2392 0

FJC ACTIVITY 10/18/2021


TODAY PREVIOUS ACCUMULATIVE REMAINING
10 1887 1897 493

WELD REJECTION REPAIR RATE 10/18/2021


Joint % Length %
13.96 0.22

WELD COMPLETED 86.73 %


FJC 68.78 %
TRENCHING 34.61 %
LOWER IN 33.91 %
BACKFILLING 29.09 %

TRENCHING
TODAY PREVIOUS ACCUMULATIVE REMAINING
95.43 11180 11280 21310

LOWER IN
TODAY PREVIOUS ACCUMULATIVE REMAINING
487.38 10560 11050 21540

TODAY PREVIOUS ACCUMULATIVE REMAINING


190.5 9290 9480 23110
TOTAL PIPELINE LENGTH (m) 32590
TOTAL WELD 2758
REPAIR R1 REPAIR R2

BACK LOG ACUMMUL TOTAL


TO ATIVE
TOTAL REPAIR REMAINING TO
Total Repair ACC (SHOT) REPAIR ACC (SHOT) REPAIR
REPAIR R1+R2
(CONSTR
UCTION)

334 320 3 21 21 355 3

KP00H76 DAILY RT PROGRESS 10/18/2021


KP02H02 RT REQUESTED
REPAIR
KP01H59 FRESH REPAIR R2
R1
3 0 0

KP10H54
KP23H85T
KP30H71B
OVERALL QAQC STATUS 10/20/2021

WELDING PROGRESS STATUS OVERALL RT STATUS 10/20/2021

ACUMMULATIVE
TOTAL JT
COMPLETED INCOMPLETE WELDING REMAINING
PROGRESS FRESH RT ACC REJ
WELD WELD RT SHOT
SHOT
(COM+INCOM)

2398 2 2400 2396 2062 334 2

DAILY WELDING PROGRESS 10/20/2021


INCOMPLETED
TODAY PREVIOUS ACCUMULATIVE WELD
4 2392 2400 0

FJC ACTIVITY 10/20/2021


TODAY PREVIOUS ACCUMULATIVE REMAINING
12 1897 1909 487

WELD REJECTION REPAIR RATE 10/20/2021


Joint % Length %
13.94 0.22

WELD COMPLETED 86.95 %


FJC 69.22 %
TRENCHING 34.95 %
LOWER IN 34.24 %
BACKFILLING 29.43 %

TRENCHING
TODAY PREVIOUS ACCUMULATIVE REMAINING
106.91 11280 11390 21200

LOWER IN
TODAY PREVIOUS ACCUMULATIVE REMAINING
106.91 11050 11160 21430

TODAY PREVIOUS ACCUMULATIVE REMAINING


106.91 9480 9590 23000
TOTAL PIPELINE LENGTH (m) 32590
TOTAL WELD 2758
REPAIR R1 REPAIR R2

BACK LOG ACUMMUL TOTAL


TO ATIVE
TOTAL REPAIR REMAINING TO
Total Repair ACC (SHOT) REPAIR ACC (SHOT) REPAIR
REPAIR R1+R2
(CONSTR
UCTION)

334 320 3 21 21 355 3

KP00H76 DAILY RT PROGRESS 10/20/2021


KP02H02 RT REQUESTED
REPAIR
KP01H59 FRESH REPAIR R2
R1
3 0 0

KP24H02T
KP30H71
KP30H70
OVERALL QAQC STATUS 10/23/2021

WELDING PROGRESS STATUS OVERALL RT STATUS 10/23/2021

ACUMMULATIVE
TOTAL JT
COMPLETED INCOMPLETE WELDING REMAINING
PROGRESS FRESH RT ACC REJ
WELD WELD RT SHOT
SHOT
(COM+INCOM)

2408 0 2408 2406 2072 334 2

DAILY WELDING PROGRESS 10/23/2021


INCOMPLETED
TODAY PREVIOUS ACCUMULATIVE WELD
4 2392 2408 0

FJC ACTIVITY 10/23/2021


TODAY PREVIOUS ACCUMULATIVE REMAINING
12 1897 1909 497

WELD REJECTION REPAIR RATE 10/23/2021


Joint % Length %
13.88 0.22

WELD COMPLETED 87.31 %


FJC 69.22 %
TRENCHING 34.95 %
LOWER IN 34.24 %
BACKFILLING 29.43 %

TRENCHING
TODAY PREVIOUS ACCUMULATIVE REMAINING
106.91 11280 11390 21200

LOWER IN
TODAY PREVIOUS ACCUMULATIVE REMAINING
106.91 11050 11160 21430

TODAY PREVIOUS ACCUMULATIVE REMAINING


106.91 9480 9590 23000
TOTAL PIPELINE LENGTH (m) 32590
TOTAL WELD 2758
REPAIR R1 REPAIR R2

BACK LOG ACUMMUL TOTAL


TO ATIVE
TOTAL REPAIR REMAINING TO
Total Repair ACC (SHOT) REPAIR ACC (SHOT) REPAIR
REPAIR R1+R2
(CONSTR
UCTION)

334 320 3 21 21 355 3

KP00H76 DAILY RT PROGRESS 10/23/2021


KP02H02 RT REQUESTED
REPAIR
KP01H59 FRESH REPAIR R2
R1
5 0 0

KP10H59
KP20H76
KP23H81T
KP30H73
KP30H74
OVERALL QAQC STATUS 10/24/2021

WELDING PROGRESS STATUS OVERALL RT STATUS 10/24/2021

ACUMMULATIVE
TOTAL JT
COMPLETED INCOMPLETE WELDING REMAINING
PROGRESS FRESH RT ACC REJ
WELD WELD RT SHOT
SHOT
(COM+INCOM)

2410 0 2410 2409 2075 334 1

DAILY WELDING PROGRESS 10/24/2021


INCOMPLETED
TODAY PREVIOUS ACCUMULATIVE WELD
4 2392 2410 0

FJC ACTIVITY 10/24/2021


TODAY PREVIOUS ACCUMULATIVE REMAINING
24 1954 1978 430

WELD REJECTION REPAIR RATE 10/24/2021


Joint % Length %
13.86 0.22

WELD COMPLETED 87.38 %


FJC 71.72 %
TRENCHING 36.45 %
LOWER IN 35.78 %
BACKFILLING 31.27 %

TRENCHING
TODAY PREVIOUS ACCUMULATIVE REMAINING
133.83 11390 11880 20710

LOWER IN
TODAY PREVIOUS ACCUMULATIVE REMAINING
3560.79 11160 11660 20930

TODAY PREVIOUS ACCUMULATIVE REMAINING


216.4 9590 10190 22400
TOTAL PIPELINE LENGTH (m) 32590
TOTAL WELD 2758
REPAIR R1 REPAIR R2

BACK LOG ACUMMUL TOTAL


TO ATIVE
TOTAL REPAIR REMAINING TO
Total Repair ACC (SHOT) REPAIR ACC (SHOT) REPAIR
REPAIR R1+R2
(CONSTR
UCTION)

334 320 3 21 21 355 3

KP00H76 DAILY RT PROGRESS 10/24/2021


KP02H02 RT REQUESTED
REPAIR
KP01H59 FRESH REPAIR R2
R1
2 0 0

KP10H61
KP30H76
OVERALL QAQC STATUS 10/25/2021

WELDING PROGRESS STATUS OVERALL RT STATUS 10/25/2021

ACUMMULATIVE
TOTAL JT
COMPLETED INCOMPLETE WELDING REMAINING
PROGRESS FRESH RT ACC REJ
WELD WELD RT SHOT
SHOT
(COM+INCOM)

2414 3 2417 2412 2078 334 2

DAILY WELDING PROGRESS 10/25/2021


INCOMPLETED
TODAY PREVIOUS ACCUMULATIVE WELD
2 2392 2417 0

FJC ACTIVITY 10/25/2021


TODAY PREVIOUS ACCUMULATIVE REMAINING
15 1978 1993 419

WELD REJECTION REPAIR RATE 10/25/2021


Joint % Length %
13.85 0.22

WELD COMPLETED 87.53 %


FJC 72.26 %
TRENCHING 37.07 %
LOWER IN 36.27 %
BACKFILLING 31.33 %

TRENCHING
TODAY PREVIOUS ACCUMULATIVE REMAINING
199.89 11880 12080 20510

LOWER IN
TODAY PREVIOUS ACCUMULATIVE REMAINING
155 11660 11820 20770

TODAY PREVIOUS ACCUMULATIVE REMAINING


23.25 10190 10210 22380
TOTAL PIPELINE LENGTH (m) 32590
TOTAL WELD 2758
REPAIR R1 REPAIR R2

BACK LOG ACUMMUL TOTAL


TO ATIVE
TOTAL REPAIR REMAINING TO
Total Repair ACC (SHOT) REPAIR ACC (SHOT) REPAIR
REPAIR R1+R2
(CONSTR
UCTION)

334 320 3 21 21 355 3

KP00H76 DAILY RT PROGRESS 10/25/2021


KP02H02 RT REQUESTED
REPAIR
KP01H59 FRESH REPAIR R2
R1
4 0 0

KP31H48
KP31H51
KP31H52
KP23H78T
OVERALL QAQC STATUS 10/26/2021

WELDING PROGRESS STATUS OVERALL RT STATUS 10/26/2021

ACUMMULATIVE
TOTAL JT
COMPLETED INCOMPLETE WELDING REMAINING
PROGRESS FRESH RT ACC REJ
WELD WELD RT SHOT
SHOT
(COM+INCOM)

2419 0 2419 2416 2082 334 3

DAILY WELDING PROGRESS 10/26/2021


INCOMPLETED
TODAY PREVIOUS ACCUMULATIVE WELD
6 2392 2419 3

FJC ACTIVITY 10/26/2021


TODAY PREVIOUS ACCUMULATIVE REMAINING
2 1993 1995 422

WELD REJECTION REPAIR RATE 10/26/2021


Joint % Length %
13.82 0.22

WELD COMPLETED 87.71 %


FJC 72.34 %
TRENCHING 37.99 %
LOWER IN 36.91 %
BACKFILLING 31.33 %

TRENCHING
TODAY PREVIOUS ACCUMULATIVE REMAINING
300 12080 12380 20210

LOWER IN
TODAY PREVIOUS ACCUMULATIVE REMAINING
214.14 11820 12030 20560

TODAY PREVIOUS ACCUMULATIVE REMAINING


0 10210 10210 22380
TOTAL PIPELINE LENGTH (m) 32590
TOTAL WELD 2758
REPAIR R1 REPAIR R2

BACK LOG ACUMMUL TOTAL


TO ATIVE
TOTAL REPAIR REMAINING TO
Total Repair ACC (SHOT) REPAIR ACC (SHOT) REPAIR
REPAIR R1+R2
(CONSTR
UCTION)

334 320 3 21 21 355 3

KP00H76 DAILY RT PROGRESS 10/26/2021


KP02H02 RT REQUESTED
REPAIR
KP01H59 FRESH REPAIR R2
R1
5 0 0

KP21H36
KP31H49
KP31H53
KP10H46
KP10H50
OVERALL QAQC STATUS 10/27/2021

WELDING PROGRESS STATUS OVERALL RT STATUS 10/27/2021

ACUMMULATIVE
TOTAL JT
COMPLETED INCOMPLETE WELDING REMAINING
PROGRESS FRESH RT ACC REJ
WELD WELD RT SHOT
SHOT
(COM+INCOM)

2424 1 2425 2419 2085 334 5

DAILY WELDING PROGRESS 10/27/2021


INCOMPLETED
TODAY PREVIOUS ACCUMULATIVE WELD
6 2392 2425 1

FJC ACTIVITY 10/27/2021


TODAY PREVIOUS ACCUMULATIVE REMAINING
3 1995 1998 424

WELD REJECTION REPAIR RATE 10/27/2021


Joint % Length %
13.81 0.22

WELD COMPLETED 87.89 %


FJC 72.44 %
TRENCHING 38.26 %
LOWER IN 37.62 %
BACKFILLING 32.68 %

TRENCHING
TODAY PREVIOUS ACCUMULATIVE REMAINING
94.8 12380 12470 20120

LOWER IN
TODAY PREVIOUS ACCUMULATIVE REMAINING
225.56 12030 12260 20330

TODAY PREVIOUS ACCUMULATIVE REMAINING


439.7 10210 10650 21940
TOTAL PIPELINE LENGTH (m) 32590
TOTAL WELD 2758
REPAIR R1 REPAIR R2

BACK LOG ACUMMUL TOTAL


TO ATIVE
TOTAL REPAIR REMAINING TO
Total Repair ACC (SHOT) REPAIR ACC (SHOT) REPAIR
REPAIR R1+R2
(CONSTR
UCTION)

334 320 3 21 21 355 3

KP00H76 DAILY RT PROGRESS 10/27/2021


KP02H02 RT REQUESTED
REPAIR
KP01H59 FRESH REPAIR R2
R1
5 0 0

KP10H58
KP21H67
KP31H56
KP31H55
KP10H61A
OVERALL QAQC STATUS 10/28/2021

WELDING PROGRESS STATUS OVERALL RT STATUS 10/28/2021

ACUMMULATIVE
TOTAL JT
COMPLETED INCOMPLETE WELDING REMAINING
PROGRESS FRESH RT ACC REJ
WELD WELD RT SHOT
SHOT
(COM+INCOM)

2427 0 2427 2423 2089 334 4

DAILY WELDING PROGRESS 10/28/2021


INCOMPLETED
TODAY PREVIOUS ACCUMULATIVE WELD
2 2392 2427 0

FJC ACTIVITY 10/28/2021


TODAY PREVIOUS ACCUMULATIVE REMAINING
4 1998 2002 423

WELD REJECTION REPAIR RATE 10/28/2021


Joint % Length %
13.78 0.22

WELD COMPLETED 88.00 %


FJC 72.59 %
TRENCHING 39.06 %
LOWER IN 37.96 %
BACKFILLING 32.68 %

TRENCHING
TODAY PREVIOUS ACCUMULATIVE REMAINING
260.64 12470 12730 19860

LOWER IN
TODAY PREVIOUS ACCUMULATIVE REMAINING
109.97 12260 12370 20220

TODAY PREVIOUS ACCUMULATIVE REMAINING


0 10650 10650 21940
TOTAL PIPELINE LENGTH (m) 32590
TOTAL WELD 2758
REPAIR R1 REPAIR R2

BACK LOG ACUMMUL TOTAL


TO ATIVE
TOTAL REPAIR REMAINING TO
Total Repair ACC (SHOT) REPAIR ACC (SHOT) REPAIR
REPAIR R1+R2
(CONSTR
UCTION)

334 320 3 21 21 355 3

KP00H76 DAILY RT PROGRESS 10/28/2021


KP02H02 RT REQUESTED
REPAIR
KP01H59 FRESH REPAIR R2
R1
5 0 0

KP10H58
KP21H67
KP31H56
KP31H55
KP10H61A
OVERALL QAQC STATUS 10/29/2021

WELDING PROGRESS STATUS OVERALL RT STATUS 10/29/2021

ACUMMULATIVE
TOTAL JT
COMPLETED INCOMPLETE WELDING REMAINING
PROGRESS FRESH RT ACC REJ
WELD WELD RT SHOT
SHOT
(COM+INCOM)

2427 0 2427 2423 2089 334 4

DAILY WELDING PROGRESS 10/29/2021


INCOMPLETED
TODAY PREVIOUS ACCUMULATIVE WELD
2 2392 2427 0

FJC ACTIVITY 10/29/2021


TODAY PREVIOUS ACCUMULATIVE REMAINING
4 1998 2002 423

WELD REJECTION REPAIR RATE 10/29/2021


Joint % Length %
13.78 0.22

WELD COMPLETED 88.00 %


FJC 72.59 %
TRENCHING 39.18 %
LOWER IN 38.54 %
BACKFILLING 32.68 %

TRENCHING
TODAY PREVIOUS ACCUMULATIVE REMAINING
40 12730 12770 19820

LOWER IN
TODAY PREVIOUS ACCUMULATIVE REMAINING
190.67 12370 12560 20030

TODAY PREVIOUS ACCUMULATIVE REMAINING


0 10650 10650 21940
TOTAL PIPELINE LENGTH (m) 32590
TOTAL WELD 2758
REPAIR R1 REPAIR R2

BACK LOG ACUMMUL TOTAL


TO ATIVE
TOTAL REPAIR REMAINING TO
Total Repair ACC (SHOT) REPAIR ACC (SHOT) REPAIR
REPAIR R1+R2
(CONSTR
UCTION)

334 320 3 21 21 355 3

KP00H76 DAILY RT PROGRESS 10/29/2021


KP02H02 RT REQUESTED
REPAIR
KP01H59 FRESH REPAIR R2
R1
2 0 0

KP30H50
KP11H09
KP22H50
OVERALL QAQC STATUS 10/30/2021

WELDING PROGRESS STATUS OVERALL RT STATUS 10/30/2021

ACUMMULATIVE
TOTAL JT
COMPLETED INCOMPLETE WELDING REMAINING
PROGRESS FRESH RT ACC REJ
WELD WELD RT SHOT
SHOT
(COM+INCOM)

2428 1 2429 2425 2091 334 3

DAILY WELDING PROGRESS 10/30/2021


INCOMPLETED
TODAY PREVIOUS ACCUMULATIVE WELD
2 2392 2429 1

FJC ACTIVITY 10/30/2021


TODAY PREVIOUS ACCUMULATIVE REMAINING
1 2002 2003 423

WELD REJECTION REPAIR RATE 10/30/2021


Joint % Length %
13.77 0.22

WELD COMPLETED 88.03 %


FJC 72.63 %
TRENCHING 39.18 %
LOWER IN 38.54 %
BACKFILLING 32.68 %

TRENCHING
TODAY PREVIOUS ACCUMULATIVE REMAINING
40 12730 12770 19820

LOWER IN
TODAY PREVIOUS ACCUMULATIVE REMAINING
190.67 12370 12560 20030

TODAY PREVIOUS ACCUMULATIVE REMAINING


0 10650 10650 21940
TOTAL PIPELINE LENGTH (m) 32590
TOTAL WELD 2758
REPAIR R1 REPAIR R2

BACK LOG ACUMMUL TOTAL


TO ATIVE
TOTAL REPAIR REMAINING TO
Total Repair ACC (SHOT) REPAIR ACC (SHOT) REPAIR
REPAIR R1+R2
(CONSTR
UCTION)

334 320 3 21 21 355 3

KP00H76 DAILY RT PROGRESS 10/30/2021


KP02H02 RT REQUESTED
REPAIR
KP01H59 FRESH REPAIR R2
R1
1 0 0

KP20H13

You might also like