Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION B PAGE NUMBER
NUMBER
Bill 3 - Gate 07 (Al Rashid Walk) SITEWORK
Architectural & ID Works Package 3/B 1.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION B - SITE WORKS

Demolitions & Alterations

A The works comprise the demolition of existing building


as shown on the drawings disposal of debris to
Municipality approved dump and leaving the area in a
clean and level condition. work to be executed strictly
in such a manner so that existing other structure
should not be disturbed & to the satisfaction of the
Engineer 1 Item

B The Contract includes for obtaining all necessary


NOCs from service authorities and including for the
usage of trucks and disposal of debris 1 Item

C Contractor shall visit the site before submitting his


price and ensure that he allows for all relevant and
required items. This shall include any protection works 1 Item

D Contractor shall ensure that he has current insurances


in accordance with all Municipality regulations. Copies
of these insurances will be required by the Engineer 1 Item

The Demolition works shall include the following

E Demolition of existing Block work 1,131 m2

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION B PAGE NUMBER
NUMBER
Bill 3 - Gate 07 (Al Rashid Walk) SITEWORK
Architectural & ID Works Package 3/B 2.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION B - SITE WORKS (CONT'D)

Additional items

The tendered is to identify here below any other item(s)


which he may consider applicable yet not given in
the BOQ, quantified and priced, to ensure the
sufficiency and completeness of the Lump Sum Price.
Should the tendered fail to insert any Item(s) here, it
shall be deemed that their lump sum price includes all
items whether shown on the drawings, or implied by
interpretation, or described in the specifications. The
lump sum price shall represent the entire value of the
works and no subsequent claim for any additional
items will be entertained.

Total to Collection (SAR)


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION B PAGE NUMBER
NUMBER
Bill 3 - Gate 07 (Al Rashid Walk) SITEWORK
Architectural & ID Works Package 3/B 3.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION B - SITE WORKS

Collection

Page 3/B.1 -

Page 3/B.2

Total to Bill Summary (SAR) -


BILL 3
SECTION C - CONCRETE WORKS
Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION C PAGE NUMBER
NUMBER
Bill 3 - Gate 07 (Al Rashid Walk) CONCRETE
Architectural & ID Works Package 3/C 1
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION C - CONCRETE WORK

N/A

Total to Bill Summary (SAR) N/A


BILL 3
SECTION D - MASONRY WORKS
Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION D PAGE NUMBER
NUMBER
Bill 3 - Gate 07 (Al Rashid Walk) MASONRY
Architectural & ID Works Package 3/D 1
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION D - MASONRY

External / Internal Block Works

External/Internal block walls including mortar, lintels,


jambs and sills around the openings, horizontal and
vertical reinforcement, joints, fixing and fitting material,
grouting material, insulation, thermal insulation,
acoustical insulation and all necessary works
complete in accordance with the specifications and
the drawings

A W01: 250mm AAC Block 454 m2

B W01B: 250mm AAC Block (2 Hr. Fire Rating) 114 m2

C W02: 250mm CMU 363 m2

D W03: 200mm CMU 249 m2

E W03B: 200mm CMU (2 Hr. Fire Rating) 71 m2

F W04: 150mm CMU 7 m2

Total to Collection (SAR) 0.00


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION D PAGE NUMBER
NUMBER
Bill 3 - Gate 07 (Al Rashid Walk) MASONRY
Architectural & ID Works Package 3/D 2
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION D - MASONRY (CONT'D)

Additional items

The tendered is to identify here below any other item(s)


which he may consider applicable yet not given in
the BOQ, quantified and priced, to ensure the
sufficiency and completeness of the Lump Sum Price.
Should the tendered fail to insert any Item(s) here, it
shall be deemed that their lump sum price includes all
items whether shown on the drawings, or implied by
interpretation, or described in the specifications. The
lump sum price shall represent the entire value of the
works and no subsequent claim for any additional
items will be entertained.

Total to Collection (SAR)


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION D PAGE NUMBER
NUMBER
Bill 3 - Gate 07 (Al Rashid Walk) MASONRY
Architectural & ID Works Package 3/D 3
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION D - MASONRY

Collection

Page 3/D.1

Page 3/D.2

Total to Bill Summary (SAR)


BILL 3
SECTION E - METAL WORKS
Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION E PAGE NUMBER
NUMBER
Bill 3 - Gate 07 (Al Rashid Walk) METALWORK
Architectural & ID Works Package 3/E 1
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION E - METALWORK

N/A

Total to Bill Summary (SAR) N/A


z1Zzq
SECTION F - WOODWORK
Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION F PAGE NUMBER
NUMBER
Bill 3 - Gate 07 (Al Rashid Walk) WOODWORK
Architectural & ID Works Package 3/F 1
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION F - WOODWORK

N/A

Total to Bill Summary (SAR) N/A


BILL 3
SECTION G - THERMAL AND MOISTURE PROTECTION
Renovation and Extension of AL RASHID MALL SECTION G
BILL
at Olaya, Al Khobar, KSA THERMAL AND PAGE NUMBER
NUMBER
Bill 3 - Gate 07 (Al Rashid Walk) MOISTURE
Architectural & ID Works Package PROTECTION 3/G 1
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION G - THERMAL AND MOISTURE


PROTECTION

Roof/Terrace membrane system

Supply and apply waterproofing system to terraces


including roof layers and heat insulation, and all
necessary works including works complete in
accordance with specifications and drawings

A Roof Floor (including insulation) 340 m2

B Terrace 195 m2

Total to Collection (SAR)


Renovation and Extension of AL RASHID MALL SECTION G
BILL
at Olaya, Al Khobar, KSA THERMAL AND PAGE NUMBER
NUMBER
Bill 3 - Gate 07 (Al Rashid Walk) MOISTURE
Architectural & ID Works Package PROTECTION 3/G 2
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION G - THERMAL AND MOISTURE


PROTECTION (CONT'D)

Additional items

The tendered is to identify here below any other item(s)


which he may consider applicable yet not given in
the BOQ, quantified and priced, to ensure the
sufficiency and completeness of the Lump Sum Price.
Should the tendered fail to insert any Item(s) here, it
shall be deemed that their lump sum price includes all
items whether shown on the drawings, or implied by
interpretation, or described in the specifications. The
lump sum price shall represent the entire value of the
works and no subsequent claim for any additional
items will be entertained.

Total to Collection (SAR)


Renovation and Extension of AL RASHID MALL SECTION G
BILL
at Olaya, Al Khobar, KSA THERMAL AND PAGE NUMBER
NUMBER
Bill 3 - Gate 07 (Al Rashid Walk) MOISTURE
Architectural & ID Works Package PROTECTION 3/G 3
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION G - THERMAL AND MOISTURE


PROTECTION

Collection

Page 3/G.1

Page 3/G.2

Total to Bill Summary (SAR)


BILL 3
SECTION H - DOORS AND WINDOWS
Renovation and Extension of AL RASHID MALL SECTION H BILL
at Olaya, Al Khobar, KSA PAGE NUMBER
DOORS AND NUMBER
Bill 3 - Gate 07 (Al Rashid Walk)
WINDOWS
Architectural & ID Works Package 3/H 1.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION H - DOORS AND WINDOWS

Hollow Metal Doors (BOH)

Supply and install Metal doors including, fire rating,


acoustic (as required), frame, sub frames, architrave,
finishes, glazing works (vision panels as required),
ironmongery, grills, fixing, fittings, accessories and all
necessary works complete in accordance with the
specifications and drawings

A D-03: Size 1100 x 2250mm 3 No.

B D-50: Size 800 x 2250mm 1 No.

C D-50A: Size 800 x 2250mm 1 No.

D D-61: Size 1600 x 2250mm 2 No.

E D-201: Size 2000 x 1000mm 4 No.

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL SECTION H BILL
at Olaya, Al Khobar, KSA PAGE NUMBER
DOORS AND NUMBER
Bill 3 - Gate 07 (Al Rashid Walk)
WINDOWS
Architectural & ID Works Package 3/H 2.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION H - DOORS AND WINDOWS (CONT'D)

Glazing

Supply and install Glazing System all necessary


works complete in accordance with the specifications
and drawings

A W-26: Vestibule Glass (6030mm x 15505mm)


including 1 sliding doors 2500mm x 3200mm 1 No.

Supply and install Exterior Facade Glazing with all


necessary works complete in accordance with the
specifications and drawings

B Stick System Glazed, Polyester Powder Coated


Aluminium Curtain System (Ref: 03) 463 m2

C Glass Handrail, 1025mm height, Laminated Safety


Clear Glass Balustrade with polished stainless steel
handrail (Ref: 26) 49 m2

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL SECTION H BILL
at Olaya, Al Khobar, KSA PAGE NUMBER
DOORS AND NUMBER
Bill 3 - Gate 07 (Al Rashid Walk)
WINDOWS
Architectural & ID Works Package 3/H 3.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION H - DOORS AND WINDOWS (CONT'D)

Glazing (Cont'd)

Supply and install Foldable Partition including, fire


rating, acoustic (as required), frame, sub frames,
architrave, finishes, glazing works (vision panels as
required), ironmongery, grills, fixing, fittings,
accessories and all necessary works complete in
accordance with the specifications and drawings

A Foldable Partition 40 m2

External Finishes

Aluminium work including steel support, framing


element all necessary works complete in accordance
with the specifications and drawings

B Provision for shop-front signage backlit, static by tenant


to follow signage guidelines from landlord (Ref: 22) 4 No.

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL SECTION H BILL
at Olaya, Al Khobar, KSA PAGE NUMBER
DOORS AND NUMBER
Bill 3 - Gate 07 (Al Rashid Walk)
WINDOWS
Architectural & ID Works Package 3/H 3.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION H - DOORS AND WINDOWS (CONT'D)

Additional items

The tenderer is to identify here below any other item(s)


which he may consider applicable yet not given in
the BOQ, quantified and priced, to ensure the
sufficiency and completeness of the Lump Sum Price.
Should the tenderer fail to insert any Item(s) here, it
shall be deemed that their lump sum price includes all
items whether shown on the drawings, or implied by
interpretation, or described in the specifications. The
lump sum price shall represent the entire value of the
works and no subsequent claim for any will be
entertained.

Total to Collection (SAR)


Renovation and Extension of AL RASHID MALL SECTION H BILL
at Olaya, Al Khobar, KSA PAGE NUMBER
DOORS AND NUMBER
Bill 3 - Gate 07 (Al Rashid Walk)
WINDOWS
Architectural & ID Works Package 3/H 4.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION H - DOORS AND WINDOWS

Collection

Page 3/H.1

Page 3/H.2

Page 3/H.3

Page 3/H.4

Total to Bill Summary (SAR)


BILL 3
SECTION J - FINISHES
Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION J PAGE NUMBER
NUMBER
Bill 3 - Gate 07 (Al Rashid Walk) FINISHES
Architectural & ID Works Package 3/J 1.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION J - FINISHES

BOH Areas

Backgrounds

Cement Sand Screed

Cement Screed to attain the required finish floor level


including all necessary works complete in accordance
with the specifications and drawings

A To Receive Floor Finishes 161 m2

Floor Finishes

Supply and install tile finishes including


adhesive and all necessary works complete in
accordance with the specifications and drawings

B TL-104: Heavy Duty Matt Porcelain Tile 161 m2

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION J PAGE NUMBER
NUMBER
Bill 3 - Gate 07 (Al Rashid Walk) FINISHES
Architectural & ID Works Package 3/J 2.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION J - FINISHES CONT'D)

External Finishes

External Plaster

Cement sand plaster to walls, 20mm thick including


chipping, angle beds, metal lath, plaster stopper and
all necessary works, complete in accordance with
specification and drawings

A To receive Wall finishes 622 m2

Supply and install Exterior Wall Finishes all necessary


works complete in accordance with the specifications
and drawings

B Heavy Textured, Trowelled Applied Latex Exterior


Paint (Ref: 02) 622 m2

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION J PAGE NUMBER
NUMBER
Bill 3 - Gate 07 (Al Rashid Walk) FINISHES
Architectural & ID Works Package 3/J 3.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION J - FINISHES CONT'D)

Aluminium Works

Aluminium work including steel support, framing


element all necessary works complete in accordance
with the specifications and drawings

A Aluminium Profile Framing System, Powder Coated,


Wood Grain or Wood Looking (Ref: 14) 680 m2

B Aluminium Sandwich Panels on Mullions and


Transom (Ref: 31) 98 m2

Canopy

C Canopy / Pergola System Powder Coated Solid


Aluminium Panel on Lightweight steel columns and
beams with Wood Grain or Wood Looking Aluminium
Pergola Infill System (Ref. 19) 294 m2

Total to Collection (SAR)


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION J PAGE NUMBER
NUMBER
Bill 3 - Gate 07 (Al Rashid Walk) FINISHES
Architectural & ID Works Package 3/J 4.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION J - FINISHES CONT'D)

Supply and Install Façade Type including all finishes


framing element all necessary works complete in
accordance with the specifications and drawings

A Type 1 façade 2 No
Refurbished and Reinstalled Precast Concrete Units,
coated with Façade Paint (Ref: 01 - 27m2)
Stick System Glazed, Polyester Powder Coated
Aluminium Curtain System (Ref: 03 - 16m2)
Chrome finished, Extruded Aluminium Profile
(Ref: 12 - 6m2)
Powder Coated Aluminium Mashrabiya Screen Panels
on frames (Ref: 13 - 10m2)
Mechanically fixed Travertine Honed Finish Stone
Cladding (20mm thk.) (Ref: 17 - 80m2)
Canopy system, Powder Coated Solid Aluminium
Cladiing on Lightweight steel (Ref: 18 - 5m2)
Powder Coated Aluminium Framed Glazed Spandrel
Panel (Ref: 25 - 3m2)

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION J PAGE NUMBER
NUMBER
Bill 3 - Gate 07 (Al Rashid Walk) FINISHES
Architectural & ID Works Package 3/J 5.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION J - FINISHES CONT'D)

Supply and Install Façade Type including all finishes


framing element all necessary works complete in
accordance with the specifications and drawings
(Cont'd)

A Type 2 façade 4 No
Refurbished and Reinstalled Precast Concrete Units,
coated with Façade Paint (Ref: 01 - 27m2)
Stick System Glazed, Polyester Powder Coated
Aluminium Curtain System (Ref: 03 - 20m2)
Chrome finished, Extruded Aluminium Profile
(Ref: 12 - 8m2)
Mechanically fixed Travertine Honed Finish Stone
Cladding (20mm thk.) (Ref: 17 - 67m2)
Canopy system, Powder Coated Solid Aluminium
Cladiing on Lightweight steel (Ref: 18 - 4m2)
Powder Coated Aluminium Framed Glazed Spandrel
Panel (Ref: 25 - 4m2)

B Type 4 façade 3 No
Refurbished and Reinstalled Precast Concrete Units,
coated with Façade Paint (Ref: 01 - 25m2)
Stick System Glazed, Polyester Powder Coated
Aluminium Curtain System (Ref: 03 - 70m2)
Chrome finished, Extruded Aluminium Profile
(Ref: 12 - 5m2)
Mechanically fixed Travertine Honed Finish Stone
Cladding (20mm thk.) (Ref: 17 - 125m2)

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION J PAGE NUMBER
NUMBER
Bill 3 - Gate 07 (Al Rashid Walk) FINISHES
Architectural & ID Works Package 3/J 6.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION J - FINISHES CONT'D)

Supply and Install Façade Type including all finishes


framing element all necessary works complete in
accordance with the specifications and drawings
(Cont'd)

C Type 5 façade 8 No
Refurbished and Reinstalled Precast Concrete Units,
coated with Façade Paint (Ref: 01 - 30m2)
Mechanically fixed Travertine Honed Finish Stone
Cladding (20mm thk.) (Ref: 17 - 13m2)
Powder Coated Aluminium Frames for Backlit/Static
Signage (Ref: 20 - 44m2)

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION J PAGE NUMBER
NUMBER
Bill 3 - Gate 07 (Al Rashid Walk) FINISHES
Architectural & ID Works Package 3/J 7.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION J - FINISHES CONT'D)

Additional items

The tendered is to identify here below any other item


(s) which he may consider applicable yet not given in
the BOQ, quantified and priced, to ensure the
sufficiency and completeness of the Lump Sum Price.
Should the tendered fail to insert any Item(s) here, it
shall be deemed that their lump sum price includes all
items whether shown on the drawings, or implied by
interpretation, or described in the specifications. The
lump sum price shall represent the entire value of the
works and no subsequent claim for any additional
items will be entertained.

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION J PAGE NUMBER
NUMBER
Bill 3 - Gate 07 (Al Rashid Walk) FINISHES
Architectural & ID Works Package 3/J 8.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION J - FINISHES

Collection

Page 3/J.1

Page 3/J.2

Page 3/J.3

Page 3/J.4

Page 3/J.5

Page 3/J.6

Page 3/J.7

Total to Bill Summary (SAR) -


BILL 3
SECTION K - SPECIALITIES
Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION K PAGE NUMBER
NUMBER
Bill 3 - Gate 07 (Al Rashid Walk) SPECIALITIES
Architectural & ID Works Package 3/K 1
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION K - SPECIALITIES

Signage and Way findings

Supply and install signages and way findings,


including fixing, accessories supports,
anchors/dowels, fittings, finishes and all necessary
works, as per concept design report as required,
complete in accordance with the specifications and
drawings

A Internal Signages & Way findings 1 Item

External Signages

Supply and install External Signage System all


necessary works complete in accordance with the
specifications and drawings

B External Signages & Way findings 1 Item

Total to Collection (SAR) 0.00


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION K PAGE NUMBER
NUMBER
Bill 3 - Gate 07 (Al Rashid Walk) SPECIALITIES
Architectural & ID Works Package 3/K 2
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION K - SPECIALITIES (CONT'D)

Additional items

The tendered is to identify here below any other item


(s) which he may consider applicable yet not given in
the BOQ, quantified and priced, to ensure the
sufficiency and completeness of the Lump Sum Price.
Should the tendered fail to insert any Item(s) here, it
shall be deemed that their lump sum price includes all
items whether shown on the drawings, or implied by
interpretation, or described in the specifications. The
lump sum price shall represent the entire value of the
works and no subsequent claim for any additional
items will be entertained.

Total to Collection (SAR)


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION K PAGE NUMBER
NUMBER
Bill 3 - Gate 07 (Al Rashid Walk) SPECIALITIES
Architectural & ID Works Package 3/K 3
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION K - SPECIALITIES

Collection

Page 3/K.1

Page 3/K.2

Total to Bill Summary (SAR) 0.00


BILL 3
SECTION L - EQUIPMENT
Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION L PAGE NUMBER
NUMBER
Bill 3 - Gate 07 (Al Rashid Walk) EQUIPMENT
Architectural & ID Works Package 3/L 1
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION L - EQUIPMENT

N/A

Total to Bill Summary (SAR) N/A


BILL 3
SECTION M - FURNISHINGS
Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION M PAGE NUMBER
NUMBER
Bill 3 - Gate 07 (Al Rashid Walk) FURNISHINGS
Architectural & ID Works Package 3/M 1
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION M - FURNISHINGS

N/A

Total to Bill Summary (SAR) N/A


BILL 3
SECTION P - CONVEYING SYSTEMS
Renovation and Extension of AL RASHID MALL SECTION P BILL
at Olaya, Al Khobar, KSA PAGE NUMBER
CONVEYING NUMBER
Bill 3 - Gate 07 (Al Rashid Walk)
SYSTEMS
Architectural & ID Works Package 3/P 1
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION P - CONVEYING SYSTEMS

N/A

Total to Bill Summary (SAR) N/A


BILL 3
SECTION Q - MECHANICAL WORKS
Renovation and Extension of AL RASHID MALL SECTION Q
BILL
at Olaya, Al Khobar, KSA MECHANICAL PAGE NUMBER
NUMBER
Bill 3 - Gate 07 (Al Rashid Walk) ENGINEERING
Architectural & ID Works Package INSTALLATIONS 3/Q 1
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION Q - MECHANICAL ENGINEERING INSTALLATIONS

N/A

Total to Bill Summary (SAR) N/A


BILL 3
SECTION R - ELECTRICAL WORKS
Renovation and Extension of AL RASHID MALL SECTION R
BILL
at Olaya, Al Khobar, KSA ELECTRICAL PAGE NUMBER
NUMBER
Bill 3 - Gate 07 (Al Rashid Walk) ENGINEERING
Architectural & ID Works Package INSTALLATIONS 3/R 1
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION R - ELECTRICAL ENGINEERING INSTALLATIONS

N/A

Total to Bill Summary (SAR) N/A


BILL 3
SUMMARY
Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA BILL 3 PAGE NUMBER
NUMBER
Bill 3 - Gate 07 (Al Rashid Walk) SUMMARY
Architectural & ID Works Package B3/S 3/S
Item Description Quantity Unit Rate (SAR) Total (SAR)

BILL 3 - SUMMARY

SECTION B - SITE WORKS (DEMOLITION ONLY) -

SECTION C - CONCRETE WORK N/A

SECTION D - MASONRY -

SECTION E - METALWORK N/A

SECTION F - WOODWORK N/A

SECTION G - THERMAL AND MOISTURE PROTECTION -

SECTION H - DOORS AND WINDOWS -

SECTION J - FINISHES -

SECTION K - SPECIALITIES -

SECTION L - EQUIPMENT N/A

SECTION M - FURNISHINGS N/A

SECTION P - CONVEYING SYSTEMS N/A

SECTION Q - MECHANICAL ENGINEERING N/A


INSTALLATIONS

SECTION R - ELECTRICAL ENGINEERING N/A


INSTALLATIONS

Total - Saudi Arabian Riyals..


-