BILL 8

BASEMENT
BILL 8
SECTION B - SITE WORKS
Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION B PAGE NUMBER
NUMBER
Bill 8 - Basement SITEWORK
Architectural & ID Works Package 8/B 1.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION B - SITE WORKS

Demolitions & Alterations

A The works comprise the demolition of existing building


as shown on the drawings disposal of debris to
Municipality approved dump and leaving the area in a
clean and level condition. work to be executed strictly
in such a manner so that existing other structure
should not be disturbed & to the satisfaction of the
Engineer 1 Item

B The Contract includes for obtaining all necessary


NOCs from service authorities and including for the
usage of trucks and disposal of debris 1 Item

C Contractor shall visit the site before submitting his


price and ensure that he allows for all relevant and
required items. This shall include any protection or 1 Item

D Contractor shall ensure that he has current insurances


in accordance with all Municipality regulations. Copies
of these insurances will be required by the Engineer 1 Item

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION B PAGE NUMBER
NUMBER
Bill 8 - Basement SITEWORK
Architectural & ID Works Package 8/B 2.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION B - SITE WORKS (CONT'D)

The Demolition works shall include the following

A Demolition of Existing Structure (above-ground)


(Building, Concrete) 1 Item

B Demolition of Existing Structure (below-ground)


(Underground structures including foundations,
tanks, pits, manholes, trenches, etc.) 1 Item

C Demolition of Existing Interlocking Paving 1 Item

D Demolition of Existing Block Work 2,929 m2

E Demolition of Barrier Gates 1 No.

F Carfully remove the Security Kiosk for new location 1 No.

G Demolition of remaining items in the GO Kart area


upon removal of items by the Operator 1 Item

H Demolition of existing Floor Finishes Area 20,846 m2

J Demolition of existing Wall Finishes Area 2,046 m2

K Demolition of existing Ceiling Finishes Area 20,655 m2

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION B PAGE NUMBER
NUMBER
Bill 8 - Basement SITEWORK
Architectural & ID Works Package 8/B 3.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION B - SITE WORKS (CONT'D)

Carefully remove the existing Doors and


handover to Client

L Single Doors 34 No.

M Double Doors 21 No.

N Double Doors (both side swinging) 5 No.

P Safely dismantle the complete existing Escalator


system 2 No.

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION B PAGE NUMBER
NUMBER
Bill 8 - Basement SITEWORK
Architectural & ID Works Package 8/B 4.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION B - SITE WORKS (CONT'D)

Additional items

The tendered is to identify here below any other item(s)


which he may consider applicable yet not given in
the BOQ, quantified and priced, to ensure the
sufficiency and completeness of the Lump Sum Price.
Should the tendered fail to insert any Item(s) here, it
shall be deemed that their lump sum price includes all
items whether shown on the drawings, or implied by
interpretation, or described in the specifications. The
lump sum price shall represent the entire value of the
works and no subsequent claim for any additional
items will be entertained.

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION B PAGE NUMBER
NUMBER
Bill 8 - Basement SITEWORK
Architectural & ID Works Package 8/B 5.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION B - SITE WORKS

Collection

Page 8/B.1 -

Page 8/B.2 -

Page 8/B.3 -

Page 8/B.4

Total to Bill Summary (SAR) -


BILL 8
SECTION C - CONCRETE WORKS
Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION C PAGE NUMBER
NUMBER
Bill 8 - Basement CONCRETE
Architectural & ID Works Package 8/C 1
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION C - CONCRETE WORK

N/A

Total to Bill Summary (SAR) N/A


BILL 8
SECTION D - MASONRY WORKS
Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION D PAGE NUMBER
NUMBER
Bill 8 - Basement MASONRY
Architectural & ID Works Package 8/D 1.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION D - MASONRY

External / Internal Block Works

External/Internal block walls including mortar, lintels,


jambs and sills around the openings, horizontal and
vertical reinforcement, joints, fixing and fitting material,
grouting material, insulation, thermal insulation,
acoustical insulation and all necessary works
complete in accordance with the specifications and
the drawings

A W03: 200mm CMU 84 m2

B W03A: 200mm CMU (1 Hr. Fire Rating) 246 m2

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION D PAGE NUMBER
NUMBER
Bill 8 - Basement MASONRY
Architectural & ID Works Package 8/D 2.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION D - MASONRY (CONT'D)

Additional items

The tendered is to identify here below any other item(s)


which he may consider applicable yet not given in
the BOQ, quantified and priced, to ensure the
sufficiency and completeness of the Lump Sum Price.
Should the tendered fail to insert any Item(s) here, it
shall be deemed that their lump sum price includes all
items whether shown on the drawings, or implied by
interpretation, or described in the specifications. The
lump sum price shall represent the entire value of the
works and no subsequent claim for any additional
items will be entertained.

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION D PAGE NUMBER
NUMBER
Bill 8 - Basement MASONRY
Architectural & ID Works Package 8/D 3.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION D - MASONRY

Collection

Page 8/D.1 -

Page 8/D.2 -

Total to Bill Summary (SAR) -


BILL 8
SECTION E - METAL WORKS
Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION E PAGE NUMBER
NUMBER
Bill 8 - Basement METALWORK
Architectural & ID Works Package 8/E 1.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION E - METALWORK

Non Structural Metalwork

Ladders

Supply and install GRP ladders including rungs,


posts, support, fixing, fittings, and all necessary
works completein accordance with the specifications
and drawings

A To Water Tanks 8 No.

Access Hatch

Supply and install metal access hatch including


frame,support, fixing, fittings, accessories and all
necessaryworks complete in accordance with the
specifications anddrawings

B To Water Tanks (Size: 800 x 800) 4 No.

Gutter Drain

Supply and install gutter drain including frame,


supports, accessories, fixings, fittings and all
necessary works complete in accordance with the
specifications and drawings

C 400mm wide 30 m

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION E PAGE NUMBER
NUMBER
Bill 8 - Basement METALWORK
Architectural & ID Works Package 8/E 2.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION E - METALWORK (CONT'D)

Additional items

The tendered is to identify here below any other item(s)


which he may consider applicable yet not given in
the BOQ, quantified and priced, to ensure the
sufficiency and completeness of the Lump Sum Price.
Should the tendered fail to insert any Item(s) here, it
shall be deemed that their lump sum price includes all
items whether shown on the drawings, or implied by
interpretation, or described in the specifications. The
lump sum price shall represent the entire value of the
works and no subsequent claim for any additional
items will be entertained

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION E PAGE NUMBER
NUMBER
Bill 8 - Basement METALWORK
Architectural & ID Works Package 8/E 3.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION E - METALWORK

Collection

Page 8/E.1 -

Page 8/E.2 -

Total to Bill Summary (SAR) -


BILL 8
SECTION F - WOODWORK
Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION F PAGE NUMBER
NUMBER
Bill 8 - Basement WOODWORK
Architectural & ID Works Package 8/F 1
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION F - WOODWORK

N/A

Total to Bill Summary (SAR) N/A


BILL 8
SECTION G - THERMAL AND MOISTURE PROTECTION
Renovation and Extension of AL RASHID MALL SECTION G
BILL
at Olaya, Al Khobar, KSA THERMAL AND PAGE NUMBER
NUMBER
Bill 8 - Basement MOISTURE
Architectural & ID Works Package PROTECTION 8/G 1.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION G - THERMAL AND MOISTURE


PROTECTION

Wet Areas Cementitious Waterproofing System

Supply and apply waterproofing system to wet areas


including surface preparation, angle fillet, and all
necessary works including works complete in
accordance with specifications and drawings

A To Floor 129 m2

B To Walls 246 m2

Internal Water Tank Waterproofing

Supply and install waterproofing non-toxic epoxy paint


in snow white color, including adhesive and all
necessary works complete in accordance with the
specifications and drawings

C To Floor 510 m2

D To Wall 720 m2

E To Ceiling 510 m2

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL SECTION G
BILL
at Olaya, Al Khobar, KSA THERMAL AND PAGE NUMBER
NUMBER
Bill 8 - Basement MOISTURE
Architectural & ID Works Package PROTECTION 8/G 2.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION G - THERMAL AND MOISTURE


PROTECTION (CONT'D)

Additional items

The tendered is to identify here below any other item(s)


which he may consider applicable yet not given in
the BOQ, quantified and priced, to ensure the
sufficiency and completeness of the Lump Sum Price.
Should the tendered fail to insert any Item(s) here, it
shall be deemed that their lump sum price includes all
items whether shown on the drawings, or implied by
interpretation, or described in the specifications. The
lump sum price shall represent the entire value of the
works and no subsequent claim for any additional
items will be entertained.

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL SECTION G
BILL
at Olaya, Al Khobar, KSA THERMAL AND PAGE NUMBER
NUMBER
Bill 8 - Basement MOISTURE
Architectural & ID Works Package PROTECTION 8/G 3.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION G - THERMAL AND MOISTURE


PROTECTION

Collection

Page 8/G.1 -

Page 8/G.2 -

Total to Bill Summary (SAR) -


BILL 8
SECTION H - DOORS AND WINDOWS
Renovation and Extension of AL RASHID MALL SECTION H BILL
at Olaya, Al Khobar, KSA PAGE NUMBER
DOORS AND NUMBER
Bill 8 - Basement
WINDOWS
Architectural & ID Works Package 8/H 1.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION H - DOORS AND WINDOWS

Hollow Metal Doors (BOH)

Supply and install Metal doors including, fire rating,


acoustic (as required), frame, sub frames, architrave,
finishes, glazing works (vision panels as required),
ironmongery, grills, fixing, fittings, accessories and all
necessary works complete in accordance with the
specifications and drawings

A D-03: Size 1100 x 2250mm 2 No.

B D-04: Size 1200 x 2250mm 3 No.

C D-05: Size 1200 x 2250mm 3 No.

D D-50A: Size 800 x 2250mm 1 No.

E D-52: Size 900 x 2250mm 2 No.

F D-55: Size 1100 x 2250mm 1 No.

G D-56B: Size 1100 x 2250mm 6 No.

H D-57B: Size 1100 x 2250mm 2 No.

J D-60: Size 1400 x 2250mm 3 No.

K D-61: Size 1600 x 2250mm 1 No.

L ID-61B: Size 1600mm wide 1 No.

M D-64: Size 1800 x 2250mm 16 No.

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL SECTION H BILL
at Olaya, Al Khobar, KSA PAGE NUMBER
DOORS AND NUMBER
Bill 8 - Basement
WINDOWS
Architectural & ID Works Package 8/H 2.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION H - DOORS AND WINDOWS (CONT'D)

Doors (FOH)

Supply and install Wooden doors including, fire rating,


acoustic (as required), frame, sub frames, architrave,
finishes, glazing works (vision panels as required),
ironmongery, grills, fixing, fittings, accessories and all
necessary works complete in accordance with the
specifications and drawings

A D-01: Size 1500 x 2400mm (Fire Rated - 90 Mins.) 3 No.

B D-02: Size 1500 x 2400mm (Fire Rated - 60 Mins.) 2 No.

C D-03: Size 900 x 2400mm (Fire Rated - 60 Mins.) 2 No.

D D-06: Size 1150 x 2400mm 4 No.

E D-19: Size 850 x 2400mm 11 No.

F Cupboard door, 900mm wide 2 No.

G Cupboard door, 1100mm wide 2 No.

Glazing

Supply and install Glazing System all necessary


works complete in accordance with the specifications
and drawings

H W-04: Size 9185 x 2275mm 1 No.

J W-05: Size 18100 x 2275mm 1 No.

K W-06: Size 9185 x 2275mm 1 No.

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL SECTION H BILL
at Olaya, Al Khobar, KSA PAGE NUMBER
DOORS AND NUMBER
Bill 8 - Basement
WINDOWS
Architectural & ID Works Package 8/H 3.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION H - DOORS AND WINDOWS (CONT'D)

Additional items

The tenderer is to identify here below any other item(s)


which he may consider applicable yet not given in
the BOQ, quantified and priced, to ensure the
sufficiency and completeness of the Lump Sum Price.
Should the tenderer fail to insert any Item(s) here, it
shall be deemed that their lump sum price includes all
items whether shown on the drawings, or implied by
interpretation, or described in the specifications. The
lump sum price shall represent the entire value of the
works and no subsequent claim for any will be
entertained.

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL SECTION H BILL
at Olaya, Al Khobar, KSA PAGE NUMBER
DOORS AND NUMBER
Bill 8 - Basement
WINDOWS
Architectural & ID Works Package 8/H 4.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION H - DOORS AND WINDOWS

Collection

Page 8/H.1 -

Page 8/H.2 -

Page 8/H.3 -

Total to Bill Summary (SAR) -


BILL 8
SECTION J - FINISHES
Renovation and Extension of AL RASHID MALL BILL
at Olaya, Al Khobar, KSA SECTION J PAGE NUMBER
NUMBER
Bill 8 - Basement FINISHES
Architectural & ID Works Package 8/J 1.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION J - FINISHES
BOH Areas

Backgrounds

Cement Sand Screed

Cement Screed to attain the required finish floor level


including all necessary works complete in accordance
with the specifications and drawings

A To Receive Floor Finishes 20,710 m2

Plaster

Cement sand plaster to walls, 15mm thick including


chipping, angle beds, metal lath, plaster stopper and
all necessary works, complete in accordance with
specification and drawings

B To Receive Wall Finish 1,421 m2

C To Receive Ceiling Finish 20,655 m2

Floor Finishes

Supply and install anti static vinyl tile including


adhesive and all necessary works complete in
accordance with the specifications and drawings

D VT-02: Anti Static Heavy Duty Vinyl Tile 88 m2

Raised floor system on stools all necessary works


complete in accordance with the specifications and
drawings

E Raised Floor 333 m2


Supply and install Tile finishes including adhesive and
all necessary works complete in accordance with the
specifications and drawings

F TL-100: Matt Pocelain Tiles 121 m2

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL BILL
at Olaya, Al Khobar, KSA SECTION J PAGE NUMBER
NUMBER
Bill 8 - Basement FINISHES
Architectural & ID Works Package 8/J 2.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION J - FINISHES (CONT'D)

Floor Finishes Cont'd

Supply and apply epoxy paint floor coating on smooth


concrete, including all necessary works complete in
accordance with the specifications and drawings

A ER-01: Epoxy Based Matt Flooring 97 m2

B ER-02: High Gloss, Heavy Duty Epoxy Based Flooring 255 m2

C ER-03: Epoxy Based Matt Flooring 108 m2

D ER-04: High Gloss, Heavy Duty Epoxy Based Flooring 35 m2

E EP-01: Standard Duty Epoxy Based Pedestrian Traffic


Coating 233 m2

Supply and apply PU coating finishes including


adhesive and all necessary works complete in
accordance with the specifications and drawings

F PU-01: Polyurethene Based Floor Topping 19,440 m2

Supply and apply floor finishes including all necessary


works complete in accordance with the specifications
and drawings

G1 New - Ramp Finish 196 m2

G2 Repaint - Ramp Finish 1,247 m2

Skirting Finish

Supply and install vinyl skirting including backing,


adhesive and all necessary works complete in
accordance with the specifications and drawings

H B-01: Track Mounted Vinyl 48 m

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL BILL
at Olaya, Al Khobar, KSA SECTION J PAGE NUMBER
NUMBER
Bill 8 - Basement FINISHES
Architectural & ID Works Package 8/J 3.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION J - FINISHES (CONT'D)


Skirting Finish Cont'd
Supply and apply PU skirting including backing,
adhesive and all necessary works complete in
accordance with the specifications and drawings
A B-03: 150mm, Heavy Duty PU 22 m
Supply and install non sag epoxy based wall coating
system including backing, adhesive and all necessary
works complete in accordance with the specifications
and drawings
B B-06: 150mm, Non-Sag Epoxy Based Wall Coating
System 289 m
Supply and install porcelain tile including backing,
adhesive and all necessary works complete in
accordance with the specifications and drawings
C B-09: 100mm, Porcelain Tile Skirting 81 m

Wall Finishes
Supply and apply wall painting with all necessary
works complete in accordance with the specifications
and drawings

D PT-100: Acrylic Emulsion Paint 301 m2

E PT-100/ECP-02: Acrylic Emulsion Paint 473 m2

F PT-101/ECP-01: Epoxy Paint 564 m2

G PT-103/ECP-02: Acrylic Emulsion Paint (Wet Areas) 82 m2

Supply and apply painting works including all


necessary works complete in accordance with the
specifications and drawings
H Existing Wall Painting 5,891 m2

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL BILL
at Olaya, Al Khobar, KSA SECTION J PAGE NUMBER
NUMBER
Bill 8 - Basement FINISHES
Architectural & ID Works Package 8/J 4.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION J - FINISHES (CONT'D)

Ceiling Finishes

Supply and apply ceiling painting all necessary


works complete in accordance with the specifications
and drawings

A ECP-01: Exposed Construction with Epoxy Paint 20,444 m2

B ECP-02: Exposed Construction with Emulsion Paint 176 m2

C ECP-03: Exposed Construction with PU Paint 35 m2

Supply and install Gypsum ceiling all necessary works


specifications and drawings

D CL-03: Suspended Metal Ceiling Tile on Exposed Grid 233 m2

E CL-05: Suspended Gypsum Board Ceiling Tile 209 m2

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL BILL
at Olaya, Al Khobar, KSA SECTION J PAGE NUMBER
NUMBER
Bill 8 - Basement FINISHES
Architectural & ID Works Package 8/J 5.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION J - FINISHES CONT'D)

FOH Areas (ID)

Backgrounds

Cement Sand Screed

Cement Screed to attain the required finish floor level


including all necessary works complete in accordance
with the specifications and drawings

A To Receive Floor Finishes 136 m2

Plaster

Cement sand plaster to walls, 15mm thick including


chipping, angle beds, metal lath, plaster stopper and
all necessary works, complete in accordance with
specification and drawings

B To Receive Wall Finish 625 m2

Floor Finishes

Supply and install ceramic/porcelain tile including


adhesive and all necessary works complete in
accordance with the specifications and drawings

E Porcelain Ston Effect (Ref: CT-103) 113 m2

G Porcelain Floor Tile (Ref: CT-112) 7 m2

Supply and install granite/porcelain stone finish


including adhesive and all necessary works complete
in accordance with the specifications and drawings

J Honed Marble (Ref: ST-105) 54 m

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL BILL
at Olaya, Al Khobar, KSA SECTION J PAGE NUMBER
NUMBER
Bill 8 - Basement FINISHES
Architectural & ID Works Package 8/J 6.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION J - FINISHES CONT'D)

Floor Finishes Cont'd

Supply and install metal finish to strips including all


necessary works complete in accordance with the
specifications and drawings

A Metal Strip (Ref: MT-109) 54 m

Skirting Finish

B Porcelain stone effect (Ref: CT-102) 19 m

C Porcelain stone effect (Ref: CT-103) 90 m

Threshold

Supply and install thresholds including backing,


adhesive and all necessary works complete in
accordance with the specifications and drawings

D Thresholds 4 m

Vanity

Supply and install vanity counter including fascia,


splash back, supports, cut-out for wash basin, fittings,
fixing accessories, sealant, etc.; and all necessary
works complete in accordance with the specifications
and drawings

E Vanity (Ref: SF-101, MT-104) 12 m

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL BILL
at Olaya, Al Khobar, KSA SECTION J PAGE NUMBER
NUMBER
Bill 8 - Basement FINISHES
Architectural & ID Works Package 8/J 7.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION J - FINISHES CONT'D)

Wall Finish

Supply and install ceramic/porcelain tile to walls, all


necessary works complete in accordance with the
specifications and drawings

A Porcelain Stone Effect (Ref: CT-102) 354 m2

B Feature Wall Tile (Ref: CT-113) 64 m2

C Sea Rock Porcelain Tile (Ref: CT-115) 71 m2

Supply and install special finish to walls, all necessary


works complete in accordance with the specifications
and drawings

D Concrete Effect Plaster (Ref: SF-101) 208 m2

E PT-103: Acrylic emulsion paint in wet areas 49 m2

Supply and install wood cladding panels including


frame, support, fixing, fittings, accessories and all
necessary works complete in accordance with the
specifications and drawings

F Wood finish (Ref: WD-102) 87 m2

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL BILL
at Olaya, Al Khobar, KSA SECTION J PAGE NUMBER
NUMBER
Bill 8 - Basement FINISHES
Architectural & ID Works Package 8/J 8.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION J - FINISHES CONT'D)

Ceiling Finishes

Supply and install gypsum board suspended


ceiling including fixing, supports, frames, and all
necessary works complete in accordance with the
specifications and drawings

A Gypsum board 147 m2

B Bulkhead, 150mm high 55 m

C Cove light, 150mm girth 55 m

Supply and install paint including all necessary works


complete in accordance with the specifications and
drawings

D Matt Paint (Ref: PT-103) 163 m2

Supply and install metal strips/trench including all


necessary works complete in accordance with the
specifications and drawings

E Metal Finish (Ref: MT-108) 37 m

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL BILL
at Olaya, Al Khobar, KSA SECTION J PAGE NUMBER
NUMBER
Bill 8 - Basement FINISHES
Architectural & ID Works Package 8/J 9.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION J - FINISHES CONT'D)

Additional items

The tendered is to identify here below any other item


(s) which he may consider applicable yet not given in
the BOQ, quantified and priced, to ensure the
sufficiency and completeness of the Lump Sum Price.
Should the tendered fail to insert any Item(s) here, it
shall be deemed that their lump sum price includes all
items whether shown on the drawings, or implied by
interpretation, or described in the specifications. The
lump sum price shall represent the entire value of the
works and no subsequent claim for any additional
items will be entertained.

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL BILL
at Olaya, Al Khobar, KSA SECTION J PAGE NUMBER
NUMBER
Bill 8 - Basement FINISHES
Architectural & ID Works Package 8/J 10.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION J - FINISHES

Collection

Page 8/J.1 -

Page 8/J.2 -

Page 8/J.3 -

Page 8/J.4 -

Page 8/J.5 -

Page 8/J.6 -

Page 8/J.7 -

Page 8/J.8 -

Page 8/J.9 -

Total to Bill Summary (SAR) -


BILL 8
SECTION K - SPECIALITIES
Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION K PAGE NUMBER
NUMBER
Bill 8 - Basement SPECIALITIES
Architectural & ID Works Package 8/K 1.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION K - SPECIALITIES

Toilet accessories, including fixing, fittings,


accessories and all necessary works complete in
accordance with the specifications and drawings

FOH

A SW-100: BACK TO WALL WC 7 No.

B SW-101: CONCEALED CISTERN 15 No.

C SW-102: SHATTAF WATER SPRAY 15 No.

D SW-103: FLOOR DRAIN 23 No.

E LINEAR DRAIN 4 No.

F SW-104: SENSOR FAUCET 11 No.

G SW-105: SENSOR FLUSH PLATE 15 No.

H SW-106: SQUAT TOILET 4 No.

J SW-107: ACCESSIBLE WC 4 No.

K SW-108: ACCESSIBLE WASH BASIN 4 No.

L SW-109: ACCESSIBLE SENSOR FAUCET 4 No.

M SW-110: JANITOR SINK 4 No.

N SW-111: JANITOR FAUCET 4 No.

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION K PAGE NUMBER
NUMBER
Bill 8 - Basement SPECIALITIES
Architectural & ID Works Package 8/K 2.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION K - SPECIALITIES (CONT'D)

Toilet Accessories (Cont'd)

FOH (cont'd)

A SA-100: MIRROR 4 No.

B SA-101: ROLL HOLDER 11 No.

C SA-102: ROBE HOOK 15 No.

D SA-104: ANGLE GRAB BAR 4 No.

E SA-105: DROP BAR 4 No.

F SA-106: CONCEALED SOAP DISPENSER 11 No.

G SA-107: 3 IN 1 COMBO DRYER/DISPENSER 4 No.

H SA-108: EMERGENCY PULL SYSTEM 4 No.

J SA-109: SOAP DISPENSER 4 No.

K SA-110: GRAB RAIL 4 No.

L SA-111: PAPER DISPENSER 4 No.

M WASTE BIN 15 No.

Supply and install mirrors including fixing backing,


frames, fixing, fittings, accessories and all necessary
works complete in accordance with the specifications
and drawings

N Mirrors 11 No.

P Makeup Mirrors 2 No.

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION K PAGE NUMBER
NUMBER
Bill 8 - Basement SPECIALITIES
Architectural & ID Works Package 8/K 3.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION K - SPECIALITIES (CONT'D)

Parking Accessories

Gate Barrier

Supply and install gate barrier including all necessary


works complete in accordance with the specifications
and drawings

A Gate Barrier 8 No.

Corner Guards

Supply and install rubberized neprene corner guards


including fixing, fittings and all necessary works
complete in accordance with the specifications and
drawings

B1 New - Size: 100 x 100 x 6mm, 1000mm high 187 No.

B2 Repair - Size: 100 x 100 x 6mm, 1000mm high 286 No.

Wheel Stopper

Supply and install precast concrete wheel stopper


including fixing, fittings, paint and all necessary works
complete in accordance with the specifications and
drawings

C1 New - Size: 100 x 100mm 402 m

C2 Repair - Size: 100 x 100mm 448 m

Speed Humps

Supply and install or repair rubberized speed humps


including fixing, fittings, finish and all necessary
works complete in accordance with the specifications
and drawings

D1 New - Speed Humps 9 No.

D2 Repair - Speed Humps 14 No.

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION K PAGE NUMBER
NUMBER
Bill 8 - Basement SPECIALITIES
Architectural & ID Works Package 8/K 4.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION K - SPECIALITIES (CONT'D)

Parking Accessories Cont'd

Kerbs

Precast concrete kerbs including mortar, paint and all


necessary works complete in accordance with the
specifications and drawings

A1 New - All types of Kerbs 433 m

A2 Repair - All types of Kerbs 396 m

Crash Guards

Supply and install or repair crash guards including all


necessary works complete in accordance with the
specifications and drawings

B1 New - To ramps 148 m

B2 Repair - To ramps 584 m

Parking ticket vending machine

Supply and install or repair Parking ticket vending


machine including all necessary works complete in
accordance with the specifications and drawings

C1 New - Parking ticket vending machine 4 No.

C2 Repair - Parking ticket vending machine 10 No.

Guard House

Supply and install Sucurity Kiosk


including all necessary works complete in accordance
with the specifications and drawings

D1 Security Kiosk (replace with removed kiosk) 1 No.

D2 Repair - Security Kiosk 2 No.

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION K PAGE NUMBER
NUMBER
Bill 8 - Basement SPECIALITIES
Architectural & ID Works Package 8/K 5.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION K - SPECIALITIES (CONT'D)

Markings

Supply and apply or repaint road marking including


surface preparing, painting system and all necessary
works complete in accordance with the specifications
and drawings

A1 New - Epoxy Paint Parking Lines 812 m


A2 Repaint - Epoxy Paint Parking Lines 920 m

B1 New - Epoxy Area Painting 213 m2


B2 Repaint - Epoxy Area Painting 600 m2

C1 New - Handicap Marking 4 No.


C2 Repaint - Handicap Marking 5 No.

D1 New - Electric Vehicle Parking Marking 2 No.


D2 Repaint - Electric Vehicle Parking Marking 6 No.

E New - Storage Area Parking 64 m2

F1 New - Arrow Markings 23 No.


F2 Repaint - Arrow Markings 39 No.

G1 New - Zebra Crossing 9 No.


G2 Repaint - Zebra Crossing 9 No.

Supply and install signages and way findings,


including fixing, accessories supports,
anchors/dowels, fittings, finishes and all necessary
works, as per concept design report as required,
complete in accordance with the specifications and
drawings

H Internal Signages & Way findings 1 Item

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION K PAGE NUMBER
NUMBER
Bill 8 - Basement SPECIALITIES
Architectural & ID Works Package 8/K 6.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION K - SPECIALITIES (CONT'D)

Additional items

The tendered is to identify here below any other item


(s) which he may consider applicable yet not given in
the BOQ, quantified and priced, to ensure the
sufficiency and completeness of the Lump Sum Price.
Should the tendered fail to insert any Item(s) here, it
shall be deemed that their lump sum price includes all
items whether shown on the drawings, or implied by
interpretation, or described in the specifications. The
lump sum price shall represent the entire value of the
works and no subsequent claim for any additional
items will be entertained.

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION K PAGE NUMBER
NUMBER
Bill 8 - Basement SPECIALITIES
Architectural & ID Works Package 8/K 7.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION K - SPECIALITIES

Collection

Page 8/K.1 -

Page 8/K.2 -

Page 8/K.3 -

Page 8/K.4 -

Page 8/K.5 -

Page 8/K.6 -

Total to Bill Summary (SAR) -


BILL 8
SECTION L - EQUIPMENT
Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION L PAGE NUMBER
NUMBER
Bill 8 - Basement EQUIPMENT
Architectural & ID Works Package 8/L 1
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION L - EQUIPMENT

N/A

Total to Bill Summary (SAR) N/A


BILL 8
SECTION M - FURNISHINGS
Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION M PAGE NUMBER
NUMBER
Bill 8 - Basement FURNISHINGS
Architectural & ID Works Package 8/M 1.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION M - FURNISHINGS

Supply and installation of furniture including all


accessories, fixings, finishes, decorations and any
other required works complete in accordance with
drawings and specifications

FOH

A IF-213: Bench 15 No.

B IF-700: Planer Pots Combo 16 No.

C IF-701: Planer Pots Combo 16 No.

D IF-702: Planer Pots Combo 16 No.

E IF-705: Custom Bins 28 No.

F IF-707: Planter (Interior) 11 No.

G IF-709: Indoor Planters 20 No.

H Illuminating Advertising 26 No.

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION M PAGE NUMBER
NUMBER
Bill 8 - Basement FURNISHINGS
Architectural & ID Works Package 8/M 2.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION M - FURNISHINGS (CONT'D)

Additional items

The tenderer is to identify here below any other item


(s) which he may consider applicable yet not given in
the BOQ, quantified and priced, to ensure the
sufficiency and completeness of the Lump Sum Price.
Should the tenderer fail to insert any Item(s) here, it
shall be deemed that their lump sum price includes all
items whether shown on the drawings, or implied by
interpretation, or described in the specifications. The
lump sum price shall represent the entire value of the
works and no subsequent claim for any additional
items will be entertained.

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION M PAGE NUMBER
NUMBER
Bill 8 - Basement FURNISHINGS
Architectural & ID Works Package 8/M 3.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION M - FURNISHINGS

Collection

Page 8/M.1 -

Page 8/M.2 -

Total to Bill Summary (SAR) -


BILL 8
SECTION P - CONVEYING SYSTEMS
Renovation and Extension of AL RASHID MALL SECTION P BILL
at Olaya, Al Khobar, KSA PAGE NUMBER
CONVEYING NUMBER
Bill 8 - Basement
SYSTEMS
Architectural & ID Works Package 8/P 1
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION P - CONVEYING SYSTEMS

Elevators & Escalators

Supply and install lifts and escalators including cabins,


motor railing, interior finishes, glazing, control system,
lighting, fixings, all supports, connections, accessories
and all necessary works complete in accordance with
specification and drawings

A ESC-02 2 Nos.

B Escalator - Renovation 2 Nos.

General Items

C Allow for supports inclusive of fixings, anchors, 1 Item


insulating blocks and anti-vibration devices

D Allow for identification plates, discs, labels, charts and 1 Item


color coding

E Allow for testing and commissioning which shall 1 Item


include operating completed installation

F Allow for tools and spares including losses keys 1 Item

G Allow for documents including drawings, operating 1 Item


instructions and maintenance manuals

H Allow for co-ordination with other engineering 1 Item


installations, cutting or forming holes, mortises,
chases or the like and making good finishing, and
building in or cutting and pinning brackets or the like

J Allow for protective and decorative painting, including 1 Item


removing protective coating or wrapping, and cleaning
and polishing exposed surface

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL SECTION P BILL
at Olaya, Al Khobar, KSA PAGE NUMBER
CONVEYING NUMBER
Bill 8 - Basement
SYSTEMS
Architectural & ID Works Package 8/P 2
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION P - CONVEYING SYSTEMS (CONT'D)

Additional items

The tenderer is to identify herebelow any other item (s)


which he may consider applicable yet not given in the
BOQ, quantified and priced, to ensure the sufficiency
and completeness of the Lump Sum Price. Should the
tenderer fail to insert any Item(s) here, it shall be
deemed that their lump sum price includes all items
whether shown on the drawings, or implied by
interpretation, or described in the specifications. The
lump sum price shall represent the entire value of the
works and no subsequent claim for any additional
items will be entertained.

Total to Collection (SAR)


Renovation and Extension of AL RASHID MALL SECTION P BILL
at Olaya, Al Khobar, KSA PAGE NUMBER
CONVEYING NUMBER
Bill 8 - Basement
SYSTEMS
Architectural & ID Works Package 8/P 3
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION P - CONVEYING SYSTEMS

Collection

Page 8/P.1 -

Page 8/P.2 -

Total to Bill Summary (SAR) -


BILL 8
SECTION Q - MECHANICAL WORKS
Renovation and Extension of AL RASHID MALL SECTION Q
BILL
at Olaya, Al Khobar, KSA MECHANICAL PAGE NUMBER
NUMBER
Bill 8 - Basement ENGINEERING
Architectural & ID Works Package INSTALLATIONS 8/Q 1
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION Q - MECHANICAL ENGINEERING INSTALLATIONS

N/A

Total to Bill Summary (SAR) N/A


BILL 8
SECTION R - ELECTRICAL WORKS
Renovation and Extension of AL RASHID MALL SECTION R
BILL
at Olaya, Al Khobar, KSA ELECTRICAL PAGE NUMBER
NUMBER
Bill 8 - Basement ENGINEERING
Architectural & ID Works Package INSTALLATIONS 8/R 1
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION R - ELECTRICAL ENGINEERING INSTALLATIONS

N/A

Total to Bill Summary (SAR) N/A


BILL 8
SUMMARY
Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA BILL 8 PAGE NUMBER
NUMBER
Bill 8 - Basement SUMMARY
Architectural & ID Works Package B8/S 8/S
Item Description Quantity Unit Rate (SAR) Total (SAR)

BILL 8 - SUMMARY

SECTION B - SITE WORKS (DEMOLITION ONLY) -

SECTION C - CONCRETE WORK N/A

SECTION D - MASONRY -

SECTION E - METALWORK -

SECTION F - WOODWORK N/A

SECTION G - THERMAL AND MOISTURE PROTECTION -

SECTION H - DOORS AND WINDOWS -

SECTION J - FINISHES -

SECTION K - SPECIALITIES -

SECTION L - EQUIPMENT N/A

SECTION M - FURNISHINGS -

SECTION P - CONVEYING SYSTEMS -

SECTION Q - MECHANICAL ENGINEERING N/A


INSTALLATIONS

SECTION R - ELECTRICAL ENGINEERING N/A


INSTALLATIONS

Total - Saudi Arabian Riyals..


-