You are on page 1of 56

BILL 7

CARREFOUR AREA
BILL 7
SECTION B - SITE WORKS
Renovation and Extension of AL RASHID MALL BILL
at Olaya, Al Khobar, KSA SECTION B PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area SITEWORK
Architectural & ID Works Package 7/B 1.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION B - SITE WORKS

Demolitions & Alterations

A The works comprise the demolition of existing building


as shown on the drawings disposal of debris to
Municipality approved dump and leaving the area in a
clean and level condition. work to be executed strictly
in such a manner so that existing other structure
should not be disturbed & to the satisfaction of the
Engineer 1 Item

B The Contract includes for obtaining all necessary


NOCs from service authorities and including for the
usage of trucks and disposal of debris 1 Item

C Contractor shall visit the site before submitting his


price and ensure that he allows for all relevant and
required items. This shall include any protection works 1 Item

D Contractor shall ensure that he has current insurances


in accordance with all Municipality regulations. Copies
of these insurances will be required by the Engineer 1 Item

The Demolition works shall include the following

E Demolition of existing Block work (Toilets at level 2) 150 m2

F Demolition of existing Floor Finishes Area (Toilets at level 2) 80 m2

G Demolition of existing Wall Finishes Area (Toilets at level 2) 150 m2

H Demolition of existing Ceiling Finishes Area (Toilets at level 2) 80 m2

Carefully remove the existing Doors and


handover to Client

J Single Doors 9 No.

K Sanitary 8 No.

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL BILL
at Olaya, Al Khobar, KSA SECTION B PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area SITEWORK
Architectural & ID Works Package 7/B 2.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION D - SITE WORKS (CONT'D)

Additional items

The tendered is to identify here below any other item(s)


which he may consider applicable yet not given in
the BOQ, quantified and priced, to ensure the
sufficiency and completeness of the Lump Sum Price.
Should the tendered fail to insert any Item(s) here, it
shall be deemed that their lump sum price includes all
items whether shown on the drawings, or implied by
interpretation, or described in the specifications. The
lump sum price shall represent the entire value of the
works and no subsequent claim for any additional
items will be entertained.

Total to Collection (SAR)


Renovation and Extension of AL RASHID MALL BILL
at Olaya, Al Khobar, KSA SECTION B PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area SITEWORK
Architectural & ID Works Package 7/B 3.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION B - SITE WORKS

Collection

Page 7/B.1 -

Page 7/B.2 -

Total to Bill Summary (SAR) -


BILL 7
SECTION C - CONCRETE WORKS
Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION C PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area CONCRETE
Architectural & ID Works Package 7/C 1
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION C - CONCRETE WORK

N/A

Total to Bill Summary (SAR) N/A


BILL 7
SECTION D - MASONRY WORKS
Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION D PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area MASONRY
Architectural & ID Works Package 7/D 1.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION D - MASONRY

External / Internal Block Works

External/Internal block walls including mortar, lintels,


jambs and sills around the openings, horizontal and
vertical reinforcement, joints, fixing and fitting material,
grouting material, insulation, thermal insulation,
acoustical insulation and all necessary works
complete in accordance with the specifications and
the drawings

A W-02: 250mm CMU 156 m2

B W-03: 200mm CMU 392 m2

C W-05: 100mm CMU 49 m2

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION D PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area MASONRY
Architectural & ID Works Package 7/D 2.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION D - MASONRY (CONT'D)

Additional items

The tendered is to identify here below any other item(s)


which he may consider applicable yet not given in
the BOQ, quantified and priced, to ensure the
sufficiency and completeness of the Lump Sum Price.
Should the tendered fail to insert any Item(s) here, it
shall be deemed that their lump sum price includes all
items whether shown on the drawings, or implied by
interpretation, or described in the specifications. The
lump sum price shall represent the entire value of the
works and no subsequent claim for any additional
items will be entertained.

Total to Collection (SAR)


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION D PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area MASONRY
Architectural & ID Works Package 7/D 3.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION D - MASONRY

Collection

Page 7/D.1 -

Page 7/D.2 -

Total to Bill Summary (SAR) -


BILL 7
SECTION E - METAL WORKS
Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION E PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area METALWORK
Architectural & ID Works Package 7/E 1
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION E - METALWORK

N/A

Total to Bill Summary (SAR) N/A


BILL 7
SECTION F - WOODWORK
Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION F PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area WOODWORK
Architectural & ID Works Package 7/F 1
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION F - WOODWORK

N/A

Total to Bill Summary (SAR) N/A


BILL 7
SECTION G - THERMAL AND MOISTURE PROTECTION
Renovation and Extension of AL RASHID MALL SECTION G
BILL
at Olaya, Al Khobar, KSA THERMAL AND PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area MOISTURE
Architectural & ID Works Package PROTECTION 7/G 1.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION G - THERMAL AND MOISTURE


PROTECTION

Wet Areas Cementitious Waterproofing System

Supply and apply waterproofing system to wet areas


including surface preparation, angle fillet, and all
necessary works including works complete in
accordance with specifications and drawings

A To Floor 57 m2

B To Walls 128 m2

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL SECTION G
BILL
at Olaya, Al Khobar, KSA THERMAL AND PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area MOISTURE
Architectural & ID Works Package PROTECTION 7/G 2.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION G - THERMAL AND MOISTURE


PROTECTION (CONT'D)

Additional items

The tendered is to identify here below any other item(s)


which he may consider applicable yet not given in
the BOQ, quantified and priced, to ensure the
sufficiency and completeness of the Lump Sum Price.
Should the tendered fail to insert any Item(s) here, it
shall be deemed that their lump sum price includes all
items whether shown on the drawings, or implied by
interpretation, or described in the specifications. The
lump sum price shall represent the entire value of the
works and no subsequent claim for any additional
items will be entertained.

Total to Collection (SAR)


Renovation and Extension of AL RASHID MALL SECTION G
BILL
at Olaya, Al Khobar, KSA THERMAL AND PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area MOISTURE
Architectural & ID Works Package PROTECTION 7/G 3.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION G - THERMAL AND MOISTURE


PROTECTION

Collection

Page 7/G.1 -

Page 7/G.2 -

Total to Bill Summary (SAR) -


BILL 7
SECTION H - DOORS AND WINDOWS
Renovation and Extension of AL RASHID MALL SECTION H BILL
at Olaya, Al Khobar, KSA PAGE NUMBER
DOORS AND NUMBER
Bill 7 - Carrefour Area
WINDOWS
Architectural & ID Works Package 7/H 1.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION H - DOORS AND WINDOWS

Doors (FOH)

Supply and install Glass doors including, fire rating,


acoustic (as required), frame, sub frames, architrave,
finishes, glazing works (vision panels as required),
ironmongery, grills, fixing, fittings, accessories and all
necessary works complete in accordance with the
specifications and drawings

A Double Galzed Door 1 No.

Supply and install Wooden doors including, fire rating,


acoustic (as required), frame, sub frames, architrave,
finishes, glazing works (vision panels as required),
ironmongery, grills, fixing, fittings, accessories and all
necessary works complete in accordance with the
specifications and drawings

B Cleaner's Cupboard Door (Size: 900mm wide) 1 No.

C Cleaner's Cupboard Door (Size: 510mm wide) 1 No.

D Toilet Doors (Size: 850mm wide) 5 No.

E Toilet Door (Size: 1250mm wide) 1 No.

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL SECTION H BILL
at Olaya, Al Khobar, KSA PAGE NUMBER
DOORS AND NUMBER
Bill 7 - Carrefour Area
WINDOWS
Architectural & ID Works Package 7/H 2.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION H - DOORS AND WINDOWS (CONT'D)

Glass Handrail (FOH)

Supply and install glass balusters, tempered glass.


including all fixing, fittings, accessories and all
necessary works complete in accordance with the
specifications and drawings

A Glass mounted Handrails (Ref: MT-105 & GL-102) 137 m

B Glass mounted Handrails (Ref: MT-101 & GL-102) 395 m

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL SECTION H BILL
at Olaya, Al Khobar, KSA PAGE NUMBER
DOORS AND NUMBER
Bill 7 - Carrefour Area
WINDOWS
Architectural & ID Works Package 7/H 3.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION H - DOORS AND WINDOWS (CONT'D)

Additional items

The tenderer is to identify here below any other item(s)


which he may consider applicable yet not given in
the BOQ, quantified and priced, to ensure the
sufficiency and completeness of the Lump Sum Price.
Should the tenderer fail to insert any Item(s) here, it
shall be deemed that their lump sum price includes all
items whether shown on the drawings, or implied by
interpretation, or described in the specifications. The
lump sum price shall represent the entire value of the
works and no subsequent claim for any will be
entertained.

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL SECTION H BILL
at Olaya, Al Khobar, KSA PAGE NUMBER
DOORS AND NUMBER
Bill 7 - Carrefour Area
WINDOWS
Architectural & ID Works Package 7/H 4.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION H - DOORS AND WINDOWS

Collection

Page 7/H.1 -

Page 7/H.2 -

Page 7/H.3

Total to Bill Summary (SAR) -


BILL 7
SECTION J - FINISHES
Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION J PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area FINISHES
Architectural & ID Works Package 7/J 1.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION J - FINISHES

FOH Areas (ID)

Backgrounds

Cement Sand Screed

Cement Screed to attain the required finish floor level


including all necessary works complete in accordance
with the specifications and drawings

A To receive Floor Finish 3,514 m2


A To receive Floor Finish 80 m2

Plaster

Cement sand plaster to walls, 15mm thick including


chipping, angle beds, metal lath, plaster stopper and
all necessary works, complete in accordance with
specification and drawings

B To receive Wall Finish 3,532 m2


B To receive Wall Finish 597 m2

C To receive Ceiling Finish 3,702 m2


C To receive Ceiling Finish 80 m2

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION J PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area FINISHES
Architectural & ID Works Package 7/J 2.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION J - FINISHES CONT'D)

Floor Finishes

Supply and install ceramic/porcelain tile including


adhesive and all necessary works complete in
accordance with the specifications and drawings

A Porcelain Pattern Floor (Ref: CT-101) 2,774 m2

B Treads, Ref.CT-101, 300mm wide 41 m

C Risers, Ref.CT-101, 156mm high 41 m

D Landing, Ref.CT-101 7 m2

E Porcelain Stone Effect (Ref: CT-103 47 m2

F Porcelain Wood Tile (Ref: CT-105) 3 m2

Skirting Finish

G Porcelain stone effect (Ref: CT-103) 73 m2

Supply and install granite/marble finish including


adhesive and all necessary works complete in
accordance with the specifications and drawings

H Honed Marble (Ref: ST-105) (300mm wide) 808 m

J Honed Marble (Ref: ST-105) (500mm wide) 339 m

K Honed Carrara Marble (Ref: ST-108) 389 m2 -

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION J PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area FINISHES
Architectural & ID Works Package 7/J 3.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION J - FINISHES CONT'D)

Floor Finishes (cont'd)

Supply and install metal finish strips including all


necessary works complete in accordance with the
specifications and drawings

A Strips (Ref: MT-102) 1,281 m

B Strips (Ref: MT-109) 1,255 m

Threshold

Supply and install thresholds including backing,


adhesive and all necessary works complete in
accordance with the specifications and drawings

C Thresholds 3 m

Vanity

Supply and install vanity counter including fascia,


splash back, supports, cut-out for wash basin, fittings,
fixing accessories, sealant, etc.; and all necessary
works complete in accordance with the specifications
and drawings

D Vanity counter (Ref: SF-101 & MT-104) 6 m

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION J PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area FINISHES
Architectural & ID Works Package 7/J 4.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION J - FINISHES CONT'D)

Wall Finish

Supply and install ceramic/porcelain tile to walls, all


necessary works complete in accordance with the
specifications and drawings

A Porcelain Stone Effect (Ref: CT-102) 194 m2

B Textured Porcelain Tile (Ref: CT-108) 34 m2

C Featured Wall Tile (Ref: CT-113) 20 m2

D Sea Rock Porcelain Tile (Ref: CT-115) 1,760 m2

Supply and install granite/marble finish to walls, all


necessary works complete in accordance with the
specifications and drawings

E Honed Marble (Ref: ST-105) 106 m2

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION J PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area FINISHES
Architectural & ID Works Package 7/J 5.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION J - FINISHES CONT'D)

Wall Finish (cont'd)

Supply and install paint finish to walls, all necessary


works complete in accordance with the specifications
and drawings

A Matt Paint (Ref: PT-103) 739 m2

Supply and install wood cladding panels including


frame, support, fixing, fittings, accessories and all
necessary works complete in accordance with the
specifications and drawings

B Wood finish (Ref. WD-102) 20 m2

C Wood finish (Ref. WD-102), curved, including metal strip 659 m2

Supply and install metal finish including accessories and


all necessary works complete in accordance with the
specifications and drawings

D Metal finish (Ref.MT-101) 2 m2

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION J PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area FINISHES
Architectural & ID Works Package 7/J 6.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION J - FINISHES CONT'D)

Ceiling Finishes

Supply and install gypsum board suspended ceiling


including fixing, supports, frames, and all necessary
works complete in accordance with the specifications
and drawings

A Gypsum board 3,584 m2


A Gypsum board ceiling (Toilet at level 1) 80 m2

B Bulkhead, 150mm high 631 m

C Bulkhead, 300mm high 57 m

D Bulkhead 137 m2

E Lightcove, 150mm girth 631 m

F Extra over for forming curved edges 58 m

Supply and install special finish suspended ceiling


including fixing, supports, frames, suspension system
and all necessary works complete in accordance with
the specifications and drawings

G Wood finish (Ref. WD-101) 118 m2

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION J PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area FINISHES
Architectural & ID Works Package 7/J 7.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION J - FINISHES CONT'D)

Ceiling Finishes (cont'd)

Supply and install paint including all necessary works


complete in accordance with the specifications and
drawings

A Paint to ceiling, (Ref: PT - 103) 3,927 m2


A Paint to ceiling, (Ref: PT - 103) 80 m2

Supply and install metal finish including all necessary


works complete in accordance with the specifications
and drawings

B MT-105 5 m

C MT-108 480 m

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION J PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area FINISHES
Architectural & ID Works Package 7/J 8.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION J - FINISHES CONT'D)

External Finishes

Supply and install Exterior Facade Glazing with all


necessary works complete in accordance with the
specifications and drawings

A Stick System Glazed, Polyester Powder Coated


Aluminium Curtain System (Ref: 03) 27 m2

B Stick System Glazed, Polyester Powder Coated


Aluminium Curtain System, Ceramic Fritted Glazing
(Ref: 23) 39 m2

Supply and install Cladding Wall System, including


thermal insulation (if required), all necessary works
complete in accordance with the specifications and
drawings

C Mechanically fixed Granite Honed Finish Stone


Cladding (Ref: 15) 508 m2

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION J PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area FINISHES
Architectural & ID Works Package 7/J 9.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION J - FINISHES CONT'D)

Additional items

The tendered is to identify here below any other item


(s) which he may consider applicable yet not given in
the BOQ, quantified and priced, to ensure the
sufficiency and completeness of the Lump Sum Price.
Should the tendered fail to insert any Item(s) here, it
shall be deemed that their lump sum price includes all
items whether shown on the drawings, or implied by
interpretation, or described in the specifications. The
lump sum price shall represent the entire value of the
works and no subsequent claim for any additional
items will be entertained.

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION J PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area FINISHES
Architectural & ID Works Package 7/J 10.00
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION J - FINISHES

Collection

Page 7/J.1 -

Page 7/J.2 -

Page 7/J.3 -

Page 7/J.4 -

Page 7/J.5 -

Page 7/J.6 -

Page 7/J.7

Page 7/J.8

Page 7/J.9

Total to Bill Summary (SAR) -


BILL 7
SECTION K - SPECIALITIES
Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION K PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area SPECIALITIES
Architectural & ID Works Package 7/K 1
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION K - SPECIALITIES

Toilet accessories, including fixing, fittings,


accessories and all necessary works complete in
accordance with the specifications and drawings

FOH

A SW-100: BACK TO WALL WC 3 No.

B SW-101: CONCEALED CISTERN 6 No.

C SW-102: SHATTAF WATER SPRAY 6 No.

D SW-103: FLOOR DRAIN 10 No.

E SW-104: SENSOR FAUCET 5 No.

F SW-105: SENSOR FLUSH PLATE 5 No.

G SW-106: SQUAT TOILET 2 No.

H SW-107: ACCESSIBLE WC 1 No.

J SW-108: ACCESSIBLE WASH BASIN 1 No.

K SW-109: ACCESSIBLE SENSOR FAUCET 1 No.

L SW-110: JANITOR SINK 2 No.

M SW-111: JANITOR FAUCET 2 No.

Total to Collection (SAR) 0.00


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION K PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area SPECIALITIES
Architectural & ID Works Package 7/K 2
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION K - SPECIALITIES (CONT'D)

Toilet Accessories (Cont'd)

FOH (cont'd)

A SA-100: MIRROR 1 No.

B SA-101: ROLL HOLDER 5 No.

C SA-102: ROBE HOOK 5 No.

D SA-104: ANGLE GRAB BAR 1 No.

E SA-105: DROP BAR 1 No.

F SA-106: CONCEALED SOAP DISPENSER 5 No.

G SA-107: 3 IN 1 COMBO DRYER/DISPENSER 2 No.

H SA-108: EMERGENCY PULL SYSTEM 1 No.

J SA-109: SOAP DISPENSER 1 No.

K SA-110: GRAB RAIL 1 No.

L SA-111: PAPER DISPENSER 1 No.

M SA-509: WASTE BIN 6 No.

Supply and install mirrors including fixing backing,


frames, fixing, fittings, accessories and all necessary
works complete in accordance with the specifications
and drawings

N Mirrors 5 No.

Total to Collection (SAR) 0.00


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION K PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area SPECIALITIES
Architectural & ID Works Package 7/K 3
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION K - SPECIALITIES (CONT'D)

Signage and Way findings

Supply and install signages and way findings,


including fixing, accessories supports,
anchors/dowels, fittings, finishes and all necessary
works, as per concept design report as required,
complete in accordance with the specifications and
drawings

A Internal Signages & Way findings 1 Item

External Signages

Supply and install External Signage System all


necessary works complete in accordance with the
specifications and drawings

B External Signages & Way findings 1 Item

Total to Collection (SAR) 0.00


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION K PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area SPECIALITIES
Architectural & ID Works Package 7/K 4
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION K - SPECIALITIES (CONT'D)

Additional items

The tendered is to identify here below any other item


(s) which he may consider applicable yet not given in
the BOQ, quantified and priced, to ensure the
sufficiency and completeness of the Lump Sum Price.
Should the tendered fail to insert any Item(s) here, it
shall be deemed that their lump sum price includes all
items whether shown on the drawings, or implied by
interpretation, or described in the specifications. The
lump sum price shall represent the entire value of the
works and no subsequent claim for any additional
items will be entertained.

Total to Collection (SAR)


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION K PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area SPECIALITIES
Architectural & ID Works Package 7/K 5
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION K - SPECIALITIES

Collection

Page 7/K.1

Page 7/K.2

Page 7/K.3

Page 7/K.4

Total to Bill Summary (SAR) 0.00


BILL 7
SECTION L - EQUIPMENT
Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION L PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area EQUIPMENT
Architectural & ID Works Package 7/L 1
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION L - EQUIPMENT

N/A

Total to Bill Summary (SAR) N/A


BILL 7
SECTION M - FURNISHINGS
Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION M PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area FURNISHINGS
Architectural & ID Works Package 7/M 1
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION M - FURNISHINGS

Supply and installation of furniture including all


accessories, fixings, finishes, decorations and any
other required works complete in accordance with
drawings and specifications

FOH

A IF 105: AREA RUG 1 No. 0.00

B IF-213: BENCH 4 No. 0.00

C IF-221: SOFA 2 No. 0.00

D IF-222: ARM CHAIR 4 No. 0.00

E IF-512: FLOOR LAMP 2 No. 0.00

F IF-705: CUSTOM BINS 26 No. 0.00

G IF-707: PLANTER (INTERIOR) 10 No. 0.00

H IF-709: INDOOR PLANTERS 42 No. 0.00

J Illuminating Advertising 14 No. 0.00

Total to Collection (SAR) -


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION M PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area FURNISHINGS
Architectural & ID Works Package 7/M 2
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION M - FURNISHINGS (CONT'D)

Additional items

The tenderer is to identify here below any other item


(s) which he may consider applicable yet not given in
the BOQ, quantified and priced, to ensure the
sufficiency and completeness of the Lump Sum Price.
Should the tenderer fail to insert any Item(s) here, it
shall be deemed that their lump sum price includes all
items whether shown on the drawings, or implied by
interpretation, or described in the specifications. The
lump sum price shall represent the entire value of the
works and no subsequent claim for any additional
items will be entertained.

Total to Collection (SAR)


Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA SECTION M PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area FURNISHINGS
Architectural & ID Works Package 7/M 3
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION M - FURNISHINGS

Collection

Page 7/M.1 -

Page 7/M.2 -

Total to Bill Summary (SAR) -


BILL 7
SECTION P - CONVEYING SYSTEMS
Renovation and Extension of AL RASHID MALL SECTION P BILL
at Olaya, Al Khobar, KSA PAGE NUMBER
CONVEYING NUMBER
Bill 7 - Carrefour Area
SYSTEMS
Architectural & ID Works Package 7/P 1
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION P - CONVEYING SYSTEMS

N/A

Total to Bill Summary (SAR) N/A


BILL 7
SECTION Q - MECHANICAL WORKS
Renovation and Extension of AL RASHID MALL SECTION Q
BILL
at Olaya, Al Khobar, KSA MECHANICAL PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area ENGINEERING
Architectural & ID Works Package INSTALLATIONS 7/Q 1
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION Q - MECHANICAL ENGINEERING INSTALLATIONS

N/A

Total to Bill Summary (SAR) N/A


BILL 7
SECTION R - ELECTRICAL WORKS
Renovation and Extension of AL RASHID MALL SECTION R
BILL
at Olaya, Al Khobar, KSA ELECTRICAL PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area ENGINEERING
Architectural & ID Works Package INSTALLATIONS 7/R 1
Item Description Quantity Unit Rate (SAR) Total (SAR)

SECTION R - ELECTRICAL ENGINEERING INSTALLATIONS

N/A

Total to Bill Summary (SAR) N/A


BILL 7
SUMMARY
Renovation and Extension of AL RASHID MALL
BILL
at Olaya, Al Khobar, KSA BILL 7 PAGE NUMBER
NUMBER
Bill 7 - Carrefour Area SUMMARY
Architectural & ID Works Package B7/S 7/S
Item Description Quantity Unit Rate (SAR) Total (SAR)

BILL 7 - SUMMARY

SECTION B - SITE WORKS (DEMOLITION ONLY) -

SECTION C - CONCRETE WORK N/A

SECTION D - MASONRY -

SECTION E - METALWORK N/A

SECTION F - WOODWORK N/A

SECTION G - THERMAL AND MOISTURE PROTECTION -

SECTION H - DOORS AND WINDOWS -

SECTION J - FINISHES -

SECTION K - SPECIALITIES -

SECTION L - EQUIPMENT N/A

SECTION M - FURNISHINGS -

SECTION P - CONVEYING SYSTEMS N/A

SECTION Q - MECHANICAL ENGINEERING N/A


INSTALLATIONS

SECTION R - ELECTRICAL ENGINEERING N/A


INSTALLATIONS

Total - Saudi Arabian Riyals..


-
Carried to Collection..