Professional Documents
Culture Documents
HULU MAHAKAM PECIKO 8B
SURFACE FACILITIES MODIFICATION AND BOOSTER COMPRESSOR INSTALATION
Project : PERTAMINA HULU MAHAKAM PECIKO 8BSURFACE FACILITIES MODIFICATION AND BOOSTER COMPRESSOR INSTALATION
Desciption : WEEKLY REJECTION RATE
Previous Weeks This Week
Cumulative
12‐Dec‐22 to 26‐Feb‐23 27‐Feb‐23 to 5‐Mar‐23
NO Welder Name Welder ID Has Been Has Been Has Been Remark
Repair Repair Repair
Welded Repair Rate (%) Welded Repair Rate (%) Welded Repair Rate (%)
(Film) (Film) (Film) (Film) (Film) (Film)
1 NASRIADI AR‐02 48.00 ‐ 0.00% 20.00 ‐ 0.00% 68.00 ‐ 0.00%
2 RUSLAN AR‐05 46.00 ‐ 0.00% 24.00 ‐ 0.00% 70.00 ‐ 0.00%
3 WAHYU NUGROHO AR‐30 34.00 ‐ 0.00% ‐ ‐ 0.00% 34.00 ‐ 0.00%
4 SAMSIR AR‐36 321.00 2.00 0.62% 24.00 ‐ 0.00% 345.00 2.00 0.58%
5 SUAIB AR‐29 331.00 ‐ 0.00% 36.00 1.00 2.78% 367.00 1.00 0.27%
6 GILANG AR‐40 17.00 ‐ 0.00% ‐ ‐ 0.00% 17.00 ‐ 0.00%
7 JANUARDY AR‐38 87.00 ‐ 0.00% ‐ ‐ 0.00% 87.00 ‐ 0.00%
8 HERMAN LIGSON AR‐27 266.00 ‐ 0.00% ‐ ‐ 0.00% 266.00 ‐ 0.00%
9 SELAMAT. R AR‐07 24.00 ‐ 0.00% 44.00 2.00 4.55% 68.00 2.00 2.94%
10 ABDUL RAHMAN AR‐08 16.00 ‐ 0.00% 36.00 4.00 11.11% 52.00 4.00 7.69%
11 JAMAL AR‐17 8.00 ‐ 0.00% 20.00 4.00 20.00% 28.00 4.00 14.29%
Total 1,198.00 2.00 0.17% 204.00 11.00 5.39% 1,402.00 13.00 0.93%
Note :
Prepared by, Reviewd by, Reviewed by,
Nurhasanah Haryadi. M
PT. ASTA REKAYASA UNGGUL PT. ASTA REKAYASA UNGGUL PERTAMINA HULU MAHAKAM