You are on page 1of 1

CLASSROOM 1 OFFICE LIFT LOBBY 1 General notes:

1. All legends are to be read in


H J K L conjunction with other tender
2 documents including but not limited to
A-FF01 10000 10000 10000 10000
MEP and builders work drawings,
specifications and schedules. GC to
inform the Architect of any
descrepancies for clarifications prior to
procurements.
D11 7 2. All existing items at the premises,
unless noted otherwise, are to remain
F3a
FE F4 and to be protected. GC is to discuss
RF1 RF1 and agree all existing items to be
demolished prior to demolition.
3. Make good any damage and level the
FE
existing floor slab as required to
receive the new raised floor system
RF1
and new floor finish, typical.
F2b
4. Provide 3mm grade 316 s.steel strip at
transition of different types of floor
finishes, e.g from carpet to tile.

9500
5. Exact floor pattern and setting out to
DE2 be confirmed on site with Architect.
FE
6. Provide screeding as necessary to
CCTV Room
RF1 RF1 RF1 F2a ensure same FFL for all site areas.
F3a F2b F2b RF1 7. Screeding and finishes at the toilets
D11 RF1 F4
F3b are to lay to fall to floor drains typical.
AV
D3
F4
EXIT 8. All material to be as per the latest
F2a F2a cabinet F2a F2b D2 HR provisions required in Building

F
MCB RF2 New
HR D12 FE
D5 D4 D4 RF1 Regulations / Lingnan / M+
D10 F2a 12/F STAIR requirements.
F2a
F2a F1 F4 LOBBY
RF1 RF1 RF1

F2a RF1 s.steel threshold (black TBC) with


TYP to all MCB at corridor 12F ELV RM
substrate as required to ensure new
Provide continuous perimeter finishes are leveled and flushed with
curbs under raised floor with adjacent flooring
waterproofing to wrap up min.
50mm from the SFL. Refer to
1
-
12/F Floor Finishes & Door marks Plan the Technical Specifications
1:100 @A2 for watertightness test
requirements. Exact area
TBC

12F Floor Plan for Floor


Finish & Door Marks

1:100

A-FF02

You might also like