You are on page 1of 1

Create by : Mayuree W.

BONGKOT FIELD
BONGKOT DEVELOPMENT
FIELD PROJECT- - PHASE
PROJECT
DEVELOPMENT PHASE3G
3H4A
CONTRACT NO. PDW-07-0339
WELLHEAD PLATFORMS WP23, DEVELOPMENT
WP24 AND WP25PROJECT
AND WELLHEAD PLATFORMS WPS1, 2, 3,
4, 5 AND 6, AND THEIR ASSOCIATED PIPELINE AND FACILITIES
WELLHEAD PLATFORM WP21-WP22, ASSOCIATED SEALINES AND FACILITIES
FINAL DOCUMENTATION MASTER INDEX Create by : Mayuree W.

1. PART A - ENGINEERING DOSSIER - PLATFORM ENGINEERING (BONGKOT PHASE 4A)


2. PART B - ENGINEERING DOSSIER - SEALINE ENGINEERING (BONGKOT 4A)
BOOK COMMON SEALINE ENGINEERING - GENERAL
Section 1 Design Report (General)
BOOK 1 WPS2-PPS SEALINE ENGINEERING
Section 1 Design Report
BOOK 2 WPS3-PPS SEALINE ENGINEERING
Section 1 Design Report
BOOK 3 WPS4-PPS SEALINE ENGINEERING
Section 1 Design Report
BOOK 4 WPS5-PPS SEALINE ENGINEERING
Section 1 Design Report
BOOK 5 WPS6-WPS3 SEALINE ENGINEERING
Section 1 Design Report
BOOK 6 8" Sealine & FSO PLEM Engineering
Section 1 Design Report
BOOK COMMON 1 SEALINE ENGINEERING PROCEDURE (COMMON)
Section 1 Project Particular Specification
BOOK 7 SEALINE ENGINEERING DRAWINGS WPS2 - PPS
Section 1 General
Section 2 Sealine
Section 3 MTO's
BOOK 8 SEALINE ENGINEERING DRAWINGS WPS3 - PPS
Section 1 General
Section 2 Sealine
Section 3 MTO's
BOOK 9 SEALINE ENGINEERING DRAWINGS WPS4 - PPS
Section 1 General
Section 2 Sealine
Section 3 MTO's
BOOK 10 SEALINE ENGINEERING DRAWINGS WPS5 - PPS
Section 1 General
Section 2 Sealine
Section 3 MTO's
BOOK 11 SEALINE ENGINEERING DRAWINGS WPS6 - WPS3
Section 1 General
Section 2 Sealine
Section 3 MTO's
BOOK 12 Sealine Engineering Drawings 8" Sealine & FSO PLEM
Section 1 General
Section 2 Sealine
Section 3 MTO's
BOOK COMMON 2 SEALINE DATA SHEETS
Section 1 Data Sheets
3. PART C - ENGINEERING DOSSIER WP7, WP11 & WP22 TIE-IN AND ASSOCIATED MODI. (Existing Platforms)
4. PART D - AS BUILT DOSSIER (New Platforms), Bongkot Phase 4A
5. PART E - AS BUILT DOSSIER (SEALINE AS-BUILT AND SURVEY REPORT), Bongkot Phase 4A
6. PART F - AS BUILT DOSSIER TIE-IN AND ASSOCIATED MODIFICATION AS-BUILT DRAWINGS
7. PART G - VENDOR DOSSIER GENERAL
8. PART H - QUALITY ASSURANCE DOSSIER LOT 1
9. PART I - QUALITY ASSURANCE DOSSIER OFFSHORE WORK (Sealine & Associated Fabrication)
10. PART J - QUALITY ASSURANCE DOSSIER (Existing Platforms)
11. PART K - CLOSE OUT REPORTS AND CA DOSSIER
12. PART L - PRE-COMMISSIONING DOSSIER (Bongkot South Phase 4A)
(FINAL DOCUMENTATION DVD-ROM (PDF FORMAT)
BOOKMARKS : Final Documentation - Part B (1 DVD)

You might also like