Professional Documents
Culture Documents
SUB TOTAL 1
SUB TOTAL 6
SUB TOTAL 6
SUB TOTAL 8
ELEMENT No.9 WINDOWS
FABRICATION AND INSTALLATION OF SM 552 45,000.00
ALUMINIUM WINDOWS
1
FABRICATION AND INSTALLATION OF Nr 0 30,000.00
WINDOW GRILLS
2
SUB TOTAL 5
ELEMENT No.7 FINISHINGS
1 PLASTER WORKS m2 5480 2,835.00
2 INSTALLATION OF FLOOR TILES m2 1632 10,000.00
3 SKIRTING, TREADS, RISERS m 770 4,000.00
4 INSTALLATION OF WALL TILES m2 47.1 14,000.00
5 ROUGH FLOORING m2 1632 4,375.00
6 ROUGH WALL BED FOR WALL TILES m2 47.1 2,690.00
7 BRANDERING m 0 1,500.00
8 LAYING OF GYPSUM BOARDS AND PVC m2 0 5,250.00
9 EDGE CORNICE AND CORNERS m 0 1,500.00
SUB TOTAL 7
SUB TOTAL 8
SUB TOTAL 9
SUB TOTAL 10
ELEMENT No.11 PROVISIONAL SUMS
SUB TOTAL 11
0.00
0.00
1,500,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
414,212.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,914,212.03
0.00
0.00
605,000.00
0.00
1,250,350.00
0.00
0.00
490,000.00
0.00
70,000.00
0.00
0.00
0.00
2,415,350.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#VALUE!
13,652,660.00
240,000.00
0.00
0.00
0.00
0.00
13,892,660.00
10,762,500.00
1,161,300.00
0.00
1,472,500.00
13,396,300.00
0.00
0.00
0.00
280,000.00
350,000.00
630,000.00
840,000.00
420,000.00
1,050,000.00
4,050,000.00
899,001.00
5,223,750.00
12,482,751.00
24,840,000.00
24,840,000.00
15,535,800.00
16,320,000.00
3,080,000.00
659,400.00
7,140,000.00
126,699.00
-
-
-
42,861,899.00
12,838,000.00
6,177,500.00
-
-
19,015,500.00
2,750,000.00
10,800,000.00
3,000,000.00
16,550,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#VALUE!