Professional Documents
Culture Documents
DOCUMENT TITLE : PILE FOUNDATION DESIGN FOR DUCT SUPPORTING PLATFORM NEAR DISENGAGING DRUM
INDEX
SR.NO. TITLE PAGE NO.
1 INTRODUCTION 3
2 SCOPE 3
DOCUMENT TITLE : PILE FOUNDATION DESIGN FOR DUCT SUPPORTING PLATFORM NEAR DISENGAGING DRUM
1 INTRODUCTION
Mangalore Refinery and Petrochemicals Limited (MRPL), a subsidiary of Oil and Natural Gas Corporation Limited has set up Petrochemical
Fluidized Catalytic Cracking Unit (PFCC) .
PFCC flue gas handling system is designed for recovering the catalyst fines in flue gas and to meet suspended particle matter emission limit
of 50mg/Nm3 at stack.
MRPL intends to install Flue gas wet scrubbing system (WSS) to reduce suspended particulate matter in flue gas to 20 mg/Nm3 dry basis or
less with provision to further reduce the SPM level upto 10mg/Nm3.
2 SCROPE
This document is in continuation with Document no. 5083-CVS-WSS-ED0001. Scope of this documents is to provide Pile Foundation Design
of Duct supporting platform near Disengaging drum. For Pile foundation design refer Annexure-01
Duct supporting platform near Disengaging Drum is a 7.1 meter hight structure, above FGL. Pile foundation of 1.0m Thick Pile Cap is
provided at 2.5 m depth from HPP EL 100.000. RCC Pedestals size 1.0m x 1.0m , provided upto 2.5 m above HPP, to take care of the
Fireproofing requirements. Tie beam is provided at top of pedestal in both direction
PFCC UNIT FLUE GAS WET SCRUBBER SYSTEM
DOCUMENT TITLE : PILE FOUNDATION DESIGN FOR DUCT SUPPORTING PLATFORM NEAR DISENGAGING DRUM
Structure modelled in staad pro with steel buitup sections for main column and main beam and Indian standard sections for other
beams and bracings. Rcc pedestals and Rcc beams modelled and designed in staad pro as per IS 13920. To design Pile
foundation,Pile cap modelled in staad pro as a plate element, thickness of pile cap assinged is 1. meter. Pile assiged as a spring at
each pile locations in model.
DOCUMENT TITLE : PILE FOUNDATION DESIGN FOR DUCT SUPPORTING PLATFORM NEAR DISENGAGING DRUM
Concrete
Design Comp. Strength Fck = 30 N/mm2
Reinforcement Steel
Yield Strength of Steel Fy = 500 N/mm2
Structural Steel
Ultimate Strength of Steel Fu = 410 N/mm2
Section modifier factor fok column crack section = 0.7 Ig ( As per IS 1893 )
Section modifier factor fok beam crack section = 0.35 Ig ( As per IS 1893 )
PFCC UNIT FLUE GAS WET SCRUBBER SYSTEM
DOCUMENT TITLE : PILE FOUNDATION DESIGN FOR DUCT SUPPORTING PLATFORM NEAR DISENGAGING DRUM
DOCUMENT TITLE : PILE FOUNDATION DESIGN FOR DUCT SUPPORTING PLATFORM NEAR DISENGAGING DRUM
DOCUMENT TITLE : PILE FOUNDATION DESIGN FOR DUCT SUPPORTING PLATFORM NEAR DISENGAGING DRUM
Dead load case shall cover the self weight of steel structure, Rcc structure (Rcc beam, column, bracing and raft), grating load, handrail load
staircase dead load and Electrical and Instrumentation load. The software automatically calculates the self weight of each modelled components
as per density and sectional properties. Factor 1.1 used for weight of gusset plates, anchor bolt, conncetion bolts etc.
Live Load on Platform = 5 Kn/m2 ( As per Design Basis ) (Live load applied as u.d.l on supporting
beam)
Thermal Load applied, 30% of pipe operating load in longitudinal and transverse direction and 10% for pipe which support on spring with teflon
pad.
Cyclonic factor k4 = 1
DOCUMENT TITLE : PILE FOUNDATION DESIGN FOR DUCT SUPPORTING PLATFORM NEAR DISENGAGING DRUM
Shape factor for wind = 1.7 (for star column as per IS875 Part3 Table-32)
8.5 / 8.5 = 1
DOCUMENT TITLE : PILE FOUNDATION DESIGN FOR DUCT SUPPORTING PLATFORM NEAR DISENGAGING DRUM
DOCUMENT TITLE : PILE FOUNDATION DESIGN FOR DUCT SUPPORTING PLATFORM NEAR DISENGAGING DRUM
Cf factor for main structure in X-dir = 1.70 (for star column as per IS875 Part3 Table-29)
Cf factor for main structure in -X -dir = 1.70 (for star column as per IS875 Part3 Table-29)
Cf factor for main structure in Z & -Z-dir = 1.70 (for star column as per IS875 Part3 Table-29)
The site is located in Zone – III of seismic zoning map of india as per IS 1893 for which parameter are as follows:
Damping = 0.02
DOCUMENT TITLE : PILE FOUNDATION DESIGN FOR DUCT SUPPORTING PLATFORM NEAR DISENGAGING DRUM
Comparision between IS Code Response Spectrum v/s Site Response Spectrum Seismic Results
IS Code Response Spectrum
Dynamic Weight = 25499.18 kn
Base Shear = 1491.37 kn
Note: For seismic analysis , Site specific spectrum and IS code response spectrum used, in both case , IS code response spectrum
shows higher seismic base shear, hence IS 1893 response spectrum used for design purpose.
Load combination for check of soil bearing pressure & stability of foundation and Serviceability check
DL + EE + PE
Erection
DL + EE + PE + WL
PFCC UNIT FLUE GAS WET SCRUBBER SYSTEM
DOCUMENT TITLE : PILE FOUNDATION DESIGN FOR DUCT SUPPORTING PLATFORM NEAR DISENGAGING DRUM
DL + EE + PE
DL + EE + PE + BP
DL + EE + PE + ML + OL
Empty
DL + EE + PE + RL
DL + EE + PE + RL + WL
DL + EE + PE + SL
DL + EO + PO + TA + TL
DL + IL + EO + PO + TA + TL
DL + IL + EO + PO + BP + TA + TL
DL + EO + PO + RL + TA + TL
Operating DL + IL + EO + PO + ML + OL + TA + TL
DL + EO + PO + RL + TA + WL
DL + IL + EO + PO + TA + WL
DL + EO + PO + TA + SL
DL + IL + EO + PO + TA + SL
DL + ET + PT
DL + ET + PT + ML + OL
Test DL + ET + PT + IL
DL + ET + PT + 0.25 WL
DL + ET + PT + IL + (0.25 WL)
Load combination for Foundation Reinforcement Design & R.C.C. / Steel Structure Member Design
1.5 (DL + EE + PE )
Erection 1.5 (DL + EE + PE) + 1.5 WL
0.9 (DL + EE + PE) + 1.5 WL
1.5 (DL + EE + PE )
1.5 (DL + EE + PE + BP )
1.5 (DL + EE + PE + ML + OL )
1.5 (DL + EE + PE + RL )
Empty 1.5 (DL + EE + PE) + 1.5 WL
0.9 (DL + EE + PE) + 1.5 WL
1.5 (DL + EE + PE) + 1.5 SL
0.9 (DL + EE + PE) + 1.5 SL
DL + IL + EE + PE + NL
1.5 (DL + IL + EO + PO + TA + TL)
1.5 (DL + IL + EO + PO + RL + TA + TL)
1.5 (DL + IL + EO + PO + ML + OL + TA + TL)
1.2 (DL + IL + EO + PO + TA) + 1.2WL
Operating 1.5 (DL + EO + PO + TA) + 1.5WL
0.9 (DL + EO + PO ) + 1.5TA + 1.5WL
1.2 (DL + 0.5IL + EO + PO + TA) + 1.2SL
1.5 (DL + EO + PO + TA) + 1.5SL
0.9 (DL + EO + PO ) + 1.5TA + 1.5SL
DOCUMENT TITLE : PILE FOUNDATION DESIGN FOR DUCT SUPPORTING PLATFORM NEAR DISENGAGING DRUM