You are on page 1of 4

ARKA JAIN

JG University
Jharkhand

Department of Engineering
(Diploma)

ASSIGNMENT NO. - 03

NAME: Suua SinghMunda


ENROLLAIENT NO:- Asuloi319
ROLL.NO :
BRANCH:
Pol /EEE
SEMESTER :-
yh
SECTION: A
SUBJECT:ETEa
SUBMITTED T0:

oy loqles
DATE: FACUY YESrig?
dSsteNMEN-
toing at
vaus the 03
induckon manh% ahd eloctieal
mochints

fundai
fandaon adddloask,
iudlok.

Malig he mates nad e intaulaton.


( Installaton af the Mato/madlnes and he dhien
mackne, aligmost at shatto.

Contv cables.

IX) checks, destson mote. &torer and ausodaded equúpat.


iakon,noJoad un wnde eloge
subenision.

aves
to Cattomes

and ghehvonouá wmachines asáng in cliumandled condtlion


at stfe

sOMout ad lae heset plate and the Jbeaning podes

EMout the machinentor and


shat at he associded machies aens instaed.
the edestad,indhodca
Jeasing
and e-iatla! he being pedaal.
neor
te to the slho
cheok
he stador ke
tpes mgunting.
qomaining pads at the maoline,
Jstall he
08. Erplain he piocedune a ingpeclion d
anelect Macine
ie to ik instalaton.
ngecion ef mack ines tor ondion,
|As:Sroo
Tnuecion et uinding Jends gens, benslngs,
sh comd

dtheubicaon.
ot antibickon beaings and check the amou
69 Upen ing
of besting ubricotion.
. Measusement at eleances between thebeaing hub and
Jouwena meahs cb a
keelat,gage.
the shat
. Reutatance measuemet at stator aund retor
Tnsatin
anding means aba mgge
CD:C Inuakon Teste).

o checking ot the ator tor


asy vatahen ushen
nat
tned
brushagainst he
JhandCsl that the rotor tan mut
PNd shields caps.
3) at the machine uoin ding s and ather pats
Blouing
aeah dy a to remove oldt.
uth
Rectitcotien at mina delects abserved din? he
ispection.
O4 Explain
madhine
the procedune
dispdd,
at dibmartling at a fange retating
in kdy assenblt concliAOR.
0This Lock out souece and nelieves rei
pouser
al
ineludes
dual chges.
ansuig dht all electicahydaulic
Pneomatie system qye isdlatecd and de -enesjzes say ness dwal
charges uch as those atored
geeased.
in capacitos, mualWbe
Rascanble;- Once nachinehas een dismanttedit can
he

beneasobles chollouingthe Same step in neverse


ONSe
63
un-locktetun- And updoda crauings, Atde the machine
has been meassembled, if shouwd beun loled
anddested to ensure hat so oprating
correct.The as
buit deauig should aso be updatad etec thechange
thet oee made ding the dismanting Process.
o
O9 Wen pessona petecive qutpnet CPee) such al
glsses, hahd hatand gloves.
s shanes move
Oseneag ikbig equipmet,such
Comoneit
and for kiAs.o

C) Disconnect aud al
electical usies aud cables.
pipose at hazardous mtonialk prope.
6
O5 Stode 93.
the
Naios
machine
diamated intal aon
teps in a Jarge matoinp
a

Ansi conion.
Installeion ak Bed-plate
andhe Jeueligg of the bed-plade.
Tnta! dion the Beaiing-edesta
et
ot
and Jeveling the
beasing -ped astads.
eaks on tato
aud Rotor.
Assermay ot the rator on to heshalt.
(5) Intallation et stobaz.
Irstatlation therotorin the steta
checking et the agas betseen sttor nd.
Intadton et he diven or dive maeline is similas
-foeshion.
9 eparction as shakt couplíngs.
|0Mowting the shatt coutling on shat.
qnmet et shat.
A

(D Pseparaion t shatt and


6
Iatallation at cobEnggtem.
aging ut.
Teatrg
Comyt
15)

You might also like