You are on page 1of 2

TECHNICAL BULLETIN

Ref: TB 114

Author : V.Cotty Signature : Date : 07/12/2015

Validation: O.Monnier Signature : Date: 07/12/2015

For:
IMMEDIATE ACTION 
ACTION
UPDATE
INFORMATION

Section

Model: DREW D3 1

Information: Tubing 14 Update For New Counting Manifold Installation 2

Action: Installation of New Tubing 14 3

Send by BIT C2 Diagnostics to: Raffaele_gismondi@erbadiagnostics.com


Philip_phan@erbadiagnostics.com

Contacts: Contact BIT C2 DIAGNOSTICS for further information.

Information feedback asked by BIT C2 DIAGNOSTICS


To inform BIT C2 DIAGNOSTICS of the incidents relating to this document.

ForBulletinTech Copyright© BIT C2 diagnostics. All Rights Reserved. Page 1/2


Version 03
1 MODEL

DREW D3 equipped with new counting manifold

2 INFORMATION

You received previously TB106 about the new counting manifold design installation in manufacturing
and shipped as spare part. This technical bulletin specifies that new counting manifold design is
totally compatible with the previous one and can be installed freely on D3 instruments.

It turns out that TB106 is wrong, new counting manifold design is not directly compatible with the
previous one. It requires additionally the replacement of the current tubing #14 by a new one from
different dimensions.

New tubing #14: Tygon 2x4mm; length 270mm

3 ACTION

In order to prevent any issue, please replace the current tubing #14 by the new one when you
install the new counting manifold on your instrument.

ForBulletinTech Copyright© BIT C2 diagnostics. All Rights Reserved. Page 2/2


Version 03

You might also like