This document outlines the weekly plan for the main contract from July 18-24. It details 7 tasks in area A related to excavation, concrete pouring, and manhole work to be overseen by Mr. Alvin. Area B outlines 9 sewage, canteen and masjid area tasks including wall casting, excavation and installation work to be led by Mr. Suprapto. The 5 tasks listed in area C involve formwork, excavation and concrete work for sewage tanks and manholes to be managed by Mr. Erwin.
Original Description:
Original Title
Weekly Plan WP 6 - Civil & Lanscape Works 18-24 July 2023
This document outlines the weekly plan for the main contract from July 18-24. It details 7 tasks in area A related to excavation, concrete pouring, and manhole work to be overseen by Mr. Alvin. Area B outlines 9 sewage, canteen and masjid area tasks including wall casting, excavation and installation work to be led by Mr. Suprapto. The 5 tasks listed in area C involve formwork, excavation and concrete work for sewage tanks and manholes to be managed by Mr. Erwin.
This document outlines the weekly plan for the main contract from July 18-24. It details 7 tasks in area A related to excavation, concrete pouring, and manhole work to be overseen by Mr. Alvin. Area B outlines 9 sewage, canteen and masjid area tasks including wall casting, excavation and installation work to be led by Mr. Suprapto. The 5 tasks listed in area C involve formwork, excavation and concrete work for sewage tanks and manholes to be managed by Mr. Erwin.
A Parking Area & Others 1 Excavation RCP Line 18-19. Mr. Alvin 2 Concrete Pouring SM A1 dan SM 01. Mr. Alvin 3 Backfill Manhole. Mr. Alvin Grinding Polish Wall Manhole 22, 23, 25, 26, 29, 30 for 4 Mr. Alvin Epoxy Application Preparation. 5 Excavation Septic Tank ST 07. Mr. Alvin Install RCP 18-19 (Need More Info From Leemax 6 Mr. Alvin Pabrikasi Area). 7 Pabrikasi Upper Slab Manhole 22, 23, 25, 26, 29, 30. Mr. Alvin
B Sewage Area, Canteen Area & Masjid Area
1 Wall concrete casting ST-05 Mr. Suprapto 2 Install RCP MH 06-10 Mr. Suprapto 3 Excavation MH 13, 14, 12 & 20 Mr. Suprapto 4 Install Slab Formwork & Rebar Sewage Tank Mr. Suprapto 5 Slab Concrete Casting Mr. Suprapto 6 Bacfill & Compaction Septic Tank ST-02 Mr. Suprapto 7 Excavation & LC SM B3 & SM B14 Mr. Suprapto 8 Install Rebar SM B3 & SM B14 Mr. Suprapto 9 Install Wall Rebar Phase 2 for Sewage Tank Mr. Suprapto
C Section 2 Area (FS, MS & MW)
Wall Formwork installation & Wall Concrete Casting for 1 Mr. Erwin SMH 14 & 15. Excavation, install PE pipe & back fille between SMH 14 2 Mr. Erwin & 15. Wall Formwork installation & Wall Concrete Casting for 3 Mr. Erwin SMH 11 & 12. Excavation, install PE pipe & back fille between SMH 11 4 Mr. Erwin & 12. Excavation, LC , Setting Forwork & Slab Casting for 5 Mr. Erwin Septic Tank Material Warehouse, SMH 10 & 03.