You are on page 1of 60

Journal 7 eleven Narvacan Junction Ilocos Sur

Day 2 (July 5, 2023)

 Demolition
o Wall in the middle of the back part of the site
o CR located near the wall mentioned earlier
o Sink located outside the CR and wall mentioned ealier
o Floor for pathway of pipe for drain
o Materials that were used:
 Drain
 sledge hammer
 jackhammer

 Removal
o Glass and Aluminum in front of store
o Materials that were used:
 cutter
 rubber mallet
 screw driver
 Layout (Things that needs pipes and drains)
o Island that is used for placement steamer, hot water and etc. (needs filter)
o Sink near the counter (needs filter)
o Mop sink (does not need filter)
o Walk in chiller
o Water tank
o Materials that were used:
 measuring tape,
 pencil
 level bar (pang linya),
 drop

 Retain
o Galvanized roll up sa taas
o CR in the back corner near the projected water tank

Day 3 ( July 6 2023)

 Demolition
o Continuation Wall in the middle of the back part of the site
o Continuation CR located near the wall mentioned earlier
o Clearing of debris
o Continuation Floor for pathway of pipe for drain
o Materials that were used:
 Drill
 sledge hammer
 jackhammer
 sacks
 shovel

 Removal
o Double furring in ceiling
o Materials that were used
 Drill
 Hammer
 Aviation Snip

 Build
o Frame for drywall
 Materials that were used:
- Metal studs
- Blind rivets
- Aviation Snip
- Riveter
o Frame for cove light
 Materials that were used:
- Double furring
- Blind rivets
- Aviation Snip
- Riveter
Day 4 (July 7 2023)

 Demolition
o Continuation floor for pathway of pipe for drain

 Build
o Continuation frame for drywall
 Materials that were used
- Metal studs
- Blind rivets
- Aviation Snip
- Riveter
o Continuation frame for cove light
 Materials that were used:
- Double furring
- Wall angle
- Blind rivets
- Aviation Snip
- Riveter

o Ramp
 Materials that were used:
- CHB
- Rebars (dowels)
- Cement
- Sand
- Shovel
- Triangular trowel (kutsara

o Platform for aircon


 Materials that were used
- Angle bar
- Welding rod
- Welding machine w/ in built ground

o Pipe for water supply


 Materials that were used
- PPR pipe
- PPR pipe heater

Day 5 (July 8 2023)

 Build
o Continuation frame of drywall
 Materials that were used
- Metal studs
- Blind rivets
- Aviation Snip
- Riveter
o Start of installment of drywall
 Materials that were used
- Blind rivets
- Ficem board
- Concrete Nail
- Level bar
- Aviation snip (gunting)
- Riveter
- Carrying channel
- Grinder
- Drill
- Hammer
- pencil

o Continuation frame for cove light


 Materials that were used
- Ficem board
- Blind rivets
- Drill
- Grinder
- Riveter

o Start of wall at the backroom


 Materials that were used
- Nylon (Asintada)
- CHB
- Cement
- Sand
- Shovel
- Triangular trowel

o Gap on wall at the back (previously a doorway)


 Materials that were used
- Nylon (Asintada)
- CHB
- Cement
- Sand
- Shovel
- Triangular trowel
o Placement of PVC pipe for drain onto the pathway
 Materials that were used
- PVC Elbow 90 deg
- PVC Elbow 45 deg
- PVC tee
- PVC pipe

 Demolition
o Continuation floor for pathway of pipe for drain
 Materials that were used
- Drill
- Grinder
- Welding machine
- Jackhammer

Day 6 (July 9 2023)

 Demolition
o CR tiles on walls
 Materials that were used
- Chisel (pang tik tik)
- Sledgehammer
- Hammer

 Build
o Continuation of wall at the backroom
 Materials that were used
- Nylon (Asintada)
- CHB
- Cement
- Sand
- Shovel
- Triangular trowel
o Continuation of installment of drywall
 Materials that were used
- Blind rivets
- Ficem board
- Concrete Nail
- Level bar
- Aviation snip (gunting)
- Riveter
- Carrying channel
- Grinder
- Drill
- Hammer
- pencil
o Start of Installment of cove light frame connecting to dry wall
 Materials that were used
- Blind rivets
- Carrying channel
- Double furring
- Blind rivets
- Metal stud
- Concrete Nail
- Level bar
- Aviation snip (gunting)
- Riveter
- Grinder
- Drill
- Hammer
- Pencil
o Continutation of Placement of PVC pipe for drain onto the pathway
 Materials that were used
- Cement
- PVC Tee

Day 7 (July 10 2023)

 Build
o Continuation of wall at the backroom
 Materials that were used:
- Pang Bistay
- Sand
- Triangular Trowel (kutsara)
- Rectangle Trowel (pangbully)
- Nylon (Asintada)
- Concrete nail
- Cement
o Continuation of ramp (buhos)
 Materials that were used:
- Pang Bistay
- Sand
- Triangular Trowel (kutsara)
- Rectangle Trowel (pangbully)
- Nylon (Asintada)
- Hammer
- Rebars
o Continuation of Placement of PVC pipe for drain onto the pathway
 Materials that were used
- Cement
- PVC Pipe
- PVC Tee
- PVC Elbow

o Continuation placement PPR of pipe for water supply


 Materials that were used
- PPR pipe
- PPR Gate valve
- PPR Coupling
- PPR Tee

o Start of Installment of Dry wall top of walk-in chiller


 Materials that were used
- Blind rivets
- Ficem board
- Concrete Nail
- Level bar
- Aviation snip (gunting)
- Riveter
- Carrying channel
- Grinder
- Drill
- Hammer
- Pencil
o Start of Installment of cove light frame connecting to dry wall top of walk-in chiller
 Materials that were used
- Blind rivets
- Carrying channel
- Double furring
- Blind rivets
- Metal stud
- Concrete Nail
- Level bar
- Aviation snip (gunting)
- Riveter
- Grinder
- Drill
- Hammer
- Pencil
o Start of Installment of Electrical pipes on pathway located at the flooring
 Materials that were used:
- ¾ PVC orange Electrical pipe
- Butane
- Cement

o Start of Installment of Outlets on the showroom area


 Materials that were used:
- Junction box
- PVC Orange Male Adaptor
- Butane
- Cutter
 Demolition
o OLD Tiles in CR area
 Materials that were used:
- Chisel
- Sledgehammer
o Pathway of electrical pipes at ppr pipes connecting to tank and panel boards
 Materials that were used:
- Chipping Gun
- Chisel
- Hammer
o Continuation of pathway for drain pipes
 Materials that were used
- Chipping Gun
- Chisel
- Hammer

Day 8 (July 11, 2023)

 Demolition
o Reducing the length of the wall
 Materials that were use:
- Chisel
- Chipping gun
- Hammer
o Pathway for water supply going in the tank
 Materials that were used
- Chisel
- Chipping gun
- Hammer
o Start of pathway for Federline
 Build
o Installment of Door frame for backroom
 Materials that were used
- Pako
- Rivets
- Hammer
- Riveter
- Carrying Channel

o Installment of Door frame for cr


 Materials that were used
- Pako
- Blind Rivets
- Hammer
- Riveter
- Carrying Channel
o Continuation of installment of cove light bahay on top of walk in chiller
 Materials that were used
- Blind rivets
- Level bar
- Alambre
- Ficem board

o Continuation of wall at the backroom


 Materials that were used:
- Pang Bistay
- Sand
- Triangular Trowel (kutsara)
- Rectangle Trowel (pangbully)
- Nylon (Asintada)
- Concrete nail
- Cement

o Continuation of Installment of Outlets on the showroom area


 Materials that were used:
- Junction box
- PVC Orange Male Adaptor
- Butane
- Cutter

Day 9 (July 12, 2023)

 Build
o Continuation of installment of cove light bahay on top of walk-in chiller
 Materials that were used
- Blind rivets
- Level bar
- Alambre
- Ficem board

o Start of installation of mini concrete wall on the front of the store


 Materials that were used
- Asintada
- CHB
- Cement
- Sand
- Triangular trowel (kutsara)
- Rectangular trowel (pangbully)
o Installment of feederline pipe on to the pathway
 Materials that were used
- PVC solvent cement
- PVC pipe #2

o Start of installment of electricity for lights


 Materials that were used
- Switch box
- Junction Box
- Drill
- Tox
- Screw
o Continuation of ramp (plastering)
 Materials that were used:
- Cement
- Sand
- Triangular torwel
- Nylon
- Rectangular trowel

o Start of installation of platform for walk in chiller


 Materials that were used
- Cement
- Sand
- Triangular trowel
- Nylon
- Rectangular trowel
- Pipe (pang level)
- Double furring

o Start of Installment of tiles on the CR


 Materials that were used:
- Tile adhesive
- Cement
- CR tiles

o Continuation of wall at the back (former doorway)


 Materials that were used:
- Cement
- Sand
- Triangular trowel
- Rectangular trowel
 Demolition
o Continuation of pathway for feederline
 Materials that were used:
- Chipping gun
- Chisel
- Hammer
o Old stairs to align to new stairs
 Materials that were used
- Grinder
- Chisel
- Chipping gun
- Hammer

Day 10 (July 13 2023)

 Build
o Start of Installment of Tiles on selling area
 Materials that were used:
- Chipping gun
- Laser
- Pencil
- Nylon (Asintada)
- Concrete nail
- 60x60 tiles
- Cement
- Sand
- Tile adhesive
- Rubber mallet
- Triangular trowel (kutsara)
o Plastering of damaged column
 Materials that were used
- Concrete nail
- Nylon (asintada)
- Triangular Trowel
- Rectangular Trowel

o Continuation of ramp (pebbles and stairs plastering)


 Materials that were used
- Pebbles
- Cement
- Sand
- Nylon (asintada)
- Triangular trowel
- Rectangular trowel
o Continuation of installment of electricity for lights
 Materials that were used:
- PVC electrical pipe orange (bended)
- Butane
- Male adaptor
- PVC electrical pipe orange

o Start seting up for electricty for cliqq


 Materials that were used
- Utility box
- Male adaptor
- Pvc pipe orange
o Continuation of Installment of tiles on the CR
 Materials that were used:
- Tile adhesive
- Cement
- CR tiles
 Demolition
o Wall near the entrance
 Materials that were used
- Sledgehammer
- Chipping gun
o Relocation of old panel boards
 Materials that were used
- Pliers
- Screwdriver
- Flat screwdriver
- Electrical tape

Day 11 (July 14 2023)

 Build
o continuation of installment of tiles in selling area
 Materials that were used
- 60x60 white tiles
- cement
- sand
- rubber malet
- triangular trowel (kutsara)
- sponge
- water
- tile adhesive
- shovel
- level bar

o Start of installment of water supply for water tank


 Materials that were used
- Utility box
- Pipe
o Continuation of ramp
 Materials that were used
- cement
- pebbles
- sand
- double furring
- triangular trowel
- rectangular trowel
- sponge
- water
o Renovation of columns
 Materials that were used
- cement
- sand
- nylon (asintada)
- concrete nail
- triangular trowel
- rectangular trowel
o Continuation of Installment of tiles on the CR
 Materials that were used:
- Tile adhesive
- Cement
- CR tiles

 Demolition
o Pathway or abang for pipe and outlet of tank
 Materials that were used
- chisel
- hammer

o Pathway or abang for the outlet infront of the store in the mini wall
 Materials that were used
- chisel
- hammer
o Excess concrete that is sticking onto the beam
 Materials that were used
- chisel
- hammer
- ladder
Day 12 (July 15 2023)

 Build
o continuation of installment of tiles in selling area
 Materials that were used
- 60x60 white tiles
- cement
- sand
- rubber malet
- triangular trowel (kutsara)
- sponge
- water
- tile adhesive
- shovel
- level bar

o Continuation of installment of electricity for lights


 Materials that were used
- wires
- pang sungkit
- cutter
- pliers
o Continuation of ramp
 Materials that were used
- cement
- pebbles
- sand
- double furring
- triangular trowel
- rectangular trowel
- sponge
- water

o Continuation of CR
 Materials that were used
- tiles
- cement
- triangular trowel
- nylon
- concrete nail
Day 13 (July 16 2023) Absent

Day 14 (July 17 2023)

 Build
o continuation of installment of tiles in selling area
 Materials that were used
- 60x60 white tiles
- cement
- sand
- rubber malet
- triangular trowel (kutsara)
- sponge
- water
- tile adhesive
- shovel
- level bar
- grinder

o Continuation of ramp
 Materials that were used
- cement
- pebbles
- sand
- double furring
- triangular trowel
- rectangular trowel
- sponge
- water
- oil
- wood
o Continuation of CR
 Materials that were used
- tiles
- cement
- triangular trowel
- nylon
- concrete nail
o Continuation of installment of electricity for lights
 Materials that were used
- wires
- pang sungkit
- cutter
- pliers

Day 15 (July 18 2023)

 Build
o continuation of installment of tiles in selling area
 Materials that were used
- 60x60 white tiles
- cement
- sand
- rubber malet
- triangular trowel (kutsara)
- sponge
- water
- tile adhesive
- shovel
- level bar
- grinder

o Continuation of ramp
 Materials that were used
- cement
- pebbles
- sand
- double furring
- triangular trowel
- rectangular trowel
- sponge
- water

o Continuation of installment of electricity for lights


 Materials that were used
- wires
- pang sungkit
- cutter
- pliers
o Plastering of the old window frame at the bacj
 Materials that were used
- chb
- cement
- sand
- rectangar trowel
- traingular trowel

 Demolition
o Old windows at the back
 Materials that were used
- chisel
- screw
o Pathway for feederline outside
 Materials that were used
- chipping gun
- hammer
- chisel

Day 16 (July 19 2023)

 Demolition
o Pathway for feederline outside
 Materials that were used
- chipping gun
- hammer
- chisel

 Build
o continuation of installment of tiles in selling area
 Materials that were used
- 60x60 white tiles
- cement
- sand
- rubber malet
- triangular trowel (kutsara)
- sponge
- water
- tile adhesive
- shovel
- level bar
- grinder

o Start of grouting of ties in selling area


 Materials that were used
- ABC tile grout
- paleta
- basahan
- water

Day 17 (Jul 20 2023)

 Build
o continuation of installment of tiles in selling area (and nilubog yung tiles for matting)
 Materials that were used
- 60x60 white tiles
- cement
- sand
- rubber malet
- triangular trowel (kutsara)
- sponge
- water
- tile adhesive
- shovel
- level bar
- grinder

o Continuation of grouting of ties in seling area


 Materials that were used
- ABC tile grout
- paleta
- basahan
- water
o Continuation of pathway for feederline
 Materials that were used
- sand
- paper
- lighter
- pvc pipe electrical orange

o Continuation of installment of platform for aircon


 Materials that were used
- Angle bar
- Welding rod
- Welding machine

Day 18 (Jul 21 2023)

 Build
o Start of plastering of walls using skim coat
 Materials that were used
- Skim coat
- Paleta
- Water

o Continuation of installment of electricity for cliqq, feederline, showroom, outles front of


store
 Materials that were used
- Alambre
- Compressor
o Installation of walk-in chiller
 Materials are nor applicable (not in scope)
o Continuation of installment of platform for aircon
 Materials that were used
- Angle bar
- Welding rod
- Welding machine
- Metal saw cut off

Day 19 (Jul 22 2023)

 Build
o Continuation of plastering of walls using skim coat
 Materials that were used
- Skim coat
- Paleta
- Water
o Continuation of Installment of Dry wall top of walk-in chiller
 Materials that were used
- Blind rivets
- Ficem board
- Concrete Nail
- Level bar
- Aviation snip (gunting)
- Riveter
- Carrying channel
- Grinder
- Drill
- Hammer
- Pencil
o continuation of installment of tiles in selling area
 Materials that were used
- 60x60 white tiles
- cement
- sand
- rubber malet
- triangular trowel (kutsara)
- sponge
- water
- tile adhesive
- shovel
- level bar
- grinder

o Continuation of installment of platform for aircon


 Materials that were used
- Angle bar
- Welding rod
- Welding machine
- Metal saw cut off

Day 20 (Jul 23 2023)

 Build
o Continuation of plastering of walls using skim coat
 Materials that were used
- Skim coat
- Paleta
- Water

o Continuation of installment of platform for aircon


 Materials that were used
- Angle bar
- Welding rod
- Welding machine
- Metal saw cut off
o continuation of installment of tiles in selling area
 Materials that were used
- 60x60 white tiles
- cement
- sand
- rubber malet
- triangular trowel (kutsara)
- sponge
- water
- tile adhesive
- shovel
- level bar
- grinder

Day 21 (Jul 24 2023)

 Build
o Start building of rack
 Materials that were used
- Angle bar
- Welding rod
- Welding machine
- Ordinary wood
- Wood saw
o Continuation of plastering of walls using skim coat
 Materials that were used
- Skim coat
- Paleta
- Water
o Assembly of pump for tank
 Materials that were used
- APC
- Jet pump
- Ppr pipe
- PPR pipe heater
o continuation of installment of tiles in selling area
 Materials that were used
- 60x60 white tiles
- cement
- sand
- rubber malet
- triangular trowel (kutsara)
- sponge
- water
- tile adhesive
- shovel
- level bar
- grinder
o Installation of toilet for CR
 Materials that were used
- Toilet
- ??
o Start of fire exit door
 Materials that were used
- C channel
- Welding rod
- Welding machine
o Start of installation of ceiling
 Materials that were used
- Main tee
- Cross Tee
- Angle Tee
- Blind rivets
- Concrete nail
- Hammer
- Drill
- Riveter
- Carrying channel
o Installation of electricity for blue lights
 Materials that were used
- PVC electrical pipe orange
- Butane gas
o Start of door in backroom
 Materials that were used
- Formica
- Metal
 Demolition
o Pathway for electrical pipe for blue lights
 Materials that were used
- Chisel
- Hammer

Day 22 (Jul 25 2023)

 Build
o Continuation of installation of ceiling
 Materials that were used
- Main tee
- Cross Tee
- Angle Tee
- Blind rivets
- Concrete nail
- Hammer
- Drill
- Riveter
- Carrying channel
o Continuation building of rack
 Materials that were used
- Angle bar
- Welding rod
- Welding machine
- Ordinary wood
- Wood saw
- White Paint
- Baby roller
o continuation of installment of tiles in selling area
 Materials that were used
- 60x60 white tiles
- cement
- sand
- rubber malet
- triangular trowel (kutsara)
- sponge
- water
- tile adhesive
- shovel
- level bar
- grinder
o Continuation of plastering of walls using skim coat
 Materials that were used
- Skim coat
- Paleta
- Water
o Continuation of fire exit door
 Materials that were used
- C channel
- Rebars
- Cement
- Welding rod
- Welding machine
- Water
- Triangular Trowel

Day 23 (Jul 26 2023) Absent

Day 24 (Jul 27 2023) Absent

Day 25 (Jul 28 2023)

 Build
o Continuation painting works
 Materials that were used
- Flat Latex
- Semi Gloss
- QDE white
- QDE Choco brown
- Flat Wall Enamel
- Raw Sienna
- Paint Thinner
- Baby Roller
- Gypsum putty
- Gasa tape
- Rollr
- Paint brush
- Gasa tape
- Liha
o Rack already built
 Materials that were used
- Angle bar
- Welding rod
- Welding machine
- Roller
- Paint brush
- QDE chocolate brown
o Already Installed Wires for aircon
 Materials that were used
o Continuation of Installment of baseboard
 Materials that were used
- Baseboard

o Start of installment of Aluminum and Glass


 Materials that were used
- FD 100
- Wood
o Continuation of Installment of ceiling
 Materials that were used
- Cutter
- Drill
- Blind Rivets
- Riveter
o Start Building Housing for gen set
 Materials that were used
- Rebars
- Angle bar
- Welding Rod
- Welding machine
Day 26 (Jul 29 2023)

 Build
o Continuation painting works
 Materials that were used
- Flat Latex
- Semi Gloss
- QDE white
- QDE Choco brown
- Flat Wall Enamel
- Raw Sienna
- Paint Thinner
- Baby Roller
- Gypsum putty
- Gasa tape
- Rollr
- Paint brush
- Gasa tape
- Liha
o Continuation of Installment of ceiling
 Materials that were used
- Cutter
- Drill
- Blind Rivets
- Riveter
o Continuation Installment of Ramp
 Materials that were used
- Aluminum pipe
- Welding rod
- Welding machine
- Level bar
o Start Building Housing for gen set
 Materials that were used
- Rebars
- Angle bar
- Welding Rod
- Welding machine
o Continuation Installment of Door for cr and backroom
 Materials that were used
- Hinges
- Wireless drill
- Grinder

Day 27 (Jul 30 2023)


 Build
o Continuation painting works
 Materials that were used
- Flat Latex
- Semi Gloss
- QDE white
- QDE Choco brown
- Flat Wall Enamel
- Raw Sienna
- Paint Thinner
- Baby Roller
- Gypsum putty
- Gasa tape
o Continuation Building Housing for gen set
 Materials that were used
- Rebars
- Angle bar
- Welding Rod
- Welding machine
o Continuation Installment of Ramp
 Materials that were used
- Aluminum pipe
- Welding rod
- Welding machine
- Level bar
o Continuation of Installment of ceiling
 Materials that were used
- Cutter
- Drill
- Blind Rivets
- Riveter

Day 28 (Jul 31 2023)

 Build
o Continuation painting works
 Materials that were used
- Flat Latex
- Semi Gloss
- QDE white
- QDE Choco brown
- Flat Wall Enamel
- Raw Sienna
- Paint Thinner
- Baby Roller
- Gypsum putty
- Gasa tape
- Rollr
- Paint brush
- Gasa tape
- Liha
o continuation of installment of tiles in selling area
 Materials that were used
- 60x60 white tiles
- cement
- sand
- rubber malet
- triangular trowel (kutsara)
- sponge
- water
- tile adhesive
- shovel
- level bar
- grinder
o Continuation Installment of Ramp
 Materials that were used
- Aluminum pipe
- Welding rod
- Welding machine
- Level bar
o Continuation Building Housing for gen set
 Materials that were used
- Welding Rod
- Welding machine
- Metal sheet

You might also like