You are on page 1of 18

fas

25)

- TNS(2
8 i ANN a

US
है) WI
॥ )
1 OSE)
K

नए समाज की ओर
Towards a new dawn

Pradhan Mantri Matru Vandana Yojana


(PMMVY)

FREQUENTLY ASKED QUESTIONS

Ministry of Women and Child Development


Government of India
New Delhi
I.|. Introduction
Introduction
Under-nutrition
Under-nutrition continues continues to to adversely
adversely affect
affect majority
majority of of women
women
in
in India.
India. In In India,
India, every
every third
third woman
woman is is undernourished
undernourished and and every
every
second
second woman woman is is anemic.
anemic. An An undernourished
undernourished mother mother almost
almost
inevitably
inevitably gives gives birth
birth toto aa low
low birth
birth weight
weight baby.
baby. When
When poorpoor nutrition
nutrition
starts
starts in-utero,
in-utero, it it extends
extends throughout
throughout the the life
life cycle
cycle since
since the
the changes
changes
are
are largely
largely irreversible.
irreversible. OwingOwing to to economic
economic and and social
social distress
distress many
many
women
women continue
continue to to work
work to to earn
earn a a living
living for
for their
their family
family right
right upup to
to
the
the last
last days
days of of their
their pregnancy.
pregnancy. Furthermore,
Furthermore, they they resume
resume working
working
soon
soon after
after childbirth,
childbirth, even even though
though their
their bodies
bodies might
might not
not permit
permit it,it,
thus
thus preventing
preventing their their bodies
bodies fromfrom fully
fully recovering
recovering on on one
one hand,
hand, andand
also
also impeding
impeding their their ability
ability toto exclusively
exclusively breastfeed
breastfeed their
their young
young infant
infant
in
in the
the first
first six
six months.
months.

From
From 01.01.2017,
01.01.2017, the the Maternity
Maternity Benefit
Benefit Programme
Programme is is implemented
implemented
in
in all
all the
the districts
districts of of the
the country.
country. TheThe programme
programme is is named
named as as
‘Pradhan Mantri Matru Vandana Yojana’ (PMMVY).
‘Pradhan Mantri Matru Vandana Yojana’ (PMMVY). Under PMMVY, Under PMMVY,
aa cash
cash incentive
incentive of of `¥ 5000/-
5000/- is is provided
provided directly
directly toto the
the Bank
Bank // Post
Post
Office
Office Account
Account of of Pregnant
Pregnant Women
Women and and Lactating
Lactating Mothers
Mothers (PW&LM)
(PW&LM)
for
for first
first living
living child
child of
of the
the family
family subject
subject to
to fulfilling
fulfilling specific
specific conditions
conditions
relating to Maternal and Child
relating to Maternal and Child Health. Health.

PMMVY
PMMVY is is implemented
implemented usingusing the
the platform
platform ofof Anganwadi
Anganwadi Services
Services
scheme
scheme of of Umbrella
Umbrella ICDS
ICDS under
under Ministry
Ministry of of Women
Women and and Child
Child
Development
Development in in respect
respect of of States/
States/ UTsUTs implementing
implementing schemescheme
through
through Women
Women and and Child
Child Development
Development Department/
Department/ Social
Social Welfare
Welfare
Department
Department andand through
through Health
Health system
system inin respect
respect of
of States/
States/ UTs
UTs where
where
scheme
scheme is
is implemented
implemented by by Health
Health & & Family
Family Welfare
Welfare Department.
Department.

PMMVY
PMMVY is is implemented
implemented through
through aa centrally
centrally deployed
deployed Web
Web Based
Based MIS
MIS
Software
Software application
application and
and the
the focal
focal point
point of
of implementation
implementation would
would be
be
the
the Anganwadi
Anganwadi Centre
Centre (AWC)
(AWC) and
and ASHA/
ASHA/ ANM
ANM workers.

1
II. Beneficiary
Beneficiary Application
Application Process
Process under
under PMMVY
PMMVY

Frequently
Frequently Asked
Asked Questions
Questions

A.
A. Pradhan
Pradhan Mantri
Mantri Matru
Matru Vandana
Vandana Yojana
Yojana (PMMVY)–
(PMMVY)-
Scheme
Scheme Eligibility
Eligibility
Q.1.
Q.1. Is
Is LMP
LMP Date
Date mandatory
mandatory to
to be
be provided
provided to
to claim
claim benefits
benefits
under
under the
the scheme?
scheme?

Ans.1.
Ans.1. Yes,
Yes, the the LMP
LMP Date,
Date, as
as found
found in in the
the MCP
MCP Card Card is
is mandatory
mandatory
to
to claim
claim thethe 11%st and
and 22"?nd instalment.
instalment. If If LMP
LMP Date
Date isis not
not
provided,
provided, the the beneficiary
beneficiary is is not
not eligible
eligible to to claim
claim the
the 11*st and
and
22"9nd Instalment
Instalment and and can
can claim
claim only
only the
the 3
3"rd instalment
instalment provided
provided
she
she fulfils
fulfils the
the conditionality
conditionality for for availing
availing third
third instalment
instalment of of
the
the scheme.
scheme.

Q.2.
५.2. How
How cancan a a beneficiary
beneficiary avail
avail service
service if
if she
she registers
registers
herself
herself with
with the
the field
field functionary
functionary after
after 150
150 days
days ofof
LMP?
LMP?

Ans.2.
Ans.2. The
The beneficiary
beneficiary has has toto register
register her
her pregnancy
pregnancy at at the
the
approved
approved health
health facility
facility within
within 150
150 days
days from
from the
the date
date ofof
LMP
LMP which
which needs
needs toto be
be entered
entered inin the
the MCP
MCP Card.
Card. Thereafter,
Thereafter,
she
she can
can apply
apply for
for availing
availing maternity
maternity benefit
benefit at
at Anganwadi
Anganwadi
Centre
Centre oror to
to ASHA/ANM
ASHA/ANM within within 730
730 days
days from
from the
the date
date ofof
LMP.
LMP.

Q.3.
Q.3. A
A beneficiary
beneficiary with
with LMP
LMP date
date of
of 4
4 March
March 2016
2016 is
is made
made
ineligible
ineligible by
by the
the system.
system. Why?
Why?
Ans.3.
Ans.3. IfIf the
the LMP
LMP date
date isis before
before 1 1%st April,
April, 2016,
2016, the
the beneficiary
beneficiary isis
not
not eligible
eligible for
for availing
availing maternity
maternity benefit
benefit under
under PMMVY
PMMVY and and
therefore,
therefore, is is considered
considered ineligible
ineligible by by the
the system
system (PMMMVY-
(PMMMVY-
CAS).
CAS).

Q.4.
Q.4. LMP
LMP date
date of
of the
the beneficiary
beneficiary is is 4
4 January
January 2017
2017 and
and the
the
Date
Date ofof Registration
Registration ofof MCP
MCP cardcard is
is 8
8 July
July 2017.
2017. Why
Why
is
is the
the system
system making
making the
the First
First Instalment
Instalment Application
Application
ineligible?

2
Ans.4.
Ans.4. The
The date
date of
of registration
registration of
of the
the beneficiary
beneficiary in
in the
the MCP
MCP card
card
must
must be
be within
within 150150 days
days from
from the
the LMP
LMP date
date to
to be
be eligible
eligible to
to
claim
claim the
the First
First Instalment
Instalment under
under the
the scheme.
scheme.

Q.5.
Q.5. How
How many
many Antenatal
Antenatal Check-up
Check-up (ANC)
(ANC) needs
needs to
to be
be
done
done for
for availing
availing 2
2"!nd instalment?
instalment?

Ans.5.
Ans.5. The
The beneficiary
beneficiary is is required
required toto do
do at
at least
least one
one ANC
ANC for
for
availing
availing 22"4 instalment.
nd
instalment. The
The instalment
instalment may
may bebe claimed
claimed after
after
66 months
months (180(180 days)
days) from
from the
the LMP
LMP date.
date.

Q.6.
Q.6. Can
Can a a beneficiary
beneficiary undergoing
undergoing ANC
ANC and
and delivery
delivery in
in
Private
Private hospital
hospital avail
avail the
the benefit?
benefit?
Ans.6.
Ans.6. Since
Since only
only government
government hospitals
hospitals have
have authority
authority to to register/
register/
update
update thethe MCPMCP Card,
Card, beneficiary
beneficiary takingtaking services
services from
from
private
private hospitals
hospitals cancan not
not avail
avail the
the benefit
benefit ofof the
the scheme
scheme as as
MCP
MCP card
card details
details are
are mandatory
mandatory for for claiming
claiming any any instalment
instalment
under
under PMMVY.
PMMVY. However,
However, if if the
the requisite
requisite conditions
conditions are are duly
duly
certified
certified by
by aa government
government doctor doctor oror officer/
officer/ functionary
functionary of of
the
the Health
Health Department
Department not not below
below the the rank
rank ofof ANM,
ANM, thethe
beneficiary
beneficiary can can claim
claim maternity
maternity benefit
benefit under
under PMVVYPMVVY
and
and the
the claim
claim should
should be be accepted
accepted by by the
the Field
Field Functionary
Functionary
(AWW/ANM/ASHA).
(AWW/ANM/ASHA).

Q.7.
Q.7. A
A beneficiary
beneficiary hashas completed
completed herher ANC
ANC within
within 44
months
months from
from LMP
LMP and
and has
has immediately
immediately applied
applied for
for
Instalment
Instalment 2,
2, she
she becomes
becomes ineligible.
ineligible. Why?
Why?

Ans.7.
Ans.7. As
As per
per the
the PMMVY
PMMVY Scheme
Scheme Implementation
Implementation Guidelines,
Guidelines,
Instalment
Instalment 2 2 can
can only
only be
be claimed
claimed after
after 180
180 days
days from
from LMP
LMP
date
date provided
provided ANC
ANC has
has been
been completed.
completed. The The date
date of
of ANC
ANC can
can
be
be any
any time
time before
before the
the Date
Date of
of Claim
Claim ofof Instalment
Instalment 2, 2, but
but the
the
instalment
instalment can
can be
be claimed
claimed only
only after
after 180
180 days
days from
from LMP.
LMP.

Q.8.
५.8. Does
Does the
the ANC
ANC have
have to
to be
be 180
180 days
days after
after the
the LMP
LMP Date
Date
to
to claim
claim Instalment
Instalment 22 under
under PMMVY?
PMMVY?

Ans.8.
Ans.8. ANC
ANC can
can be
be done
done anytime
anytime between
between LMP LMP Date
Date and
and Date
Date
of
of Claim
Claim of
of Instalment
Instalment 2. 2. The
The date
date ofof last
last completed
completed ANC
ANC
needs
needs to
to be
be provided
provided for
for claiming
claiming the
the Instalment
Instalment 2.

3
0.9.
Q.9. The
The date
date ofof delivery
delivery forfor the
the first
first child
child of
of the
the
beneficiary
beneficiary isis 1
1*st January
January 2017,
2017, Which
Which Instalments
Instalments
can
can she
she claim?
claim?
Ans.9.
Ans.9. IfIf the
the date
date ofof childbirth
childbirth is
is 11*st January
January 2017,
2017, the
the beneficiary
beneficiary
is
is eligible
eligible for
for all
all the
the instalments
instalments underunder thethe PMMVY
PMMVY Scheme
Scheme
subject
subject to to meeting
meeting all all other
other eligibility
eligibility conditions
conditions for
for the
the
individual
individual instalments.
instalments.

Q.10.
Q.10. A
A beneficiary
beneficiary has
has received
received Instalment
Instalment 22 and
and forgotten
forgotten
to
to apply
apply for
for Instalment
Instalment 1.1. Can
Can she
she claim
claim Instalment
Instalment
11 now?
now?
Ans.10.
Ans.10. The
The dates
dates of
of claims
claims have
have to
to be
be in
in sequence,
sequence, i.e.
i.e. date
date of
of claim
claim
ofoffirst
first instalment
instalment ≤ < date
date of
of claim
claim ofof second
second instalment
instalment ≤ < date
date
of
of claim
claim of
of third
third instalment.
instalment. ButBut the
the claims
claims can
can bebe entered
entered inin
the
the system
system inin any
any order.
order. The
The scheme
scheme conditionalities
conditionalities need
need to
to
be
be adhered
adhered to.to.

Q.11.
Q.11. What
What ifif a
a beneficiary
beneficiary meets
meets the
the eligibility
eligibility conditions
conditions
of
of the
the scheme
scheme but
but has
has applied
applied late
late for
for PMMVY?
PMMVY?
Ans.11.
Ans.11. The
The beneficiary
beneficiary cancan apply
apply forfor benefits
benefits under
under thethe PMMVY
PMMVY
Scheme
Scheme within
within 730
730 days
days from
from LMPLMP date
date oror 460
460 days
days from
from
the
the date
date of
of Child
Child Birth
Birth (in
(in case
case of
of unavailability
unavailability ofof LMP
LMP date)
date)
subject
subject to
to fulfillment
fulfillment of
of all
all the
the other
other eligibility
eligibility criteria
criteria under
under
the
the Scheme.
Scheme.

Q.12.
Q.12. The
The date
date ofof registration
registration for for an
an Old Old MBP
MBP scheme
scheme
(IGMSY)
(IGMSY) casecase is
is 4
4*th July
July 2016
2016 as as the
the beneficiary
beneficiary had
had
filled
filled the
the form
form then,
then, thethe system
system is is not
not allowing
allowing to
to save
save
the
the form
form and
and showing
showing error.
error. Why
Why is is this
this happening?
happening?

Ans.12.
Ans.12. The
The date
date of of registration
registration under
under PMMVY
PMMVY SchemeScheme cannot
cannot be
be
before
before 11% January
st
January 2017.
2017. AnyAny Old Old MBP
MBP scheme
scheme beneficiary
beneficiary
must
must freshly
freshly register
register in
in PMMVY
PMMVY by by filling
filling up
up the
the appropriate
appropriate
form
form on
on aa date
date on
on or
or after
after 11*st January
January 2017.
2017.

Q.13.
Q.13. If
If a
a beneficiary
beneficiary has
has an an LMP
LMP date
date of
of 77 th June 2016
June 2016
and
and has
has not
not received
received anyany money
money from
from the
the Old
Old MBP
MBP
scheme,
scheme, isis she
she eligible
eligible toto receive
receive benefits
benefits under
under
PMMVY?

4
Ans.13.
Ans.13. The
The beneficiary
beneficiary isis eligible
eligible for
for all
all instalments
instalments if if the
the LMP
LMP falls
falls
after
after 11*st April
April 2016
2016 and
and delivery
delivery date
date must
must be be on
on or
or after
after
11*st January
January 2017
2017 given
given all
all the
the other
other eligibility
eligibility conditions
conditions are
are
met.
met.

Q.14.
Q.14. If
If a
a beneficiary
beneficiary has
has received
received the
the first
first instalment
instalment
in
in Old
Old MBP
MBP Scheme,
Scheme, is
is she
she eligible
eligible toto apply
apply for
for
PMMVY?
PMMVY?
Ans.14.
Ans.14. Yes,
Yes, if
if a
a beneficiary
beneficiary hashas received
received thethe first
first instalment
instalment in
in
Old
Old MBP
MBP Scheme,
Scheme, sheshe is
is eligible
eligible to
to claim
claim only
only Instalment
Instalment 33
provided
provided she
she fulfils
fulfils the
the required
required eligibility
eligibility conditions.
conditions.

Q.15.
Q.15. How
How can
can aa SNO
SNO view
view the
the CDPO/MO
CDPO/MO Block
Block wise
wise
beneficiary
beneficiary and
and payment
payment reports?
reports?

Ans.15.
Ans.15. The
The SNO
SNO level
level Beneficiary
Beneficiary enrolment
enrolment and
and Payment
Payment report
report
shows
shows details
details for
for LGD
LGD Block
Block only.

5
B.
B. Pradhan
Pradhan Mantri
Mantri Matru
Matru Vandana
Vandana Yojana-
Yojana-
Common
Common Application
Application Software
Software (PMMVY-
(PMMVY- CAS)
CAS)
Q.1.
Q.1. I| have
have forgotten
forgotten the
the password,
password, how
how do
do I| login
login to
to the
the
system?
System?

Ans.1.
Ans.1. The
The user
user can
can get
get their
their password
password resetreset using
using the
the Forgot
Forgot
Password
Password option
option available
available below
below thethe login
login space.
space. Also,
Also, aa
user
user one
one level
level above
above in in the
the system
system cancan reset
reset the
the same.
same.
The
The link
link for
for password
password resetreset isis available
available on on User
User SetSet upup
screen.
Screen. Refer
Refer to
to the
the PMMVY-CAS
PMMVY-CAS User User Manual
Manual for for details.
details.

Q.2.
Q.2. How
How dodo I| create
create aa new
new user
user in
in the
the system
system and
and update
update
existing
existing user
user details?
details?

Ans.2.
Ans.2. An
An existing
existing user
user cancan create
create aa new
new user
user in
in the
the system.
system. The
The
new
new user
user creation
creation is is allowed
allowed forfor one
one or
or more
more levels
levels down
down
users
users only.
only. E.g.,
E.g., aa State
State Nodal
Nodal Officer
Officer can
can create
create users
users at
at
District
District and
and Block
Block level,
level, while
while a a District
District user
user can
can create
create users
users
at
at Block
Block level
level only.
only. Refer
Refer to
to the
the PMMVY-CAS
PMMVY-CAS User User Manual
Manual
for
for details.
details.

Q.3.
Q.3. Can
Can wewe associate
associate the
the same
same Email
Email ID
ID to
to the
the Scheme
Scheme
Facilitator
Facilitator and
and Sanctioning
Sanctioning Officer
Officer of
of aa CDPO/MO
CDPO/MO
Block?
Block?

Ans.3.
Ans.3. No.
No. The
The same
same person
person cannot
cannot enter
enter the
the data
data and
and approve
approve it
it
in
in the
the system.
system. There
There has
has to
to be
be different
different maker
maker and
and checker
checker
in
in the
the system.
system.

Q.4.
Q.4. How
How to to prepare
prepare master
master data
data in in case
case aa Field
Field
Functionary
Functionary (Anganwadi
(Anganwadi Center,
Center, ASHA/ANM)
ASHA/ANM) is
is
responsible
responsible for
for more
more than
than one
one village
village or
or town?
town?

Ans.4.
Ans.4. One
One Field
Field Functionary
Functionary must must be be uniquely
uniquely mapped
mapped to to
one
one village/
village/ town
town code
code in in PMMVY-CAS
PMMVY-CAS System.
System. IfIf a
a Field
Field
Functionary
Functionary has has been
been given
given thethe responsibility
responsibility ofof more
more
than
than one
one village,
village, the
the State
State must
must take
take an
an administrative
administrative
decision
decision asas to
to which
which village
village the
the Field
Field Functionary
Functionary would
would be be
mapped.

6
Q.5.
Q.5. How
How to to prepare
prepare master
master data
data in
in case
case more
more than
than one
one
Field
Field Functionary
Functionary (Anganwadi
(Anganwadi Center,
Center, ASHA/ANM)
ASHA/ANM)
are
are present
present in
in a a village?
village?

Ans.5.
Ans.5. In
In PMMVY-CAS
PMMVY-CAS system
system more
more than
than one
one Field
Field Functionary
Functionary can
can
be
be mapped
mapped to
to a
a village
village code
code in
in the
the master
master data.
data.

Q.6.
Q.6. How
How toto prepare
prepare the
the master
master data
data in
in case
case any
any mapping
mapping
of
of Field
Field Functionary
Functionary (example
(example –— Village
Village Name,
Name, Verifier
Verifier
Name
Name etc.)
etc.) is
is missing
missing in
in the
the available
available data?
data?

Ans.6.
Ans.6. In
In the
the event
event ofof unavailability
unavailability ofof any
any mapping,
mapping, aa new
new Field
Field
Functionary
Functionary can
can be
be created
created in
in the
the PMMVY-CAS
PMMVY-CAS system
system using
using
respective
respective DNO/
DNO/ SNO
SNO login.
login. Refer
Refer to
to the
the PMMVY-CAS
PMMVY-CAS User
User
Manual
Manual for
for details.
details.

Q.7.
Q.7. Can
Can one
one Field
Field Functionary
Functionary (Anganwadi
(Anganwadi Center,
Center, ASHA/
ASHA/
ANM)
ANM) bebe associated
associated with
with multiple
multiple verifiers
verifiers (Sectors,
(Sectors,
ANM)
ANM) in
in the
the Master
Master Data?
Data?

Ans.7.
Ans.7. No,
No, One
One Field
Field Functionary
Functionary can
can be
be mapped
mapped to to only
only one
one
Verifier;
Verifier; however,
however, there
there can
can be
be multiple
multiple Field
Field Functionaries
Functionaries
under
under aa single
single Verifier.
Verifier.

Q.8.
Q.8. How
How to to prepare
prepare master
master data
data in
in the
the case
case of
of Urban
Urban
Areas,
Areas, which
which code
code is
is to
to be
be used
used and
and are
are ward
ward wise
wise
details
details required?
required?

Ans.8.
Ans.8. For
For urban
urban areas,
areas, the
the Census
Census 2011
2011 code
code of of the
the urban
urban area
area
(town
(town oror city)
city) must
must be be entered.
entered. TheThe ward-wise
ward-wise details
details
of
of the
the urban
urban areaarea areare not
not required.
required. For For all
all Field
Field
Functionaries
Functionaries in in an
an urban
urban area
area the
the same
same codecode isis to
to bebe
provided.
provided. InIn case
case ofof Census
Census Code
Code not
not being
being present
present forfor a a
newly
newly created
created entity,
entity, the
the corresponding
corresponding LGD LGD code
code needs
needs
to
to be
be referred
referred toto but
but such
such cases
cases need
need to to be
be highlighted
highlighted to to
MWCD
MWCD as as well.
well.

Q.9.
Q.9. If
If a
a new
new Field
Field Functionary
Functionary is is created,
created, is
is it
it necessary
necessary
to
to uniquely map it to a Verifier and an LGD Village
uniquely map it to a Verifier and an LGD Village
or
or Town
Town code.
code. Similarly,
Similarly, if if aa verifier
verifier is
is created
created isis it
it
mandatory
mandatory to to map
map it it to
to a
a CDPO/MO
CDPO/MO Block?

7
Ans.9.
Ans.9. Yes,
Yes, aa Field
Field Functionary
Functionary has has to
to bebe uniquely
uniquely mapped
mapped to to a
a
Village
Village oror Town
Town Code,
Code, toto aa Verifier
Verifier andand further
further to
to aa CDPO/
CDPO/
MO
MO Block.
Block. Similarly,
Similarly, aa Verifier
Verifier cancan bebe uniquely
uniquely mapped
mapped
to
to one
one CDPO/MO
CDPO/MO Block Block only.
only. It
It is
is not
not possible
possible toto create
create aa
verifier
verifier that
that is
is not
not mapped
mapped to to any
any CDPO/MO
CDPO/MO Block.
Block.

Q.10.
Q.10. Can
Can we
we create
create a a Field
Field Functionary,
Functionary, Verifier
Verifier or
or CDPO/
CDPO/
MO
MO Block
Block if
if their
their ID
ID codes
codes have
have not
not be
be generated
generated yet?
yet?
Can
Can we
we use
use self-generated
self-generated ID ID code?
code?
Ans.10.
Ans.10. No,
No, IDID Code
Code for for each
each entity
entity isis mandatory.
mandatory. No No Field
Field
Functionary,
Functionary, Verifier
Verifier or or CDPO/MO
CDPO/MO Block Block can
can bebe created
created if if
their
their ID
ID code
code isis not
not available.
available. Only
Only the
the ID
ID codes
codes generated
generated
by
by RCH
RCH Portal
Portal oror ICDS
ICDS oror Central
Central Ministry
Ministry forfor each
each entity
entity
must
must bebe entered
entered in in the
the system.
system. Self-generated
Self-generated ID ID codes
codes are
are
not
not acceptable.
acceptable.

Q.11.
Q.11. What
What are
are the
the other
other ways
ways of
of searching
searching for
for a
a beneficiary
beneficiary
apart
apart from
from their
their ID
ID Proof?
Proof?
Ans.11.
Ans.11. The
The Beneficiary
Beneficiary can
can bebe searched
searched in in the
the system
system through
through
other
other alternate
alternate means
means such
such asas Bank
Bank Account
Account Number
Number oror
Mobile
Mobile Number
Number ofof Field
Field Functionary.
Functionary.
Q.12.
Q.12. What
What is
is the
the process
process of
of filling
filling form
form for
for 11*st instalment
instalment in
in
PMMVY
PMMVY CAS?
CAS?
Ans.12.
Ans.12. Following
Following are
are the
the Steps
Steps required
required to
to fill
fill 11%st instalment
instalment in
in
PMMVY
PMMVY CAS:-
CAS:-

a.a. Login
Login toto the
the PMMVY
PMMVY Software,
Software, please
please visit
visit https://
https://
pmmvy-cas.nic.in,
pmmvy-cas.nic.in, log log inin with
with respective
respective Scheme
Scheme
Facilitator’s
Facilitator’s login
login details;
details;

b.b. Search
Search for
for the
the beneficiary
beneficiary ifif already
already registered
registered with
with
the
the identification
identification details
details provided
provided by by the
the beneficiary;
beneficiary;

c.
८. IfIf the
the beneficiary
beneficiary isis not
not found
found -- Click
Click on
on “New
“New
Beneficiary”
Beneficiary” forfor registering
registering the
the beneficiary
beneficiary under
under
PMMVY
PMMVY scheme;
scheme;

d.d. Fill
Fill in
in the
the details
details as
as per
per the
the Beneficiary
Beneficiary Registration
Registration
Form
Form (follow
(follow the
the instructions
instructions provided
provided in
in PMMVY-
PMMVY-
CAS
CAS User
User Manual);

8
Note
Note -- Beneficiary
Beneficiary registration
registration form
form is
is also
also form
form for
for claiming
claiming
the
the First
First Instalment
Instalment of
of maternity
maternity benefit.
benefit.

Please
Please find
find the
the link
link for
for YouTube
YouTube video
video listing
listing out
out the
the detailed
detailed
process
process for
for registering
registering the
the beneficiary
beneficiary under
under PMMVY
PMMVY scheme
scheme
—https://www.youtube.com/watch?v=g2A7mheyMy4
–https://www.youtube.com/watch?v=g2A7mheyMy4
Q.13.
Q.13. What
What is
is the
the process
process of
of filling
filling 2
2"nd and
and 3
3"rd instalments
instalments in
in the
the
PMMVY-CAS?
PMMVY-CAS?

Ans.13.
Ans.13. Following
Following are
are the
the Steps
Steps required
required to
to fill
fill 11%st Instalment
Instalment in
in
PMMVY
PMMVY CAS:
CAS:

a.a. Login
Login to
to the
the PMMVY
PMMVY CAS,
CAS, please
please visit
visit https://pmmvy-
https://pmmvy-
cas.nic.in,
cas.nic.in, log
log in
in with
with respective
respective Scheme
Scheme Facilitator’s
Facilitator’s
login
login details;
details;

b.b. Search
Search for
for the
the beneficiary
beneficiary with
with the
the identification
identification
details
details provided
provided by
by the
the beneficiary;
beneficiary;

८.c. IfIf the


the beneficiary
beneficiary is
is registered,
registered, click
click on
on the
the beneficiary
beneficiary
ID
ID andand open
open the
the registration
registration form;
form;

d.
d. Click
Click on
on “Second
“Second Instalment”
Instalment” or
or “Third
“Third Instalment”
Instalment”
as
as required
required to
to open
open the
the respective
respective form;
form;

e.e. Fill
Fill in
in the
the details
details as
as per
per the
the Second
Second oror Third
Third Instalment
Instalment
respectively
respectively (follow
(follow the
the instructions
instructions provided
provided inin
PMMVY-CAS
PMMVY-CAS User User Manual).
Manual).

Please
Please find
find the
the link
link for
for you-tube
you-tube video
video listing
listing out
out the
the
detailed
detailed process
process for
for filling
filling the
the Second
Second and
and Third
Third Instalment
Instalment
form –https://www.youtube.com/watch?v=g2A7mheyMy4
form —https://www.youtube.com/watch?v=g2A7mheyMy4

Q.14.
Q.14. If
If the
the Scheme
Scheme Facilitator
Facilitator has
has missed
missed out
out on
on filling
filling
the
the Instalment
Instalment 2 2 form
form and
and the
the Instalment
Instalment 3 3 has
has been
been
approved,
approved, will
will the
the beneficiary
beneficiary not
not get
get Instalment
Instalment 2? 2?

Ans.14.
Ans.14. IfIf the
the Instalment
Instalment 33 formform has
has been
been filled
filled before
before Instalment
Instalment 22
form,
form, thethe system
system will
will not
not restrict
restrict data
data entry
entry ofof Instalment
Instalment 2 2
form.
form. It It will
will only
only be
be submitted
submitted if if the
the Date
Date ofof Claim
Claim at
at Field
Field
Functionary
Functionary for for Instalment
Instalment 22 is
is on
on oror before
before Date
Date of
of Claim
Claim ofof
Instalment
Instalment 3.

9
Q.15.
Q.15. At
At how
how many
many levels
levels dashboard
dashboard can
can be
be viewed?
viewed?

Ans.15.
Ans.15. Scheme
Scheme Dashboard
Dashboard is
is available
available at
at 3
3 tiers:
tiers: National,
National, State
State
and
and District.
District.

Q.16.
Q.16. Which
Which all
all reports
reports are
are available
available to
to Scheme
Scheme Facilitator’s
Facilitator's
and
and Sanctioning
Sanctioning Officers’
Officers' dashboard?
dashboard?

Ans.16.
Ans.16. List
List of
of reports
reports available
available at
at the
the Scheme
Scheme Facilitator’s
Facilitator's level
level is
is as
as
follows:
follows: --

. Withdrawal
Withdrawal Queue
Queue Report
Report


० Correction
Correction Queue
Queue Report
Report

.
• Payment
Payment Report
Report

List
List of
of reports
reports available
available at
at the
the Sanctioning
Sanctioning Officer’s
Officer's level
level is
is
as
as follows:
follows: --


० Approval
Approval Queue
Queue Report
Report


. Withdrawal
Withdrawal Queue
Queue Report
Report


. Second
Second Instalment
Instalment Due
Due Report
Report


. Third
Third Instalment
Instalment Due
Due Report
Report


० Payment
Payment Reports
Reports

Q.17.
Q.17. Which
Which all all reports
reports are
are available
available to
to District
District Nodal
Nodal
Officer’s,
Officer’s, State
State Nodal
Nodal Officer’s
Officer’s and
and Central
Central Nodal
Nodal
Officer’s
Officer’s dashboard?
dashboard?

Ans.17.
Ans.17. List
List of
of reports
reports available
available to
to District
District Nodal
Nodal officer’s
officer’s dashboard
dashboard
is
is as
as follows:
follows: --


e Delayed
Delayed Approval
Approval Report
Report

e Pending
Pending SO
SO Approval
Approval Report
Report

e Payment
Payment Report
Report

e Beneficiary
Beneficiary Instalments
Instalments Paid
Paid Report
Report

. Total
Total Beneficiaries

10
10
• Timeliness
Timeliness in
in Payment
Payment process
process
• Ageing
Ageing Report
Report
• Fund
Fund Disbursement
Disbursement Report
Report

List
List of
of reports
reports available
available to
to State
State Nodal
Nodal Officer’s
Officer’s dashboard
dashboard is
is
as
as follows:-
follows:-

• Pending
Pending SO
SO Approval
Approval Report
Report
• Payment
Payment Report
Report

• Payment
Payment Batch
Batch History
History

• Beneficiary
Beneficiary Instalments
Instalments Paid
Paid Report
Report

• Aadhaar
Aadhaar Penetration
Penetration Report
Report

• Total
Total Beneficiaries
Beneficiaries
• Timeliness
Timeliness in
in Payment
Payment process
process

• Ageing
Ageing Report
Report

• Fund
Fund Disbursement
Disbursement Report
Report

List
List of
of reports
reports available
available to
to Central
Central Nodal
Nodal Officer
Officer is
is as
as
follows:-
follows:-

• Pending
Pending SNO
SNO Approval
Approval Report
Report

• Beneficiary
Beneficiary Instalments
Instalments Paid
Paid Report
Report

• Aadhaar
Aadhaar Penetration
Penetration Report
Report

• Total
Total Beneficiaries
Beneficiaries
• Timeliness
Timeliness in
in Payment
Payment process
process

• Ageing
Ageing Report
Report

• Fund
Fund Disbursement
Disbursement Report
Report

Q.18.
Q.18. A
A beneficiary
beneficiary has
has given
given the
the correct
correct details
details for
for
Instalment
Instalment 3 3 but
but her
her record
record is
is not
not showing
showing up up inin
the
the Sanctioning
Sanctioning Officer
Officer Instalment
Instalment Approval
Approval queue.
queue.
Why?
Why?

11
11
Ans.18.
Ans.18. Instalment
Instalment 3 3 will
will not
not appear
appear in in the
the Instalment
Instalment Approval
Approval
queue
queue ofofthe
the Sanctioning
Sanctioning Officer
Officer unless
unless Aadhaar
Aadhaar details
details have
have
been
been provided
provided for for both
both the
the beneficiary
beneficiary andand her
her husband
husband as as
Aadhaar
Aadhaar details
details areare mandatory
mandatory to to claim
claim third
third instalment
instalment
(except
(except for
for J&K,
J&K, Meghalaya
Meghalaya andand Assam).
Assam).

0.19.
Q.19. What
What can
can be
be done
done if
if the
the Scheme
Scheme Facilitator
Facilitator has
has made
made
aa data
data entry
entry error?
error?

Ans.19.
Ans.19. IfIf aascheme
scheme facilitator
facilitator has
has made
made a a mistake
mistake inin data
data entry,
entry, he/
he/
she
she can can withdraw
withdraw the the application
application (using
(using the
the button
button onon the
the
beneficiary
beneficiary profile
profile page)
page) and and make
make required
required corrections.
corrections.
This
This can can only
only bebe done
done tilltill the
the record
record isis not
not approved
approved by by
Sanctioning
Sanctioning Officer.
Officer.

Q.20.
Q.20. What
What can
can be
be done
done if
if the
the Scheme
Scheme facilitator
facilitator has
has made
made
aa data
data entry
entry error
error and
and the
the Sanctioning
Sanctioning Officer
Officer has
has
approved the record?
approved the record?

Ans.20.
Ans.20. IfIf the
the Sanctioning
Sanctioning Officer
Officer hashas approved
approved thethe record,
record, there
there
is
is nono way
way ofof recalling
recalling the
the approved
approved record.
record. The
The record
record will
will
only
only come
come backback in
in the
the correction
correction queue
queue inin case
case there
there isis an
an
authentication
authentication failurefailure from
from UIDAI
UIDAI oror PFMS
PFMS and
and the
the record
record
can
can be be updated
updated then.
then. Such
Such errors
errors should
should be be avoided
avoided as as
these
these errors
errors cannot
cannot be be rectified.
rectified.

Q.21.
Q.21. Where
Where are
are records
records sent
sent for
for correction
correction by
by Sanctioning
Sanctioning
Officer
Officer visible?
visible?

Ans.21.
Ans.21. IfIfaa Sanctioning
Sanctioning Officer
Officer has
has sent
sent an
an application
application for
for correction,
correction,
itit will
will be
be visible
visible inin the
the correction
correction queue
queue ofof the
the Scheme
Scheme
Facilitator
Facilitator User’s
User’s login.
login.

Q.22.
Q.22. What
What steps
steps to
to follow
follow if
if the
the Sanctioning
Sanctioning Officer
Officer finds
finds a
a
discrepancy
discrepancy in
in the
the records
records and
and wants
wants to
to correct
correct it?
it?

Ans.22.
Ans.22. IfIf aa Sanctioning
Sanctioning Officer
Officer finds
finds that
that any
any particular
particular application
application
of
of a a beneficiary
beneficiary requires
requires correction,
correction, they
they can
can select
select
the ‘Correct’ button to send it back
the ‘Correct’ button to send it back to the Scheme to the Scheme
Facilitator
Facilitator highlighting
highlighting the
the discrepancy
discrepancy found
found requiring
requiring
correction.

12
12
Q.23.
Q.23. How
How can
can the
the applications
applications in
in correction
correction queue
queue be
be
corrected?
corrected?
Ans.23.
Ans.23. Applications
Applications can
can appear
appear for
for correction
correction after
after approval/
approval/
authentication/
authentication/ payment
payment process
process failure:-
failure:-

•* Application
Application sent
sent for
for correction
correction by
by sanctioning
sanctioning officer;
officer;

•© PMMVY
PMMVY eligibility
eligibility failure;
failure;

•© PFMS
PFMS beneficiary
beneficiary registration
registration failure
failure or
or payment
payment failure;
failure;

•© UIDAI
UIDAI failure
failure –
= Beneficiary
Beneficiary or
or Husband
Husband Aadhaar;
Aadhaar;

The
The applications
applications can
can bebe rectified
rectified if
if DEO
DEO wrongly
wrongly enters
enters data
data
or
or if
if the
the beneficiary
beneficiary hashas provided
provided incorrect
incorrect details.
details. DEO
DEO
can
can correct
correct information
information by by going
going toto correction
correction queue
queue and
and
amend
amend respective
respective info.
info.

Q.24.
Q.24. The
The records
records rejected
rejected by
by Sanctioning
Sanctioning Officer
Officer are
are not
not
visible
visible in
in correction
correction queue.
queue. Why?
Why?

Ans.24.
Ans.24. IfIf aa Sanctioning
Sanctioning Officer
Officer rejects
rejects aa case,
case, it
it will
will not
not be be visible
visible in
in
the
the correction
correction queue.
queue. It It is
is deemed
deemed rejected
rejected forfor the
the scheme
scheme
for
for thatthat particular
particular instalment.
instalment. If If a
a Sanctioning
Sanctioning Officer
Officer wants
wants
to
to sendsend a a record
record for
for correction,
correction, S/he
S/he will
will have
have toto select
select the
the
‘Correct’
‘Correct’ optionoption in
in the
the approval
approval queue.
queue.

Q.25.
Q.25. Where
Where areare records
records which
which have
have failed
failed UIDAI
UIDAI or
or PFMS
PFMS
verification
verification visible?
visible?

Ans.25.
Ans.25. IfIf aa record
record fails
fails verification
verification from
from UIDAI
UIDAI oror PFMS,
PFMS, it
it will
will be
be
visible
visible in in the
the correction
correction queue
queue ofof the
the Scheme
Scheme Facilitator
Facilitator
User’s
User’s login,
login, with
with the
the appropriate
appropriate reason.
reason.

Q.26.
Q.26. How
How can
can the
the applications
applications rejected
rejected by
by PFMS
PFMS be
be
corrected?
corrected?
Ans.26.
Ans.26. Application
Application rejected
rejected by
by PFMS
PFMS are
are available
available in
in the
the correction
correction
queue
queue available
available toto DEO.
DEO. Applications
Applications can can bebe corrected
corrected
by
by opening
opening thethe form
form andand rectifying
rectifying the
the information
information asas
required.
required.

13
13
Q.27.
५.27. Can
Can SNO
SNO see
see which
which beneficiary’s
beneficiary’s which
which instalment
instalment
has
has come
come back
back in
in the
the ESCROW
ESCROW Account?
Account?
Ans.27.
Ans.27. The
The State/UT
State/UT can
can check
check payment
payment failure
failure list
list in
in the
the PFMS’
PFMS’
EP12
EP12 report
report after
after logging
logging into
into PFMS
PFMS website
website using
using the
the
State/UT
State/UT PMMVY
PMMVY scheme
scheme manager’s
manager’s login.
login.

Q.28.
Q.28. PMMVY-CAS
PMMVY-CAS showsshows that
that the
the beneficiary
beneficiary has
has been
been
paid
paid but
but the
the bank
bank account
account number
number is
is not
not the
the same
same as
as
registered
registered under
under PMMVY
PMMVY scheme?
scheme?

Ans.28.
Ans.28. As
As per
per DBT
DBT guidelines,
guidelines, payments
payments to
to beneficiary
beneficiary can
can be
be made
made
through
through two
two methods:
methods: --


e Bank
Bank Account
Account based
based payment;
payment;


. Aadhaar
Aadhaar Based
Based Payment;
Payment;

In
In Aadhaar
Aadhaar basedbased payment
payment the the money
money is is transferred
transferred to to the
the
latest
latest Aadhaar
Aadhaar Seeded
Seeded BankBank Account
Account ofof the
the Beneficiary.
Beneficiary. At At
the
the time
time of of registration,
registration, beneficiaries
beneficiaries whowho areare providing
providing
Aadhaar
Aadhaar as as an
an identification
identification proof
proof should
should be be made
made awareaware ofof
the
the same.
same. In In these
these cases,
cases, beneficiaries
beneficiaries should
should be be asked
asked toto
update
update thethe passbook
passbook of of bank
bank account
account which
which is is last
last seeded
seeded
with
with her
her Aadhaar
Aadhaar card.
card.

Q.29.
Q.29. Can
Can we
we generate
generate our
our own
own codes
codes for
for Villages
Villages which
which are
are
not
not present
present in
in LGD?
LGD?

Ans.
Ans. 29.
29. No.
No. TheThe Village
Village code
code and and name
name mustmust be be taken
taken from
from
the
the Government
Government Local
Local Government
Government Directory
Directory portal
portal
(http://lgdirectory.gov.in/) only.
(http://lgdirectory.gov.in/) only. Self-generated
Self-generated IDs IDs are
are not
not
acceptable,
acceptable, and and will
will lead
lead toto system
system errors.
errors. It
It is
is advised
advised
to
to kindly
kindly highlight
highlight the
the issue
issue with
with the
the Ministry
Ministry of
of Panchayati
Panchayati
Raj
Raj at
at state
state level,
level, and
and leave
leave out
out field
field functionary
functionary datadata for
for
such
such villages.

14
14
ANNEXURE
ANNEXURE I| -- PMMVY
PMMVY Eligibility
Eligibility Conditions
Conditions
Table
Table I| =– Scheme
Scheme Conditions
Conditions
Instalment
ES Conditions
Conditions Documents
Documents Required
Required Amount
Amount
(In
(In `2))
First
First Requires
Requires •¢ Duly
Duly filled
filled `T 1,000
1,000
Instalment
Instalment mother
mother to:-
to:- Application
Application Form
Form 1A
1A

Register
Register her
her •* Copy
Copy of
of MCP
MCP Card
Card
pregnancy
pregnancy
in the
in the MCP
MCP •¢ Copy
Copy of
of Identity
Identity
card along
card along Proof
Proof
with
with required
required
documents
documents •* Copy
Copy of
of Bank/
Bank/
within 150
within 150 Post
Post Office
Office Account
Account
days from
days from LMP.
Lup. | Passbook
Passbook
Second
Second -- At least one
Atleast one | •» Duly
Duly filled
filled `T 2,000
2,000
Instalment
Instalment Ante
Ante Natal
Natal Application Form
Application Form 11BB
Check
Check Up Up
- Can be •¢ Copy
Copy of
of MCP
MCP Card
Card
- Can be
claimed
claimed postpost
180
180 days
days ofof
Pregnancy
Pregnancy
Third
Third •e Child
Child Birth
Birthisis | •¢ Duly
Duly filled
filled `TE 2,000
2,000
Instalment
Instalment registered.
registered. Application
Application Form
Form 1C
1C

•©ean
Child
Child has
has •* Copy
Copy of ८ Card
of MCP
MCP Card
received
first
first cycle
cycle ofof
immunizations
immunizations •¢ Copy
Copy of
of Aadhaar
Aadhaar ID
ID
of
of CG,
CG, OPV,
OPV,
DPT
DPT and
and •* Copy
Copy of
of Child
Child
Hepatatis
Hepatatis B. B. Birth
Birth Registration
Registration
Certificate
Certificate
•e Aadhaar
Aadhaar is is
mandatory
mandatory
in
in all
all states
states
except
except for
for
J&K,
J&K, Assam,
Assam,
Meghalaya
Meghalaya

Note
Note -- Beneficiaries
Beneficiaries who
who have
have received
received only
only the
the first
first instalment
instalment under
under the
the old
old
MBP
MBP (IGMSY)
(IGMSY) scheme
scheme cancan claim
claim only
only third
third Instalment
Instalment under
under the
the PMMVY
PMMVY scheme,
scheme,
subject
subject to
to meeting
meeting the
the criteria
criteria of
of PMMVY.
PMMVY.

15
15
Table
Table II
II -- First
First cycle
cycle of
of Immunization
Immunization

National
National Immunization
Immunization Schedule
Schedule (NIS)
(NIS) for
for infants:
infants:
First
First Cycle
Cycle of
of Immunization
Immunization
Vaccine
Vaccine When
When Dose
BI KBRoute | BS
Site
to
to give
give
BCG
BCG At
At birth
birth or
or 0.1
0.1 ml
ml (0.05
(0.05 | Intra-
Intra- Left
Left upper
upper arm
arm
as
as early
early as
as ml
ml until
until one
one | dermal
dermal
possible
possible till
till | month
month of of
one
one year
year of
of | age)
age)
age
age
Hepatitis
Hepatitis At
At birth
birth or
or 0.5
0.5 ml
ml Intra
Intra Anterolateral
Anterolateral
B-Birth
B-Birth dose
dose | as
as early
early as
as Muscular
Muscular | side
side of
of
possible
possible mid-thigh-Left
mid-thigh-Left
within
within 24
24
hours
hours
OPV-0
OPV-0 At
At birth
birth or
or 22 drops
drops Oral
Oral Oral
Oral
as
as early
early asas
possible
possible
within
within thethe
first
first 15
15 days
days
OPV
OPV 1,2
1,2 &3
&3 | At 6 weeks, | 22 drops
At6weeks, drops Oral
Oral Oral
Oral
10
10 weeks
weeks
and
and 14
14
weeks
weeks
DPT
DPT 1,2
1,2 &3
&3 | At
At66 weeks,
weeks, | 0.5
0.5 ml
ml Intra
Intra Anterolateral
Anterolateral
10
10 weeks
weeks Muscular
Muscular | side
side of
of
and
and 14
14 mid-thigh
mid-thigh
weeks
weeks
Hepatitis
Hepatitis BB At
At 66 weeks,
weeks, | 0.5
0.5 ml
ml Intra
Intra Anterolateral
Anterolateral
1,2
1,2 &3
&3 10
10 weeks
weeks Muscular
Muscular | side
side of
of
and
and 1414 mid-thigh
mid-thigh
weeks
weeks
Pentavalent
Pentavalent | At
At 6
6 weeks,
weeks, | 0.5
0.5 ml
ml Intra
Intra Anterolateral
Anterolateral
1,2
1,2 &3
&3 10
10 weeks
weeks Muscular
Muscular | side
side of
of
and
and 14
14 midthigh-Left
midthigh-Left
weeks
weeks

16
16
|) 1
ii

SD
सत्यमेव जयते

Ministry of Women and Child Development


Government of India
New Delhi

www.wcd.nic.in

$m
एक कदम स्वच्छता की ओर

You might also like