The result of meeting in 3rd November 2017 with Mr. Xue and Mr.
Ong and Mr. Yongky agreed for the vessel to be fully modified on the
field of Construction of the ladder, production pipe along with the
Separator Grader so the tin ores could be optimally extracted.
After the Tin Dredger being departed from dry dock, then sea trial will
be initiated, and if the vessel perform well, then it could depart to
Bangka, Indonesia. With notes that the vessel has change its flag,
class and port register along with other necessary documents.
Furthermore, before initiating reconstruction, PT. RJM/PT. Rihans
Jasatama Mandiri must do the Drawing & System of the Zig in which
we must acquire permit from vessel owner.