3 ½ Hours
7200 GUIDE
Special Procedure Overview
Reminders Instructions & Explanations
Hand Protection OPERATOR HELPER
Required
1 Check Documentation 1 Check Documentation
Hearing
protection Required
1.1 Check Schedule for Next Order. 1.1 Check Schedule for Next Order.
Eye protection
Required
1.2 Locate Run Sheet and Tooling. 1.2 Get Order Package from Production
Control. 1
1.3 Check for compound change.
Electrical
hazard
Locking & 2 Locate Strand 2 Locate Strand
tagging required
2.1 Calculate Run Time. 2.1 Locate Shutdown Wire.
! Hot Water 2.2 Turnoff compound accordantly. 2.2 Locate Startup Lead Line.
and Steam.
2.3 Locate New Order wire.
i1 Higher 2.4 Helper Check the Strand OD to the
temperature reduces
Operator.
center movement.
2.5 Get Auxiliary Seals 1
1 Shift Lead-man
2.6 If Filled Strand Clean and Prepare End.
Obtain all tools &
materials listed on 2
reverse side
1 Related MSD
documents. 3 Head Preparation 3 Head Preparation
1 Pre-heater
3.1 Operator setup Auxiliary Head.
operation procedure. 3.2 Start Assembling at least 3 hrs before
actual changeover begins.
2 Pre-heater
operation procedure 3.3 Put Auxiliary Head on Cart.
3.4 Pre-heat Auxiliary Head at 250°F i1
1
!
3.5 Start pre-heating 1 hr before actual
changeover begins.
Calculate Time
Check Schedule
Turn of Compound as
Required Pre-heat Head at
250ºF
Helper - Start
Helper - End