Below is the detailed information of the executed projects, technical details, esteemed clients and owners,
schedule and also with PO values. Kindly note that
Intent of sharing this information is to build your confidence and trust in the freelancing work. Some of
the work was done remotely and on companies laptop to access the analysis software.
Freelancer Pipe Stress-Past Project Record
S. No Project Name Project Scope Details Location Company Client Period Status
Assiut Hydro Assiut Hydro cracker Technip 2022-
1. - ADNOC Closed
cracker Complex Complex energies 2023
Project Scope:
Review and update of Caesar II files,
Support selection & markup from 3D model as per support standard,
Isometrics check.
Duration:
4 months
Output:
More than 100 critical piping systems reviewed and updated having following equipment
o Pumps
o Heaters (600C)
o Tanks
o Turbine (400C)
o Exchangers
Freelancer Pipe Stress-Past Project Record
S. No Project Name Project Scope Details Location Company Client Period Status
2. Bridge Piping Offshore India ADNOC RINA 2021-22 Closed
Project Scope:
Stress Analysis for bridge piping
Offshore Project
Duration:
1 month
Output:
Stress Analysis Reports
Freelancer Pipe Stress-Past Project Record
S. No Project Name Project Scope Details Location Company Client Period Status
3. KBR inhouse Stress Analysis India Sayantric KBR 2022-23 Closed
Project Scope:
Stress Analysis for approx 10 Critical piping systems
High temperature piping
Exapnsion joints
Duration:
1 month
Output:
Caesar Files
Freelancer Pipe Stress-Past Project Record
S. No Project Name Project Scope Details Location Company Client Period Status
9mmtpa crude 2022-
4. Crude Pipeline (48” India Sayantric McDermott Open
complex 2023
Project Scope:
Stress Analysis of More than 50 Critical Piping Systems
AG/UG interface
Big bore pipeline 48-60 inch pipe size
Dynamic Analysis (response spectrum)
Duration:
9 months
Output:
7 piping systems completed with following equipment
o Pumps
o PL/PR
Freelancer Pipe Stress-Past Project Record
Freelancer Pipe Stress-Past Project Record
S. No Project Name Project Scope Details Location Company Client Period Status
Stress Analysis Stress Analysis (skid) Saudi
5. NOW Techpennar 2020-21 Closed
Arabia
Project Scope:
Stress Analysis for approx 10 Critical piping systems
Mechanical Skid piping
Duration:
6 month
Output:
Stress Analysis Reports
Freelancer Pipe Stress-Past Project Record
S. No Project Name Project Scope Details Location Company Client Period Status
Reactor Stress Reactor Stress Analysis G4 INSIGHTS G4 INSIGHTS
6. Canada 2021-22 Closed
Analysis (pump Vessel) INC INC
Project Scope:
Stress Analysis for approx 5 Critical piping systems
Stress Analysis for Reactor piping (650C)
Duration:
1 month
Output:
Stress Analysis Reports
Freelancer Pipe Stress-Past Project Record
Status
Project Name Project Scope Details Location Company Client Period
S. No
South
7. HDPE Pipe Surge and stress Mechanica Aneeq 2023 Closed
Africa
Project Scope:
Stress Analysis of pipeline 10KM
Duration:
1 month
Output:
Stress Analysis Report in Caesar II
Freelancer Pipe Stress-Past Project Record
S. No Project Name Project Scope Details Location Company Client Period Status
Hosadurga Surge and stress 2023-
8. India KBEC Mandeep Open
Pipeline project (part 1 of 3) 2024
Project Scope:
Stress Analysis of pipeline 75KM
Duration:
2 months
Output:
Stress Analysis Report in Caesar II
Freelancer Pipe Stress-Past Project Record
Freelancer Pipe Stress-Past Project Record
S. No Project Name Project Scope Details Location Company Client Period Status
9. Pump Piping Pump Piping Canada - Alberto 2022-23 Closed
Project Scope:
Stress Analysis update from Exisitng Autopipe Report
Duration:
1 month
Output:
Stress Analysis Report in Caesar II
Freelancer Pipe Stress-Past Project Record
S. No Project Name Project Scope Details Location Company Client Period Status
Cybertruck Melt
10. Hot oil System Texas-USA Tesla Amish Patel 2022-23 Closed
Shop
Project Scope:
Stress Analysis for approx 20 Critical piping systems
Duration:
2 month
Output:
Stress Analysis Reports