You are on page 1of 195

DEFINITIEF ONTWERP

BEREKENING HOUTHAVEN AANLANDING


ONTWERP AFMEERVOORZIENINGEN
AFMEERVOORZIENINGEN

GEMEENTELIJK VERVOER
VERVOERBEDRIJF
BEDRIJF AMSTERDAM

18 november 2014
078153168
078153168:A.2 - Definitief
C03051.000047.0200
Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

Inhoud

1 Introductie ............................................................................................................................................................. 5
1.1 Inleiding ...................................................................................................................................................... 5
1.1 Status document ........................................................................................................................................ 6
1.2 Leeswijzer ................................................................................................................................................... 6
1.3 Gehanteerde documenten, normen en software.................................................................................... 6
1.3.1 Gehanteerde documenten ..................................................................................................... 6
1.3.2 Normen en richtlijnen ........................................................................................................... 6
1.3.3 Software .................................................................................................................................. 6

2 Lay-out ................................................................................................................................................................... 8
2.1 Locatie afmeer palen ................................................................................................................................. 8

3 Ontwerpuitgangspunten .................................................................................................................................... 9
3.1 Veiligheidsniveau ...................................................................................................................................... 9
3.2 Uitgangpunten ........................................................................................................................................... 9
3.2.1 Materiaal eigenschappen ...................................................................................................... 9
3.2.2 Maatgevend schip .................................................................................................................. 9
3.2.3 Water en bodem niveaus .................................................................................................... 10
3.2.4 Grondopbouw en grondparameters ................................................................................. 10
3.2.5 Belasting factoren................................................................................................................. 12
3.2.6 Belastingen............................................................................................................................ 12
3.2.7 Berekeningsmethode ontwerp palen voor afmerenergie ............................................... 12
3.2.8 Corrosie ................................................................................................................................. 12

4 Berekening .......................................................................................................................................................... 13
4.1 Afmeerpaal 02 .......................................................................................................................................... 13
4.1.1 Afmetingen ........................................................................................................................... 13
4.1.2 Afmeerenergie ...................................................................................................................... 13
4.1.3 Berekening ............................................................................................................................ 13
4.1.4 Conclusie berekeningen ...................................................................................................... 14
4.2 Remmingwerk 02 ..................................................................................................................................... 14
4.2.1 Uitgangspunten.................................................................................................................... 14
4.2.2 Berekening ............................................................................................................................ 15
4.2.3 Conclusie berekeningen ...................................................................................................... 17
4.3 Afmeerpalen achter ponton.................................................................................................................... 17
4.3.1 Afmetingen buizen .............................................................................................................. 18
4.3.2 Afmeereergie ........................................................................................................................ 18
4.3.3 Berekening ............................................................................................................................ 18
4.3.4 Conclusie berekeningen ...................................................................................................... 19

5 Samenvatting ontwerp ...................................................................................................................................... 20

Bijlage 1 Ontvangen documenten ............................................................................................................. 22

078153168:A.2 - Definitief ARCADIS 3


Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

Bijlage 2 Grond parameters........................................................................................................................ 23

Bijlage 3 Berekening afmeerpaal .............................................................................................................. 24


Bijlage 3.1 Dsheet berekening bovengrens .................................................................................................. 25
Bijlage 3.2 Dsheet berekening ondergrens ................................................................................................... 26
Bijlage 3.3 Controle lokale plooi.................................................................................................................... 27

Bijlage 4 Berekening remmingwerk ......................................................................................................... 28


Bijlage 4.1 SCIA engineer sondering S02 ..................................................................................................... 29
Bijlage 4.2 SCIA engineer sondering S07 ..................................................................................................... 30
Bijlage 4.3 Energie beschouwing randpaal en plooi controle buis ........................................................... 31

Bijlage 5 Palen achter ponton .................................................................................................................... 32


Bijlage 5.1 SCIA Engineer berekening .......................................................................................................... 33
Bijlage 5.2 Energie beschouwing en plooi controle buis ............................................................................ 34

Colofon ...................................................................................................................................................................... 35

4 ARCADIS 078153168:A.2 - Definitief


Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

1 Introductie

1.1 INLEIDING

Ten behoeve van de aanlanding in de Houthaven te Amsterdam is een constructie voorgesteld die
indicatief is weergegeven in het onderstaande figuur 1-1.

Figuur 1-1: Overzicht pontaanlanding

078153168:A.2 - Definitief ARCADIS 5


Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

De constructie bestaat uit een drijvend ponton die aan de achterzijde gesteund wordt door een rij palen.
Aan de voorzijde is per ligplaats (2x) voorzien in een remmingwerk en een meerpaal.
In het onderliggende rapport wordt het ontwerp van de afmeerpalen en het remmingwerk uitgevoerd
voor het maatgevende scheepstype Ponttype 20. Daarbij wordt voor de buitenafmetingen van de diverse
elementen in beginsel uitgegaan van de afmetingen ter plaatse van de aanlanding NDSM.

1.1 STATUS DOCUMENT

In dit document worden op basis van de beschikbare gegevens van de ondergrond en de geldende
normen de hoofdafmetingen van de afmeerpalen en het remmingwerk bepaald. Het (detail)ontwerp van
overige onderdelen en voorzieningen van de aanlanding maakt geen deel uit van dit rapport.

1.2 LEESWIJZER

In hoofdstuk twee is de lay-out van de nieuwe binnenvaarsteiger en de locatie van de afmeerpalen


weergegeven.

In hoofdstuk drie zijn de belangrijke ontwerpuitgangspunten opgesteld.

In hoofdstuk vier wordt het ontwerp van de afmeerpaal en het remmingwerk uiteen gezet.

In hoofdstuk vijf worden de resultaten samengevat. Voor een overzicht van de gehanteerde documenten
wordt verwezen naar paragraaf 1.3.

1.3 GEHANTEERDE DOCUMENTEN, NORMEN EN SOFTWARE

1.3.1 GEHANTEERDE DOCUMENTEN

(A) Sonderingen;
(B) Locatie sonderingen;
(C) Funderingsadvies, aanvaarconstructie NDSM-Werf, te Amsterdam, 11 – 08 2013.
(D) Berekening remmingpalen, Bam infra, 18-06-2014
(E) Tekening 001-B-VG,Tijdelijke pontaanlanding Plaatkade, 04-11-2014
(F) DO Berekening Meerpalen, palen boothuis en opsteiger, 14022-BER-04-A, 21-10-2014

Documenten A tot en met D worden bijgevoegd in bijlage 1 van dit rapport

1.3.2 NORMEN EN RICHTLIJNEN

(1) NEN-EN 1997-1, Geotechnisch ontwerp, Deel 1: Algemene regels;


(2) NEN 9997 nl, Geotechnische grondconstructies, Deel 1: Algemene regels;
(3) EAU 2012;
(4) SBRCURnet publication 211 E, Quay Walls, second edition
(5) NEN-EN 1990 Grondslagen van het constructief ontwerp

1.3.3 SOFTWARE

D-Sheet Piling, module Single Pile;

6 ARCADIS 078153168:A.2 - Definitief


Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

Excel;
Mathcad;
SCIA Engineer 14.

078153168:A.2 - Definitief ARCADIS 7


Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

2 Lay-out

2.1 LOCATIE AFMEER PALEN

De locatie van de afmeerpalen, remmingwerk en sonderingen is weergegeven in


Figuur 2-1

Remmingwerk 02

Remmingwerk 01

Afmeerpaal 02

Afmeerpaal 01

Ponton palen

Figuur 2-1: Afmeervoorzieningen

8 ARCADIS 078153168:A.2 - Definitief


Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

3 Ontwerpuitgangspunten

3.1 VEILIGHEIDSNIVEAU

In de geldende eurocodes wordt een onderscheid in constructies gemaakt. Dit onderscheid gebeurd door
de constructies in verschillende veiligheidsklasse in te delen (5). De veiligheidsklasse maakt een
onderscheid tussen constructies waar schade leidt tot (veel) economische kosten dan wel menselijk letsel.
De nieuwe meerpalen en remmingwerk zijn ingedeeld in RC2 (hier vallen de meeste constructies onder).

De berekening wordt uitgevoerd met een onder- en bovengrens benadering. Deze grenzen worden
gedefinieerd om de heterogeniteit van de ondergrond in rekening te brengen.

3.2 UITGANGPUNTEN

3.2.1 MATERIAAL EIGENSCHAPPEN

In het ontwerp wordt uitgegaan van een staal kwaliteit niet lager dan S355 en maximaal X70
(staalkwaliteit van buispalen).

3.2.2 MAATGEVEND SCHIP

Type: Ponttype 20
Lengte: 47,0 meter
Breedte: 13,0 meter
Diepgang: 2,0 meter
Block factor: 0,41
Afmeersnelheid: 1,94 m/s
Afmeerhoek: 30 graden

Deze gegevens zijn bepaald op basis van document (D). Snelheid van 1,94m/s wordt beschouwd als een
extreem geval waardoor voor de hiermee gepaard gaande abnormale energie een veiligheidsfactor van 1
wordt gehanteerd.

Afmeerspecificaties:
Zelfstandig afmeren;
Contact op circa 1/6 van lengte schip ter plaatse van remmingwerk en afmeerpaal;
Afmeerenergie grijpt aan op 0,50 m + NAP conform document (D).

078153168:A.2 - Definitief ARCADIS 9


Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

3.2.3 WATER EN BODEM NIVEAUS

Waterpeil -0,40 m + NAP


Bodem niveau wordt bepaald conform de aangeleverd sonderingen.

3.2.4 GRONDOPBOUW EN GRONDPARAMETERS

Uit document (A) en (B) worden de sonderingen S02 en S07 als maatgevend beschouwd. Op basis van
deze sonderingen wordt de volgende bodemopbouw opgesteld voor de dimensionering van de meerpalen
(zie bijlage 2).

Grondsoort Bovenkant nat c qc


EMenard
laag
3
[m+NAP] [kN/m ] [°] [kN/m²] [MPa] [kN/m²]
1 Klei -7,5 17 17,5 0 0,5 1250
2 Zand, zwak ziltig -12,5 20 30 0 10 8500
3 Zand matig tot vast -14,5 20 32,5 0 17 14450
4 Zand kleiig -15,5 20 25 0 5 4250
5 Veen -16,0 15 15 5 1 3500
6 Zand matig tot vast -18,0 20 32,5 0 22 18700
7 Klei -27,0 18 22,5 10 2 5000

Tabel 3-1: Grondopbouw, representatieve waardes [BGT] sondering 02

Voor remminwerk 2 moet ook rekening gehouden worden met sondering S07 die maatgevend is voor het
bepalen van de inheidiepte van de palen, dit als gevolg van slappe grond tot -19m + NAP (zie bijlage 2).

Grondsoort Bovenkant nat c qc


EMenard
laag
3
[m+NAP] [kN/m ] [°] [kN/m²] [MPa] [kN/m²]
1 Klei -7.5 17 17.5 0 0.50 1250
2 Klei, zwak zandig -16.0 18 22.5 0 1.00 2500
3 Zand, matig kleiig -19.5 20 25.0 0 8.00 6800
4 Zand, matig tot vast -21.0 20 32.5 0 18.00 15300
5 Klei -27.5 18 22.5 10 2.00 5000

Tabel 3-2: Grondopbouw, representatieve waardes [BGT] sondering 07

Om de E modulus van Ménard te bepalen wordt het volgende gehanteerd. Emenard = *qc, waarin
afhankelijk is van de grondsoort zoals aangegeven in de onderstaande tabel. De berekende EMenard is een
ondergrens om de horizontale bedding (stijfheid) te bepalen.

Grondsoort
Veen 3,5
Klei 2,5
Leem 1,5
Zand 0,85

Tabel 3-3: Factor afhankelijk van de aanwezige grondsoort

10 ARCADIS 078153168:A.2 - Definitief


Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

Ten behoeve van de veiligheidsfactoren voor de grondparameters wordt uitgegaan van NEN 9997 voor
een veiligheidsklasse RC2. Onderstaande tabel geeft de bijbehorende veiligheidsfactoren.

Grond parameter Symbool M2


Hoek van inwendige wrijving * 1,25
Effectieve cohesie c c' 1,45
Volumiek gewicht 1,00
E / kh Cp 1,30

Tabel 3-4: Veiligheidsfactoren conform NEN 9997 voor RC2 van tabel A.4a, algehele stabiliteit/tabel A.4c

*Veiligheidsfactor over tan( )

Om een onder- en bovengrens voor de grondparameters te bepalen wordt het volgende aangehouden;
Ondergrens: lage waarden van de grond parameters conform de veiligheidsfactoren weergegeven in
tabel 3-2;
Bovengrens: grondparameters bepaald volgens tabel 3-1 en verhoogd met 10 %.

Voor het bepalen van de horizontale bedding coëfficiënt, conform Ménard, worden de volgende
uitgangspunten gehanteerd:
Ménard definieert een ondergrens voor de horizontale bedding coëfficiënt in de gebruikstoestand
[BGT];
De op deze manier bepaalde waarden zijn geldig voor de BGT. Om de boven en ondergrens in de
uiterste grens toestand [UGT] te bepalen moet de ondergrens gedeeld worden door 1,3 en de
bovengrens vermenigvuldigd worden met 1,69 volgens CUR 166 deel 1 artikel 3.3.3
(kh.high = kh.low * 1,3 * 1,3 = kh.low * 1,69 [1,3 voor gemiddelde en 1,3 voor bovengrens]).

Ondergrens Bovengrens
Grondsoort c' EMenard c' EMenard
[°] [kPa] [kN/m²] [°] [kPa] [kN/m²]
- - Arctg ( tg( ) / ) c’ / c' EMenard/1,3 * 1,1 c’ * 1,1 EMenard *1,69

Tabel 3-5: Bepaling grond parameters voor UGT, ondergrens en bovengrens

Ondergrens Bovengrens
Grondsoort c EMenard c EMenard
[°] [kN/m²] [kN/m²] [°] [kN/m²] [kN/m²]
1 Klei 14,0 0,0 960 19,3 0 2.110
2 Zand, zwak ziltig 24,0 0,0 6.540 33,0 0 14.370
3 Zand matig tot vast 26,0 0,0 11.120 35,8 0 24.420
4 Zand kleiig 20,0 0,0 3.270 27,5 0 7.180
5 Veen 12,0 3,4 2.690 16,5 5,5 5.920
6 Zand matig tot vast 26,0 0,0 14.380 35,8 0 31.600
7 Klei 18,0 6,9 3.850 24,8 11 8.450

Tabel 3-6: Boven en ondergrens grondparameters en bedding voor UGT sondering S02

078153168:A.2 - Definitief ARCADIS 11


Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

Ondergrens Bovengrens
Grondsoort c EMenard c EMenard
[°] [kN/m²] [kN/m²] [°] [kN/m²] [kN/m²]
1 Klei 14,0 0,0 960 19,3 0 2.110
2 Klei, zwak zandig 18,0 0,0 1.920 24,8 0 4.230
3 Zand, matig kleiig 20,0 0,0 5.230 27,5 0 11.490
4 Zand, matig tot vast 26,0 0,0 11.770 35,8 0 25.860
5 Klei 18,0 14,5 3.850 24,8 11 8.450

Tabel 3-7: Boven en ondergrens grondparameters en bedding voor UGT sondering S07

3.2.5 BELASTING FACTOREN

Voor de belasting factoren wordt verwijzen naar de EAU 2012 artikel 13. Conform deze aanbeveling wordt
de belastingfactor voor afmeerenergie gelijk aan 1.

3.2.6 BELASTINGEN

De volgende belastingen worden gehanteerd:


Afmeer energie:
- Remmingwerk en afmeer paal: Afmeersnelheid _|_ remmingwerk is sin(30) * 1,94 = 0,97 m/s.
Afmeerenergie conform bijgevoegde rapport in bijlage 1wordt
212 kNm in de richting loodrecht op het remmingwerk en de
meerpaal

- Ponton afmeerpalen: Afmeersnelheid _|_ aan ponton is cos(30)*1,94=1,68 m/s


1/2*1.1*501*1.68^2=778 kNm (frontaal aanmeren van het schip).

3.2.7 BEREKENINGSMETHODE ONTWERP PALEN VOOR AFMERENERGIE

Voor de maatgevende normale en abnormale energie t.g.v. de verschillende ontwerpschepen wordt de


volgende werkmethode gehanteerd:
- Bepaling van de benodigde kracht voor de optredende energie met representatieve waarden van
de grond parameters;
- Met de representatieve kracht controleren van de paal met boven en ondergrens van de
grondparameters. Voor de ondergrens wordt de representatieve waardes beschouwd vanwege het
kortdurend karakter van het afmeren (stijver grondgedrag, conservatief voor
afmeerberekeningen).

3.2.8 CORROSIE

Er wordt geen rekening gehouden met corrosie toeslag gezien het feit dat de constructie in beginsel
slechts enkele jaren (3 tot 4) moet functioneren. De locatie daar geeft gezien de saliniteit van het water
tevens geen aanleiding tot corrosietoeslag.

12 ARCADIS 078153168:A.2 - Definitief


Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

4 Berekening

4.1 AFMEERPAAL 02

4.1.1 AFMETINGEN

Buis: 1.220mm x 25mm


Staal kwaliteit: X65
fy: 450 N/mm²

4.1.2 AFMEERENERGIE

Voor de controle van de energie opname wordt rekening gehouden met de volgende waardes:
Afmeer energie: 212 kNm

Energie Tolerantie: 98% 102%


normaal 212 kNm 207,8 216,2

4.1.3 BEREKENING

De resultaten van de controle wordt in de volgende tabellen aangegeven.

Afmeer energie Ondergrens Bovengrens


Belasting F in model [kN] 895 925
Water niveau -0,40 + NAP -0,40 + NAP
Vaste bodem -7,5 +NAP -7,5 +NAP
Verpl. tpv aangrijpspunt [mm] 473 457
Einwendig (= ½ . F . d ) 211.6 211.4
Einwendig Eschip OK OK
M representatief [kNm] 11355 11776
Spanning [MPa] 413 428.6
Ctrl spanning [MPa] 0.92 0.95

Tabel 4-1: Overzicht van resultaten voor de controle van normale energie

De maximale UC van de staal spanning in dit geval is 0,95 1 voldoet .

Met het maximale moment wordt een controle van plooi conform document (4). Dit geeft een Unity Check
van 0,82 1 voldoet.

078153168:A.2 - Definitief ARCADIS 13


Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

Bijlage 3 bevat de D-Sheet Single Pile berekening (boven- en ondergrens) en Mathcad sheet t.b.v. controle
van plooi.

4.1.4 CONCLUSIE BEREKENINGEN

Op basis van de toetsingen zijn de volgende keuzen gemaakt:

Afmeerpaal opgesteld met de volgende buizen


1.220x25 X65, met bovenkant op +1,50m + NAP en onderkant op -22,5 m + NAP

4.2 REMMINGWERK 02

4.2.1 UITGANGSPUNTEN

De berekening voor het remmingwerk is uitgevoerd in SCIA Engineer conform het onderstaande model
(momentvast raamwerk) en de volgende uitgangspunten:
Aangrijpingspunt stootkracht: 0,5 + NAP (conform BAM gegevens)
Waterpeil: -0,40 + NAP
Bodem niveau: (conform sondering) -7,0 + NAP
H.o.h palen: (conform ontwerp Hakkers) 7 m
Verticale buizen: Ø914x22 X65
Horizontale buis: Ø762x25 X52

Figuur 4-1: Model in SCIA Engineer

Voor het starten van de berekening wordt een controle uitgevoerd van de gebruikte veren in SCIA
Engineer. Voor een losse paal Ø914x22 met een eenheidsbelasting aan de kop van 400 kN wordt een
vergelijking uitgevoerd voor het SCIA model en D-Sheet berekening.

14 ARCADIS 078153168:A.2 - Definitief


Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

Figuur 4-2: Resultaten SCIA Engineer / Dsheet voor representatief, laag bodem

In de volgende tabel worden de resultaten verkregen met het SCIA model en het D-Sheet Single Pile
model met elkaar vergeleken.

Afwijking [%]
SCIA D-Sheet
Situatie (Mscia-MDsheet)/Mdsheet*100
M [kNm] [mm] M [kNm] [mm] M [kNm] [mm]
Representatief 4.910 478,1 4.867 478,4 0,88 0,06

Tabel 4-2: Overzicht vergelijking SCIA Engineer en D-Sheet

De maximale afwijking is onder de 1% voor beide gevallen. De kleine afwijking van de resultaten van
SCIA Engineer ten opzichte van D-Sheet singel pile voor een alleenstaande paal geeft aan dat het
ontwerpen van het remmingwerk op basis van SCIA Engineer nauwkeurig genoeg is.

4.2.2 BEREKENING

Er wordt een controle uitgevoerd voor een aanvaring/belasting op de volgende locaties:


Aanvaring ter plaatse van de buitenste verticale buis (randpaal);
Aanvaring op het midden van de horizontale buis (gording);
Aanvaring op de middelste buis (middenpaal);
Er wordt een controle uitgevoerd op basis van sondering S02 ten behoeve van de sterkte van de paal
en horizontale buis;
Er wordt een controle op basis van sondering S07 uitgevoerd ten behoeve van het bepalen van de
paalpuntniveau van de paal.

Aanvaring ter plaatse van de buitenste verticale buis is maatgevend voor de verticale buis. Bij aanvaring
op het midden van de horizontale buis en middelste buis wordt gebruikt ter controle van de horizontale
buis

Voor de energie beschouwing wordt dezelfde energie gebruikt als bij afmeerpaal 02.

078153168:A.2 - Definitief ARCADIS 15


Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

Energie Tolerantie: 98% 102%


normaal 212 kNm 207.8 216.2

De controle van de energie wordt als volgt uitgevoerd:

Ten behoeve van de buitenste paal wordt een controle van de energie uitgevoerd door middel van een
Excel sheet waar rekening gehouden is met de parabolische vorm van de op te nemen energie. De
onderstaande figuur geeft het resultaat van deze analyse.

Figuur 4-3: Energie beschouwing randpaal

Ten behoeve van de controle van de horizontale buis wordt de energie geschematiseerd als een
driehoekige oppervlakte van de kracht als functie van de verplaatsing. Dit is iets conservatiever t.o.v
van de vorige benadering maar acceptabel voor deze controle. Onderstaande tabel geeft een resultaat
van de controle voor de horizontale buis.

16 ARCADIS 078153168:A.2 - Definitief


Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

Gording Middenpaal
HOOG (NL2) (NL3)

Belasting F in model [kN] 955 1055

Aantal belaste gordingen [-] 1 1

Verplaatsing in model [mm] 442 402

Einwendig (= ½ . F . ) 211.2 211.9

Eschip 212.0 212.0

Einwendig Eschip OK OK

Von-mises spanning [MPa] 198 220

UC voor X52 0.55<1, voldoet 0.61<1, voldoet

Tabel 4-3: Overzicht controle t.b.v. horizontale buis

Bijlage 4 toont een overzicht van SCIA Engineer voor de rekenwaarden voor de onder- en bovengrens van
de bodemopbouw en Excel sheet ten behoeve van het controle van de energie voor de buitenste paal.

4.2.3 CONCLUSIE BEREKENINGEN

Op basis van de toetsingen op zowel sterkte als plooi zijn de volgende keuzen gemaakt:

Remmingwerk opgesteld met de volgende buizen


Verticale palen: 914x22 X65, onderkant op -24,0 m + NAP
Horizontale buis: 726x25 X52

4.3 AFMEERPALEN ACHTER PONTON

Voor de controle van de afmeerpalen achter het ponton wordt in principe een gelijkwaardig model als bij
het remmingwerk gebruikt waarbij het horizontale element (ponton) als een vierkant stijf element zonder
gewicht is gemodelleerd. De koppelingen tussen dit element en de palen zijn hier scharnieren omdat het
ponton vrij kan bewegen.

In onderstaande figuur is het model aangegeven dat in SCIA wordt gebruikt. De belasting werkt tussen de
twee palen zoals aangegeven in de figuur. Afstand tussen de palen is : 9m / 11m / 9m

078153168:A.2 - Definitief ARCADIS 17


Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

Figuur 4-4: Model gebruikt in SCIA

4.3.1 AFMETINGEN BUIZEN

Buis: 1.220mm x 25mm


Staal kwaliteit: X70
fy: 485 N/mm²

4.3.2 AFMEEREERGIE

Voor de energie werkend op de constructie wordt aangehouden: 1/2*1.1*501*1.68^2=778 kNm (frontaal


aanmeren van het schip). Deze energie wordt verdeeld over de twee palen adie ter plaatse van de
aangrijpende belasting direct achter het ponton staan.

Energie Tolerantie: 98% 105%


normaal 778 kNm 762.4 816.9

4.3.3 BEREKENING

Voor SCIA berekening zie bijlage 5. Onderstaande figuur geeft de resultaten van de controle van de
energie voor de bovengrens die maatgevend is.

18 ARCADIS 078153168:A.2 - Definitief


Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

Figuur 4-5: Energie beschouwing randpaal

4.3.4 CONCLUSIE BEREKENINGEN

Bij de toetsing van de buizen is uitgegaan dat de buiten diameter van buis gelijk blijft en om te voldoen
aan de sterkte en plooi, de wanddikte van de buis te vergroten.

Op basis van de toetsingen zijn de volgende keuzen gemaakt:

Buis: Ø1.220x34 X70, onderkant op -22,5 m + NAP

078153168:A.2 - Definitief ARCADIS 19


Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

5 Samenvatting ontwerp

Uit de voorgaande hoofdstukken blijkt dat de afmeervoorziening ten behoeve van het maatgevende schip
als volgt zijn gedimensioneerd:

Afmeer paal 02: Ø1.220x25 X65, onderkant op -22,5 m + NAP.


Remmingwerk 02:
- Verticale palen: Ø914x22 X65, onderkant op -24,0 m + NAP
- Horizontale buis: Ø762x25 X52
- De verbinding tussen de verticale en horizontale buizen is momentvast.
- Hart op hart afstand palen is 7m
Palen achter ponton: Ø1.220x34 X70, onderkant op -22,5 m + NAP
Afstand tussen palen is 9m / 11m / 9m

Voor remmingwerk 01 en afmeerpaal 01 kan de ontwerpoplossing van document (F) gebruikt worden
omdat de sondering die is gebruikt in het ontwerp hiervan vergelijkbaar is met sonderingen in document
(C). De sonderingen in document (C) zijn de basis van de berekening uitgevoerd in document (F).

Bij de palen achter het ponton is het aan te bevelen om de diameter van de buis te vergroten aangezien de
benodigde wanddikte voor een buis Ø1.220mm 34mm is. Een mogelijke oplossing is een buis Ø1420x25
die nog als spiraalnaad gelaste buis uitgevoerd kan worden..

20 ARCADIS 078153168:A.2 - Definitief


Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

- Verticale palen: Ø914x22 X65, onderkant op -24,0 m + NAP


- Horizontale buis: Ø762x25 X52

Remmingwerk 02

Remmingwerk 01

01 Ontwerp conform document E

Afmeerpaal 02

Ø1.220x25 X65, onderkant op -22,5 m + NAP

Afmeerpaal 01

Ponton palen

ø1.220x34 X70, onderkant op -22,5 m + NAP of


Ø1420x25

Figuur 5-1: Overzicht toe te passen palen

078153168:A.2 - Definitief ARCADIS 21


Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

Bijlage 1 Ontvangen documenten

22 ARCADIS 078153168:A - Definitief


BAM Nelis De Ruiter bv Haarlemmerstraatweg 79, 1165 MK Halfweg / Postbus 14, 1160 AA Zwanenburg
Telefoon (020) 407 22 22 / Fax (020) 407 22 23 / www.bamnelisderuiter.nl
info@bamnelisderuiter.nl

Funderingsadvies
Aanvaarconstructie NDSM-werf,
te Amsterdam

MVE/BB130956.46267
ing. M. van Velzen

Opdrachtgever

GVB Exploitatie BV
T.a.v. de heer C. van der Werf
Arlandaweg 100
1043 HP Amsterdam

2 Concept 14 augustus 2013 MVE EVV EVV


Versie Status Datum vrijgave Auteur Paraaf Verificatie Paraaf Vrijgave Paraaf
BAM Nelis De Ruiter bv

Inhoud

1 Inleiding....................................................................................................................................3

2 Uitgangspunten .......................................................................................................................4
2.1 Technische en functionele eisen 4
2.1.1 Algemeen 4
2.1.2 Conservering 4
2.1.3 Meerpalen 4
2.1.4 Inrichting 4
2.2 Belastingen 5
2.3 Grondonderzoek 5
2.4 Waterstanden 5

3 Berekeningen...........................................................................................................................6
3.1 Algemeen 6
3.2 Steigerconstructie 6
3.2.1 Algemeen 6
3.2.2 Schotten 6
3.2.3 Dwarsliggers 7
3.2.4 Hoofdliggers 8
3.2.5 Funderingspalen 8
3.3 Aanvaarconstructie 10
3.3.1 Algemeen 10
3.3.2 Beschouwing aanvaarconstructie 10
3.4 Meerpalen 11
3.4.1 Algemeen 11
3.4.2 Beschouwing meerpalen 11
3.5 Remmingswerk 12
3.5.1 Algemeen 12
3.5.2 Beschouwing palen remmingswerk 12

4 Conclusies en aanbevelingen ............................................................................................. 14

Referenties ............................................................................................................................ 15

Bijlagen
Bijlage 1 Grondonderzoek
Bijlage 2 Beschouwing opneembaar moment houten schotten
Bijlage 3 Resultaten M-Foundation berekeningen
Bijlage 4 Botsingsenergie aanvaarconstructie v = 3 km/u en v = 4 km/u
Bijlage 5 Capaciteit paal aanvaarconstructie
Bijlage 6 Capaciteit paal aanvaarconstructie met corrosie
Bijlage 7 Botsingsenergie meerpaal v = 7 km/u
Bijlage 8 Capaciteit meerpaal
Bijlage 9 Capaciteit meerpaal met corrosie
BAM Nelis De Ruiter bv

Bijlage 10 Capaciteit paal remmingswerk


Bijlage 11 Capaciteit paal remmingwerk met corrosie
Bijlage 12 Situatietekening
Bijlage 13 Doorsnede A-A
BAM Nelis De Ruiter bv

1 Inleiding

Ter plaatse van de Ondinaweg, NDSM-Werf te Amsterdam-Noord is nu een tijdelijke


veeraanlanding voor twee veren aanwezig. GVB Veren is voornemens de pontaanlanding te
vernieuwen en tevens enkele meters te verplaatsen en geschikt te maken voor aanlanding van
drie veren. BAM Nelis de Ruiter heeft van GVB Exploitatie BV de opdracht ontvangen om een
voorontwerp te leveren van de aanlandingsconstructies.

Funderingsadvies Aanvaarconstructie NDSM-werf,

te Amsterdam / augustus 2013 3


MVE/BB130956.46267 versie 2 Concept
BAM Nelis De Ruiter bv

2 Uitgangspunten

2.1 Technische en functionele eisen

2.1.1 Algemeen
- Ontwerp conform vigerende normen en richtlijnen;
- Bij het ontwerp dient rekening te worden gehouden met een minimale waterdiepte van 4,0
m, waarbij rekening wordt gehouden met ontgronding door schroefwerking van minimaal
0,5 m;
- De pontonaanlanding dient geschikt te zijn voor het aanlanden van drie stuks standaard
IJveer 50-serie:
 Maximale diepgang inclusief roerpropeller 2,35 m;
 Waterverplaatsing leeg 145 ton;
 Waterverplaatsing vol 186 ton;
 Maximale vrijboord leeg 1,49 m;
 Minimale vrijboord vol 1,17 m;
- Het drijvende ponton van 30 m bij 10 m betreft een directielevering;
- Het ponton fungeert als een op- en afstapponton met een bijkomende functie van
aanvaarjuk;
- Levensduur van circa 25 jaar.

2.1.2 Conservering
Staalwerk:
- Coating doorzetten tot NAP -1,40 m;
- Voorbehandelen stralen SIS-Sa 2,5;
- Eén laag van minimaal 50 µm Sigma Universal Primer;
- Tweelagen van minimaal 100 µm per laag Sigma multiquard;
- Alle benoemde laagdikte zijn droge laagdikte.
Klein staalwerk:
- Uitvoeren in RVS, indien niet leverbaar, thermisch verzinken laagdikte 375 µm (conform
NEN-EN-ISO 1461).

2.1.3 Meerpalen
Aan de twee meerpalen, zie de situatietekening in bijlage 12, zijn enkele eisen verboden:
- Ten minste 2 m boven gemiddeld waterpeil, NAP +1,60 m.
- Afsluiten met een stalenplaat, plaat onder afschot zodat voorkomen wordt dat er water op
blijft staan;
- Meerpaal bovenop in het midden voorzien van zichtpaal ∅ 63 mm, lengte 3 m conserving
in signaalkleur geel RAL 1004;
- Conservering staalwerk uitvoeren in kleur zwart RAL 9004, bovenste meter conservering
uitvoeren in kleur wit RAL 9010.

2.1.4 Inrichting
- Steiger en/of ponton voorzien van lichtmasten conform NPR13201-1 verlichtingsklasse
S3;
- Op de steiger twee Passagiers Informatie Diplays’(PID) plaatsen;

Funderingsadvies Aanvaarconstructie NDSM-werf,

te Amsterdam / augustus 2013 4


MVE/BB130956.46267 versie 2 Concept
BAM Nelis De Ruiter bv

- Steiger voorzien van in totaal twee abri’s conform tekening 46267-TEK-007-000-DWB, zie
bijlage 4;
- Aan de kopse zijde van elk remmingswerk dient een aanvaarlamp, kleur geel, te worden
geplaatst.

2.2 Belastingen

De aanvaarconstructie dient te worden gedimensioneerd op de IJveer 50-serie met de


bovengenoemde specificaties met een aanmeersnelheid respectievelijk 3 à 4 km/uur.

De remmingswerken dienen te worden gedimensioneerd op de IJveer 50-serie met de


bovengenoemde specificaties met een aanvaarsnelheid van 7 km/uur bij een aanvaarhoek van
circa 30 graden. Deze situatie is een uitzondering, dus wordt gerekend met een belastingsfactor
van 1,0.

2
De steiger zal worden gedimensioneerd op een variabele belasting van 5 kN/m (representatief).

2.3 Grondonderzoek

Op de projectlocaties is een tweetal watersonderingen uitgevoerd, zie bijlage 1.

2.4 Waterstanden

Aan de hand van opgaaf zijn de volgende waterstanden als uitgangspunt te hanteren:
- Gemiddeld NAP -0,40 m;
- Hoog NAP -0,20 m;
- Laag NAP -0,50 m;

Funderingsadvies Aanvaarconstructie NDSM-werf,

te Amsterdam / augustus 2013 5


MVE/BB130956.46267 versie 2 Concept
BAM Nelis De Ruiter bv

3 Berekeningen

3.1 Algemeen

De constructie bestaat uit een drietal elementen met afzonderlijke belastinggevallen, namelijk:
- de steigerconstructie;
- de aanvaarconstructie;
- meerpalen;
- remmingswerk.
Voor de locaties van de bovengenoemde elementen zie bijlage 12 voor de situatie tekening.

3.2 Steigerconstructie

3.2.1 Algemeen
De steigerconstructie is een constructie tussen het ponton en de kade in. Aangezien de
aanvaarconstructie de horizontale belasting van de GVB veren opneemt wordt deze constructie
alleen verticaal belast.

De steigerconstructie bestaat uit een aantal constructieve elementen welk elk afzonderlijk dienen
te worden beschouwd, namelijk:
- schotten, het houten loopdek;
- dwarsliggers, hierop steunt het loopdek;
- hoofdliggers, hierop steunen de dwarsliggers;
- funderingspalen, deze dragen de volledige constructie.

3.2.2 Schotten
Voor de beschouwing van de schotten is uitgegaan van een (representatieve) variabele
gelijkmatig verdeelde verticale belasting en een permanente belasting.
2
Dit resulteert in een rekenwaarde voor de gelijkmatig verdeelde verticale belasting van 8 kN/m .

Onderstaand zijn enkele nog niet eerder genoemde uitgangspunten ten behoeve van de schotten:
- De overspanning (h.o.h.-afstand dwarsliggers) is 6 m;
- Er wordt gebruik gemaakt van standaard Azobé draglineschotten met een dikte van 150
mm.

Toetsing van optredende moment:

1
= ∙  
8

<

36  < 131  → 

M = optredende moment kNm


Mr = opneembaar moment (bepaling bijgevoegd in bijlage 2) kNm
2
q = rekenwaarde gelijkmatig verdeelde belasting kN/m
Funderingsadvies Aanvaarconstructie NDSM-werf,

te Amsterdam / augustus 2013 6


MVE/BB130956.46267 versie 2 Concept
BAM Nelis De Ruiter bv

l = hart-op-hart afstand dwarsliggers = 6 m

Toetsing van doorbuiging:

  ∙ !
= ∙ = 23 mm
 "#

Eis:
 < 0,004 ∙ 

23  < 0,004 ∙ 6.000 = 24  → 

3.2.3 Dwarsliggers
Aangenomen is de hart-op-hart afstand van 6 m voor de dwarsliggers, dit houdt in dat er 30/6+1 =
6 dwarsliggers toegepast zullen worden. De overspanning van de dwarsliggers is 7,5 m, de lengte
van de dwarsliggers is 10 m (overstek 0,5 m resp. 2 m).

Belasting omrekenen naar enkele ligger:


2 1
q = *⊥ = 6  ∙ 8 kN/m = 48 kN/m
Voor het bepalen van het moment wordt uitgegaan van de bovengrens (momentensom):
+ + 2
 = ∙   = ∙ 48 ∗ 7,5 = 338 kN/m
 

HEB500:
3
W = 4290 cm
2
fyd = 235 N/mm
4
I = 107176 cm
3 2
EI = 225*10 kNm

Toetsing van optredende moment:

0
/= = 79 < 235 → 
1

Toetsing van doorbuiging:

  ∙ !
= ∙ = 8 mm
 "#

Eis:
 < 0,004 ∙ 

8  < 0,004 ∙ 7.500 = 28 → 

Funderingsadvies Aanvaarconstructie NDSM-werf,

te Amsterdam / augustus 2013 7


MVE/BB130956.46267 versie 2 Concept
BAM Nelis De Ruiter bv

3.2.4 Hoofdliggers
De hart-op-hart afstand van de funderingspalen in de richting van de hoofdliggers bedraagt 10 m.
De belastingen die van de bovenliggende constructie op de liggers werken resulteren in een
zogenaamde puntlast op de balken. Vanwege het overstek is de belasting niet 50/50 verdeeld:

3 ≅ 0,6 = 288 kN
 56 1
q= = 48 kN/m
78
1
eqHEB = 2 kN/m
1
qd = 50 kN/m
+
 = ∙   = 625 kNm


HEB500:
3
W = 4290 cm
2
fyd = 235 kN/m
4
I = 107176 cm
3 2
EI = 225*10 kNm

Toetsing van optredende moment:

0
/= = 145 < 235 → 
1

3.2.5 Funderingspalen
Middels het rekenprogramma D-Foundations is een paaldraagvermogen beschouwing uitgevoerd,
de berekeningen zijn gebaseerd op de normenreeks NEN 1997.

3 ≅  ∗ ℎℎ = 50 ∗ 10 = 500 kN

• Type belasting: Axiaal op druk belaste palen;


• Negatieve kleef: In de berekening is rekening gehouden met het optreden van
negatieve kleef tot NAP -12,0 m;
• Positieve kleef: In de berekening is rekening gehouden met het optreden van
positieve kleef vanaf NAP -12,0 m;
• Stijfheid constructie: Voor de fundering is uitgegaan van een "slappe" constructie;
• ξ-factoren: factor ξ3 = 1,32 en ξ4 = 1,32 in de berekening (slappe constructie, 2
sondering, volgens NEN-EN 1997-1:2005/NB:2008, tabel 10a);
• γt: 1,2 (NEN-EN NEN 9997-1, tabel A.7);
• Paaltype: Open buispaal;
• Paalklassefactoren: αp = 1,00, αs = 0,010, β = 1,0 en s = 1,00;
• Palenplan: De berekeningen zijn gemaakt voor een alleenstaande paal en is
er geen rekening gehouden met groepseffect (conservatief).

In tabel 1 is een samenvatting van de resultaten weergegeven de volledige berekeningsresultaten


zijn in bijlage 2 bijgevoegd.

Funderingsadvies Aanvaarconstructie NDSM-werf,

te Amsterdam / augustus 2013 8


MVE/BB130956.46267 versie 2 Concept
BAM Nelis De Ruiter bv

In de tabel zijn de volgende gegevens gepresenteerd:


- Het paalpuntniveau waarop het draagvermogen is berekend (PPN);
- Representatieve waarde draagkracht paalpunt (Rb;cal;max);
- Representatieve waarde draagkracht paalschacht (Rs;cal;max);
- Rekenwaarde draagkracht excl. negatieve kleef (Rc;d);
- Rekenwaarde negatieve kleef (Rnsf;d);
De netto rekenwaarde van de draagkracht (Rc;net;d = Rc;d – Fnsf;d).

Tabel 1 Samenvatting resultaten D-Foundation

Sondering PPN Rb;cal;max Rs;cal;max Rc;d Fnsf;d Rc;net;d


[-] [m + NAP] [kN] [kN] [kN] [kN] [kN]

S1 -17,00 242 713 603 83 520


S1 -17,50 170 863 652 83 569
S1 -18,00 150 911 670 83 587
S1 -18,50 228 933 733 83 650
S1 -19,00 177 1956 1347 83 1264
S1 -19,50 219 2065 1442 83 1359
S2 -17,00 278 433 449 75 374
S2 -17,50 254 553 509 75 434
S2 -18,00 244 635 555 75 480
S2 -18,50 585 691 806 75 731
S2 -19,00 219 1501 1086 75 1011
S2 -19,50 219 1611 1155 75 1080

Aan de hand van de resultaten van de paaldraagvermogen berekeningen blijkt dat voor beide
sonderingen zou worden voldaan aan het paaldraagvermogen op circa NAP – 18,50 m. Echter dient
de paalpunt voldoende in de draagkrachtige laag te staan, waardoor wordt geadviseerd om de
palen door te zetten tot NAP -19,00 m.

Geadviseerd wordt om open buispalen ∅406 mm x 12,5 mm tot NAP -19,00 m toe te passen.
Het palenplan omvat 2 rijen van 4 palen, evenwijdig aan de kade, zie de situatietekening in bijlage
12.

Corrosie:
e
De CUR 166, 4 druk, deel 2 stelt dat er bij een zoetwater situatie circa 0,012 mm corrosie per jaar
valt te verwachten. Wanneer we stellen dat de levensduur circa 25 jaar zal bedragen zal dit
ongeveer 0,3 mm zal bedragen. Om rekening te houden met corrosie is de berekening uitgevoerd
met een gereduceerde paaldiameter resp. wanddikte van 400 mm en 12 mm.

Funderingsadvies Aanvaarconstructie NDSM-werf,

te Amsterdam / augustus 2013 9


MVE/BB130956.46267 versie 2 Concept
BAM Nelis De Ruiter bv

3.3 Aanvaarconstructie

3.3.1 Algemeen
De aanvaarconstructie bestaat uit een tweetal meerpalen waar het ponton tegenaan kan stoten
wanneer deze horizontaal wordt belast door een aanmerend veer.

Bij het dimensioneren dient rekening te worden gehouden met een incidentiele aanvaarbelasting
waarbij het veer niet afremt (calamiteit).

Bij het beschouwen van de meerpalen wordt gekeken naar de ongunstigste situatie, dit is
wanneer de belasting van de veer loodrecht aan de paal wordt overgedragen.

3.3.2 Beschouwing aanvaarconstructie


Het afmeren van een veer resulteert in een kinetische energie welk de maatgevende belasting is
in een dergelijke situatie, deze kinetische energie wordt benaderd aan de hand van de methode
Saurin.

Bepaling optredende kinetische energie:


In tabel 2 zijn de resultaten van de kinetische energie beschouwing weergegeven, de
berekeningssheets zijn bijgevoegd in bijlage 4.

Tabel 2 Samenvatting resultaten kinetishe energie bepaling

Aanmeersnelheid Belastingsfactor E Epaal;d

[Km/u] [-] [kNm] [kNm]

3 1,5 99*1,5 = 148 148/2 = 74


4 1 175*1 = 175 175/2 = 88

Toetsing palen op kinetische energie:


De meerpalen worden middels de methode van Blum getoetst aan de optredende kinetische
energie. Uit de beschouwing volgt dat rekenkundig aan de belasting wordt voldaan met een holle
buispaal ∅ 1220 mm – 25 mm, staal X52, de berekening is bijgevoegd in bijlage 5.

Bij de berekening is ervan uitgegaan dat de energie evenredig wordt verdeeld over de 2 palen en
dus 88 kNm opgenomen moet kunnen worden. In werkelijkheid zal dit niet altijd het geval zijn. Uit
de berekening blijkt dat de capaciteit van een enkele paal 138 kNm is, dit betekent dat 1 paal
138/175 = 80% van de energie kan opnemen.

Corrosie:
Met in achtneming van de eerder genoemde corrosie van de palen is een aanvullende
beschouwing uitgevoerd voor de meerpalen. Hieruit blijkt dat de meerpalen, met in achtneming
van corrosie over 25 jaar, voldoen aan de optredende belastingen, de beschouwing is bijgevoegd
in bijlage 6.

Funderingsadvies Aanvaarconstructie NDSM-werf,

te Amsterdam / augustus 2013 10


MVE/BB130956.46267 versie 2 Concept
BAM Nelis De Ruiter bv

3.4 Meerpalen

3.4.1 Algemeen
De meerpalen worden uitgevoerd als open buispalen welke zich ter hoogte van de
remmingswerkconstructie bevinden aan de buitenzijde van de aanvaarconstructie, zie de
situatietekening in bijlage 12.

3.4.2 Beschouwing meerpalen


Het afmeren van een veer resulteert in een kinetische energie welk de maatgevende belasting is
in een dergelijke situatie, deze kinetische energie wordt benaderd aan de hand van de methode
Saurin. De palen worden getoetst conform de methode van Blum.

Bepaling optredende kinetische energie:


In tabel 2 zijn de resultaten van de kinetische energie beschouwing weergegeven, de
berekeningssheets zijn bijgevoegd in bijlage 7. Uitgangspunt is dat het veer met de boeg de
meerpaal raakt.

Tabel 3 Samenvatting resultaten kinetishe energie bepaling

Aanmeersnelheid Lengte veer Breedte veer Diepgang veer Aanvaarhoek Es;d


[Km/u] [m] [m] [m] [graden] [kNm]

7 28,60 9,00 2,10 30 79

Toetsing palen op kinetische energie:


De meerpalen worden middels de methode van Blum getoetst aan de optredende kinetische
energie. Uit de beschouwing volgt dat rekenkundig aan de belasting wordt voldaan met een holle
buispaal ∅ 1220 mm – 25 mm, staal X52, de berekening is bijgevoegd in bijlage 8.

Corrosie:
Met in achtneming van de eerder genoemde corrosie van de palen is een aanvullende
beschouwing uitgevoerd voor de meerpalen. Hieruit blijkt dat de meerpalen, met in achtneming
van corrosie over 25 jaar, voldoen aan de optredende belastingen, de beschouwing is bijgevoegd
in bijlage 9.

Funderingsadvies Aanvaarconstructie NDSM-werf,

te Amsterdam / augustus 2013 11


MVE/BB130956.46267 versie 2 Concept
BAM Nelis De Ruiter bv

3.5 Remmingswerk

3.5.1 Algemeen
De remmingswerkconstructies bestaat uit een geleidingswerk bestaande uit een constructie
gesteund door 3 palen ∅ 914 mm – 10,0 mm, staal X52, met een h.o.h.-afstand a = 7,5 m.

Deze constructie omvat een drietal palen en dient gedimensioneerd te worden op een incidentiele
aanvaarbelasting en een normale belasting.

3.5.2 Beschouwing palen remmingswerk


Aangezien de incidentele belasting (7 km/uur) van de remwerken verdeeld zullen worden over de
3 aanwezige palen welk verbonden zijn met een profiel, is het niet mogelijk om met de methode
van de optredende en opneembare kinetische energie de profielen en de inheidiepte van de palen
te bepalen. Hiervoor zal worden getoetst op de optredende kracht.
e
In het 1 geval raakt het veer met de boeg het remmingwerk op de kop.

Figuur 1 Principe aanvaring remmingswerk

Figuur 2 Schematisatie aanvaring met remmingswerk

Funderingsadvies Aanvaarconstructie NDSM-werf,

te Amsterdam / augustus 2013 12


MVE/BB130956.46267 versie 2 Concept
BAM Nelis De Ruiter bv

Bepaling maximale paalkracht:

De op te nemen energie is gelijk aan E = 79 kNm, zie bijlage 7.


De veerconstante van een enkele paal is k_paal = F/w = ca.400 kN/m, zie bijlage 10.
In de meest ongunstige situatie raakt het veer het remmingwerk op de kop, zie figuur 1. De
meerbalk zal door de excentrische botsing dan roteren en verplaatsen. In combinatie met de
snelheid van 7 km/u is dit feitelijk een situatie waarvan de kans van voorkomen zeer gering is.
Om deze reden wordt de berekende energie gehalveerd tot E = 79/2 = 39 kNm.

De vervorming ter plaatse van het botsingspunt is:


2
w(F) = F/(n*k_paal)+F*e /Ip= F/k
Hierin is:
n= aantal palen = 3
k_paal = ca. 400 kN/m
e = afstand tussen botsingspunt en zwaartepunt palenplan = a
2
Ip = polair moment palenplan = k_paal*a *2
Hieruit volgt:
2 2
F/(3*400)+F*a /(2*400*a ) = F/k  k = 480 kN/m (veerconstante geheel)
Er geldt E = ½*F*w = 1/2*F*(F/k)  F = √(2kE) = √(2*480*39) = 193 kN.

De maximale kracht in een paal is:


2
F_paal = F/n+F*e*y*k_paal/Ip = 275/3+275*a*a*k_paal/( k_paal*a *2)
F_paal = 64+96 = 160 kN

Een tweede meer reëel belastingsgeval is waarbij de boeg het remmingwerk bij middelste paal
raakt. Er treedt dan alleen translatie van het remmingwerk op.
De vervorming ter plaatse van het botsingspunt is:
2
w(F) = F/(n*k_paal)+F*e /Ip= F/k
Hierin is:
n= aantal palen = 3
k_paal = ca. 400 kN/m
e = afstand tussen botsingspunt en zwaartepunt palenplan = 0
2
Ip = polair moment palenplan = k_paal*a *2
Hieruit volgt:
F/(3*400)+0 = F/k  k = 1200 kN/m (veerconstante geheel)
In dit geval wordt wel met de maximale energie gerekend.
Er geldt E = ½*F*w = 1/2*F*(F/k)  F = √(2kE) = √(2*1200*79) = 435 kN.

De maximale kracht in een paal is:


F_paal = F/n = 435/3 =145 kN. Deze kracht is kleiner dan 160 kN en dus niet maatgevend.

De belasting is vervolgens als statische belasting op de paal gezet, en met de methode van Blum
zijn de momenten berekend, zie bijlage 10.
Aan de hand van deze beschouwing blijkt dat bij het toepassen van holle buispalen, ∅ 914 mm –
10 mm, staalkwaliteit X52, de constructie de belasting kan opvangen. Er is ook nog een
berekening gemaakt met corrosie, met de reële belasting van 145 kN, zie bijlage 11.

Funderingsadvies Aanvaarconstructie NDSM-werf,

te Amsterdam / augustus 2013 13


MVE/BB130956.46267 versie 2 Concept
BAM Nelis De Ruiter bv

4 Conclusies en aanbevelingen

Voor de aanlegconstructie ter plaatse van de NDSM-werf zijn de volgende constructieve


elementen bepaald:

- Steigerconstructie;
 Afmetingen houten dek, 30 x 10 m;
 Houten dek elementen:
• 150 mm dik;
• Sterkte klasse D70;
• Klimaatklasse 3;
• Duurzaamheidsklasse 1.
 Dwarsliggers:
• 6x HEB500 van 10,0 m, staal S235.
 Hoofdliggers:
• 2 x HEB500 over een lengte van 30,0 m, staal S235.
 Funderingspalen:
• 2 x 4 palen;
• Open buispalen, ∅ 406 mm – 12,5 mm, staal S235;
• Paalpuntniveau op NAP -19,0 m, paallengte: circa 19 m.
- Aanvaarconstructie:
 Pontonpalen:
• Open buispalen, ∅ 1220 mm – 25 mm, staal X52;
• Paalpuntniveau op NAP -22,0 m, paallengte: circa 22,5 m.
- Meerpalen
 Meerpalen:
• Open buispalen, ∅ 1220 mm – 25 mm, staal X52;
• Paalpuntniveau op NAP -22,0 m, paallengte: circa 24 m.
- Remmingswerken:
 Palen:
• Open buispalen, ∅ 914 mm – 10,0 mm, staal X52;
• Paalpuntniveau op NAP -19,0 m, lengte: circa 21 m.
 Verbinding:
• Horizontaal geplaatste holle buispalen, ∅ 711 mm - 10,0 mm, staal X52,
lengte: respectievelijk 6,1 à 7,9 m.

Funderingsadvies Aanvaarconstructie NDSM-werf,

te Amsterdam / augustus 2013 14


MVE/BB130956.46267 versie 2 Concept
BAM Nelis De Ruiter bv

Referenties

1. NEN-EN 1990:2002, Grondslagen van het constructief ontwerp;


2. NEN 9997-1:2011, Geotechnisch ontwerp van constructies - Deel 1: Algemene regels;
e
3. CUR 166, 4 druk;
4. Overzichtstekening; BAM Nelis de Ruiter, 46267-TEK-007-000-DWB;
5. Doorsnede A-A, tekening; BAM Nelis de Ruiter, 46267-TEK-007-000-DWB;

Funderingsadvies Aanvaarconstructie NDSM-werf,

te Amsterdam / augustus 2013 15


MVE/BB130956.46267 versie 2 Concept
BAM Nelis De Ruiter bv

Bijlage 1 Grondonderzoek

Sondeerlocaties

Funderingsadvies Aanvaarconstructie NDSM-werf,

te Amsterdam / augustus 2013 16


MVE/BB130956.46267 versie 2 Concept
BAM Nelis De Ruiter bv

SB1

Funderingsadvies Aanvaarconstructie NDSM-werf,


te Amsterdam / augustus 2013 17
MVE/BB130956.46267 versie 2 Concept
BAM Nelis De Ruiter bv

SB2

Funderingsadvies Aanvaarconstructie NDSM-werf,


te Amsterdam / augustus 2013 18
MVE/BB130956.46267 versie 2 Concept
BAM Nelis De Ruiter bv

Bijlage 2 Beschouwing opneembaar moment houten schotten

Funderingsadvies Aanvaarconstructie NDSM-werf,


te Amsterdam / augustus 2013 19
MVE/BB130956.46267 versie 2 Concept
BAM Nelis De Ruiter bv

Bijlage 3 Resultaten M-Foundation berekeningen

Funderingsadvies Aanvaarconstructie NDSM-werf,

te Amsterdam / augustus 2013 20


MVE/BB130956.46267 versie 2 Concept
Report for D-Foundations 8.2
Design and Verification according to Eurocode 7 of Bearing/Tension Piles and Shallow Foundations
Developed by Deltares

Company: BAM Infratechniek

Date of report: 18-6-2013


Time of report: 9:40:45

Date of calculation: 22-5-2013


Time of calculation: 15:06:23

Filename: K:\..\46267 GVB Ponthaven\NDSM terrein - berekeningen\46267

Project identification:

D-Foundations 46267
BAM Infratechniek D-Foundations 8.2

1 Table of Contents

1 Table of Contents 2
2 Input Data 3
2.1 General Input Data 3
2.2 General Report Data 3
2.3 Application Area Model Bearing Piles 3
2.4 Superstructure 3
2.5 General CPT Data 3
2.5.1 View of CPT's in Foundation Plan 3
2.6 Soil Data 4
2.6.1 Soil Profile S1 4
2.6.2 Soil Profile S2 5
2.7 Pile Types 7
2.7.1 Pile type : HolOpen 400 7
2.8 Foundation Plan 7
2.8.1 View of Foundation Plan 8
2.9 Excavation Data 8
2.10 Overruled Parameters 9
2.11 Calculation Options 9
2.12 Model Options 9
3 Bearing Piles (EC7-NL): Results of the Option Preliminary Design, Indication Bearing Capacity 10
3.1 Remarks 10
3.2 Calculation Parameters 10
3.2.1 Pile Factors 10
3.2.2 Pile type : HolOpen 400 10
3.3 Results Bearing Forces for Pile type : HolOpen 400 10
3.4 Summary Net Bearing Capacity in kN 11

18-6-2013 K:\..\NDSM terrein - berekeningen\46267 Page 2


BAM Infratechniek D-Foundations 8.2

2 Input Data

2.1 General Input Data

Model Bearing Piles (EC7-NL)

2.2 General Report Data

Geotechnical consultant :
Design engineer superstructure :
Principal :
Title 1 :
Title 2 :
Title 3 : D-Foundations 46267
Number of project :
Location of project :

2.3 Application Area Model Bearing Piles

The verifications performed by the model BEARING PILES of D-FOUNDATIONS concern pile foundations on which
axial static or quasi-static loads cause pressures in the piles. The calculations of pile forces and pile displacements
are based on Cone Penetration Tests. Possible rise of (tension-)piles and horizontal displacements of piles and/or
pile groups are not taken into account.

2.4 Superstructure

Rigidity of the superstructure : Non-Rigid

2.5 General CPT Data

Number of CPT's : 2
Timing of CPT's : CPT - Excavation - Install

2.5.1 View of CPT's in Foundation Plan

Legend
HolOpen 400 (Edge pile)
HolOpen 400 (Middle pile)
CPT

S1

S2

18-6-2013 K:\..\NDSM terrein - berekeningen\46267 Page 3


BAM Infratechniek D-Foundations 8.2

Number/Name Pile tip Top of pos. Bottom of neg. X-coor- Y-coor-


CPT level friction zone friction zone dinate dinate
[m R.L.] [m R.L.] [m R.L.] [m] [m]
1: S1 -20,00 -12,00 -12,00 121233,00 490493,00
2: S2 -20,00 -12,00 -12,00 121254,00 490479,00

2.6 Soil Data

Number of soil profiles (= number of CPT's) : 2

2.6.1 Soil Profile S1

Belonging to CPT S1
Surface level in [m. reference level] : -2,69
Phreatic level in [m. reference level] : -0,40
Pile tip level in [m. reference level] : -20,00
Top of positive skin friction zone in [m. reference level] : -12,00
Bottom of negative skin friction zone in [m. reference level] : -12,00
OCR-value foundation layer : 1,00
Expected groundlevel settlement in [m] : 0,11
Number of layers in profile : 54

Profile: S1

5,00

0,00 PL Material Unit weight Unit weight Phi


qc [MPa]
dry wet
10,00 20,00 30,00 40,00 50,00 60,00 kN/m3 kN/m3 deg
Ground level (-2,69) Clay, orga.. 15,0 15,0 15,0
Clay, orga..
Clay,
Peat, orga..
mod.. 15,0
15,0
13,0 15,0
15,0
13,0 15,0
15,0
15,0
-5,00
Clay, orga.. 15,0 15,0 15,0
Clay, orga.. 16,0 16,0 15,0
NSFZ
Clay, clea.. 17,0 17,0 17,5
Clay,
Clay, clea..
sl s.. 20,0
20,0 20,0
20,0 25,0
22,5
-10,00 Clay,
Clay, clea..
Clay, sl s.. 20,0
20,0 20,0
20,0 25,0
22,5
Clay, clea..
sl s.. 20,0
20,0 20,0
20,0 25,0
22,5
Clay, ve
Loam, s.. 20,0 20,0 32,5
Clay,
Clay,
Clay, slsls..
Clay, ve s..
s..
s..
clea..
sl
20,0
20,0
20,0
20,0
20,0
20,0
20,0
20,0
20,0
20,0
30,0
32,5
22,5
25,0
22,5
Clay,
Loam,
Sand, ve
ve s..
s.. 20,0
20,0 20,0
20,0 32,5
35,0
Sand, ve s..
sl s.. 19,0
19,0 21,0
21,0 30,0
32,5
Sand, clea.. 20,0 22,0 40,0
Sand,
Sand, sl s.. 19,0 21,0 32,5
-15,00 Loam, ve
Loam, ve s..
s..
sl s.. 19,0
20,0
20,0 21,0
20,0
20,0 30,0
35,0
30,0
PSFZ Loam, ve s.. 20,0 20,0 35,0
Clay,
Clay, ve
Clay, s..
sl s.. 20,0
20,0 20,0
20,0 32,5
22,5
Clay, clea..
Clay,
Loam,
Loam,
clea..
sl
sls..
ve s..
s..
20,0
17,0
20,0
20,0
20,0
20,0
17,0
20,0
20,0
20,0
25,0
17,5
22,5
30,0
35,0
Loam,
Clay, sl s.. 20,0 20,0 30,0
Clay, ve
Clay,
s..
sl s..
clea..
20,0
20,0
20,0
20,0
20,0
20,0
32,5
22,5
25,0
Clay,
Loam, ve
Sand, ve s..
ve s..
s.. 20,0
20,0
19,0 20,0
20,0
21,0 32,5
35,0
30,0
-20,00 Sand, sl s.. 19,0 21,0 32,5
PTL Sand, clea.. 20,0 22,0 40,0
Sand, sl s.. 19,0 21,0 32,5
Sand, ve s.. 19,0 21,0 30,0
Sand, sl s.. 19,0 21,0 32,5
Sand, clea.. 20,0 22,0 40,0
-25,00 Sand, sl s.. 19,0 21,0 32,5
Sand, ve s.. 19,0 21,0 30,0
Sand, sl s.. 19,0 21,0 32,5

Sand, ve s.. 19,0 21,0 30,0


-30,00

Sand, ve s.. 19,0 21,0 30,0

-35,00
Depth [m] 0,00 0,05 0,10 0,15 0,20 0,25 0,30 0,35 PL (Phreatic Level) = -0,40 [m]
Pore water pressure [MPa] PTL (Pile Tip Level) = -20,00 [m]
qc [MPa] PSFZ = Positive skin friction zone, top = -12,00 [m]
Reduced qc for alpha_s [MPa] NSFZ = Negative skin friction zone, bottom = -12,00 [m]
Pore water pressure [MPa]

Number Top Gamma Gamma;sat Phi Soil Median


layer layer Type (Sand/Gravel)
[m R.L.] [kN/m3] [kN/m3] [deg] [mm]
1 -2,690 15,00 15,00 15,00 Clay --
2 -4,090 15,00 15,00 15,00 Clay --
3 -4,290 15,00 15,00 15,00 Clay --
4 -4,490 13,00 13,00 15,00 Peat --
5 -4,690 15,00 15,00 15,00 Clay --
6 -5,890 16,00 16,00 15,00 Clay --
7 -7,109 17,00 17,00 17,50 Clay --
8 -8,509 20,00 20,00 25,00 Clay --
9 -8,709 20,00 20,00 22,50 Clay --
10 -9,309 20,00 20,00 25,00 Clay --
11 -9,509 20,00 20,00 22,50 Clay --
12 -9,709 20,00 20,00 25,00 Clay --

18-6-2013 K:\..\NDSM terrein - berekeningen\46267 Page 4


BAM Infratechniek D-Foundations 8.2

Number Top Gamma Gamma;sat Phi Soil Median


layer layer Type (Sand/Gravel)
[m R.L.] [kN/m3] [kN/m3] [deg] [mm]
13 -9,909 20,00 20,00 22,50 Clay --
14 -10,309 20,00 20,00 32,50 Clay --
15 -10,909 20,00 20,00 30,00 Loam --
16 -11,109 20,00 20,00 32,50 Clay --
17 -11,309 20,00 20,00 22,50 Clay --
18 -11,528 20,00 20,00 25,00 Clay --
19 -11,728 20,00 20,00 22,50 Clay --
20 -11,928 20,00 20,00 32,50 Clay --
21 -12,128 20,00 20,00 35,00 Loam --
22 -12,328 19,00 21,00 30,00 Sand 0,200
23 -12,528 19,00 21,00 32,50 Sand 0,200
24 -12,728 20,00 22,00 40,00 Sand 0,200
25 -14,328 19,00 21,00 32,50 Sand 0,200
26 -14,528 19,00 21,00 30,00 Sand 0,200
27 -14,728 20,00 20,00 35,00 Loam --
28 -14,928 20,00 20,00 30,00 Loam --
29 -15,128 20,00 20,00 35,00 Loam --
30 -15,947 20,00 20,00 32,50 Clay --
31 -16,147 20,00 20,00 22,50 Clay --
32 -16,347 20,00 20,00 25,00 Clay --
33 -16,547 17,00 17,00 17,50 Clay --
34 -16,747 20,00 20,00 22,50 Clay --
35 -16,947 20,00 20,00 30,00 Loam --
36 -17,147 20,00 20,00 35,00 Loam --
37 -17,347 20,00 20,00 30,00 Loam --
38 -17,547 20,00 20,00 32,50 Clay --
39 -17,747 20,00 20,00 22,50 Clay --
40 -18,147 20,00 20,00 25,00 Clay --
41 -18,547 20,00 20,00 32,50 Clay --
42 -18,747 20,00 20,00 35,00 Loam --
43 -18,947 19,00 21,00 30,00 Sand 0,200
44 -19,147 19,00 21,00 32,50 Sand 0,200
45 -20,166 20,00 22,00 40,00 Sand 0,200
46 -21,166 19,00 21,00 32,50 Sand 0,200
47 -21,566 19,00 21,00 30,00 Sand 0,200
48 -22,966 19,00 21,00 32,50 Sand 0,200
49 -23,166 20,00 22,00 40,00 Sand 0,200
50 -24,566 19,00 21,00 32,50 Sand 0,200
51 -24,766 19,00 21,00 30,00 Sand 0,200
52 -25,766 19,00 21,00 32,50 Sand 0,200
53 -27,166 19,00 21,00 30,00 Sand 0,200
54 -29,785 19,00 21,00 30,00 Sand 0,200

2.6.2 Soil Profile S2

Belonging to CPT S2
Surface level in [m. reference level] : -2,29
Phreatic level in [m. reference level] : -0,40
Pile tip level in [m. reference level] : -20,00
Top of positive skin friction zone in [m. reference level] : -12,00
Bottom of negative skin friction zone in [m. reference level] : -12,00
OCR-value foundation layer : 1,00
Expected groundlevel settlement in [m] : 0,11
Number of layers in profile : 49

18-6-2013 K:\..\NDSM terrein - berekeningen\46267 Page 5


BAM Infratechniek D-Foundations 8.2

Profile: S2

5,00

0,00 qc [MPa] PL Material Unit weight Unit weight Phi


dry wet
10,00 20,00 30,00 40,00 50,00 60,00 kN/m3 kN/m3 deg
Ground level (-2,29) Peat, mod.. 13,0 13,0 15,0
Peat, mod.. 13,0 13,0 15,0
-5,00 Peat, mod.. 13,0 13,0 15,0
Clay, orga.. 15,0 15,0 15,0
Clay, orga.. 16,0 16,0 15,0
NSFZ
Clay, clea.. 17,0 17,0 17,5
Clay,
Clay, orga..
clea.. 16,0
17,0 16,0
17,0 15,0
17,5
Clay,
Clay, clea..
sl s.. 20,0
20,0 20,0
20,0 25,0
22,5
-10,00 Clay, clea.. 20,0 20,0 25,0
Clay, ve
Clay, sl s..
s.. 20,0
20,0 20,0
20,0 22,5
32,5
Loam,
Clay, sl s..
ve s.. 20,0
20,0 20,0
20,0 30,0
32,5
Clay,
Clay, clea..
sl 20,0 20,0 25,0
Clay,
Loam,
Sand, ves..
ve s..
s.. 20,0
20,0
20,0 20,0
20,0
20,0 22,5
32,5
35,0
Sand, ve s..
sl s.. 19,0
19,0 21,0
21,0 30,0
32,5
Sand, clea.. 20,0 22,0 40,0
-15,00 Sand, sl s..
Sand, ve s.. 19,0
19,0 21,0
21,0 32,5
30,0
Sand, ve
Sand, sl s..
s.. 19,0
19,0 21,0
21,0 32,5
30,0
PSFZ Loam,
Clay, sl s..
ve s.. 20,0
20,0 20,0
20,0 30,0
32,5
Clay, clea..
Clay, orga..
clea.. 20,0
17,0 20,0
17,0 25,0
17,5
Clay,
Clay, clea..
Clay, ve
sl s.. 16,0
20,0
20,0 16,0
20,0
20,0 15,0
25,0
22,5
Clay, s..
Clay, sl s.. 20,0
20,0 20,0
20,0 32,5
22,5
Clay,
Clay, clea..
Loam, sl
sls..
s.. 20,0
20,0
20,0 20,0
20,0
20,0 25,0
22,5
30,0
Sand,
Sand, ve s..
clea.. 19,0
20,0 21,0
22,0 30,0
40,0
-20,00 Sand, sl s.. 19,0 21,0 32,5
PTL Sand, clea.. 20,0 22,0 40,0
Sand, sl s.. 19,0 21,0 32,5
Sand, ve s.. 19,0 21,0 30,0
Loam, ve s.. 20,0 20,0 35,0
-25,00 Sand, ve s.. 19,0 21,0 30,0
Sand, sl s.. 19,0 21,0 32,5

Sand, ve s.. 19,0 21,0 30,0


-30,00

Sand, ve s.. 19,0 21,0 30,0

-35,00
Depth [m] 0,00 0,05 0,10 0,15 0,20 0,25 0,30 0,35 PL (Phreatic Level) = -0,40 [m]
Pore water pressure [MPa] PTL (Pile Tip Level) = -20,00 [m]
qc [MPa] PSFZ = Positive skin friction zone, top = -12,00 [m]
Reduced qc for alpha_s [MPa] NSFZ = Negative skin friction zone, bottom = -12,00 [m]
Pore water pressure [MPa]

Number Top Gamma Gamma;sat Phi Soil Median


layer layer Type (Sand/Gravel)
[m R.L.] [kN/m3] [kN/m3] [deg] [mm]
1 -2,290 13,00 13,00 15,00 Peat --
2 -4,040 13,00 13,00 15,00 Peat --
3 -4,240 13,00 13,00 15,00 Peat --
4 -5,040 15,00 15,00 15,00 Clay --
5 -5,840 16,00 16,00 15,00 Clay --
6 -6,440 17,00 17,00 17,50 Clay --
7 -8,259 16,00 16,00 15,00 Clay --
8 -8,659 17,00 17,00 17,50 Clay --
9 -8,859 20,00 20,00 25,00 Clay --
10 -9,059 20,00 20,00 22,50 Clay --
11 -9,259 20,00 20,00 25,00 Clay --
12 -10,059 20,00 20,00 22,50 Clay --
13 -10,279 20,00 20,00 32,50 Clay --
14 -10,698 20,00 20,00 30,00 Loam --
15 -11,298 20,00 20,00 32,50 Clay --
16 -11,498 20,00 20,00 25,00 Clay --
17 -11,898 20,00 20,00 22,50 Clay --
18 -12,098 20,00 20,00 32,50 Clay --
19 -12,298 20,00 20,00 35,00 Loam --
20 -12,498 19,00 21,00 30,00 Sand 0,200
21 -12,698 19,00 21,00 32,50 Sand 0,200
22 -13,298 20,00 22,00 40,00 Sand 0,200
23 -14,117 19,00 21,00 32,50 Sand 0,200
24 -14,317 19,00 21,00 30,00 Sand 0,200
25 -14,917 19,00 21,00 32,50 Sand 0,200
26 -15,517 19,00 21,00 30,00 Sand 0,200
27 -15,717 20,00 20,00 30,00 Loam --
28 -15,917 20,00 20,00 32,50 Clay --
29 -16,117 20,00 20,00 25,00 Clay --
30 -16,517 17,00 17,00 17,50 Clay --
31 -16,736 16,00 16,00 15,00 Clay --
32 -16,936 20,00 20,00 25,00 Clay --
33 -17,136 20,00 20,00 22,50 Clay --
34 -17,336 20,00 20,00 32,50 Clay --

18-6-2013 K:\..\NDSM terrein - berekeningen\46267 Page 6


BAM Infratechniek D-Foundations 8.2

Number Top Gamma Gamma;sat Phi Soil Median


layer layer Type (Sand/Gravel)
[m R.L.] [kN/m3] [kN/m3] [deg] [mm]
35 -17,536 20,00 20,00 22,50 Clay --
36 -18,136 20,00 20,00 25,00 Clay --
37 -18,336 20,00 20,00 22,50 Clay --
38 -18,536 20,00 20,00 30,00 Loam --
39 -18,755 19,00 21,00 30,00 Sand 0,200
40 -18,955 20,00 22,00 40,00 Sand 0,200
41 -19,555 19,00 21,00 32,50 Sand 0,200
42 -20,155 20,00 22,00 40,00 Sand 0,200
43 -21,374 19,00 21,00 32,50 Sand 0,200
44 -21,574 19,00 21,00 30,00 Sand 0,200
45 -23,393 20,00 20,00 35,00 Loam --
46 -23,793 19,00 21,00 30,00 Sand 0,200
47 -25,012 19,00 21,00 32,50 Sand 0,200
48 -26,050 19,00 21,00 30,00 Sand 0,200
49 -29,764 19,00 21,00 30,00 Sand 0,200

2.7 Pile Types

2.7.1 Pile type : HolOpen 400

Pile type : Open-ended steel pipe pile

Materialtype for pile : Steel


Slip layer : None
Pile shape : Round open-ended hollow pile
beta (Shape factor) according to figure 7i, NEN-EN 1997-1:2005.
s (factor for the influence of the shape of the crosssection of the pile base) according to NEN-EN 1997-1:2005.

Pile dimensions :
Diameter at tip [m] : 0,400
Wall thickness [mm] : 12,0

2.8 Foundation Plan

Number of piles : 1
Number of collaborating piles* : 1
* : 0 = not defined, 1 = non rigid superstructure, >1 = rigid superstructure

18-6-2013 K:\..\NDSM terrein - berekeningen\46267 Page 7


BAM Infratechniek D-Foundations 8.2

2.8.1 View of Foundation Plan

Legend
HolOpen 400 (Edge pile)
HolOpen 400 (Middle pile)
CPT

Pile X-coor- Y-coor- Fc;d Fc;d P0 Pile head


nr/name dinate dinate (EQU/GEO) (SLS) level
[m] [m] [kN] [kN] [kN/m2] [m R.L.]
1: 1 121228,00 490474,00 0,00 0,00 0,00 -2,29

2.9 Excavation Data

Excavation level in [m. reference level] : -2,29


Reduction model : Safe (NEN)

18-6-2013 K:\..\NDSM terrein - berekeningen\46267 Page 8


BAM Infratechniek D-Foundations 8.2

Indication for qc-reduction Profile: S1


due to safe reduction method

5,00

0,00 PL
qc [MPa] [kN/m2]
10 20 30 40 50 60 0 100 200 300 400 500 600 700

Ground level (-2,69)


-5,00

-10,00

-15,00

-20,00

-25,00

-30,00

-35,00
Depth [m] PL (Phreatic Level) = -0,40 [m]
= Initial Effective Stress
qc [MPa] = Effective Stress
Reduced qc [MPa]

2.10 Overruled Parameters

All parameters according to standard.

2.11 Calculation Options

Suppress pile group (for negative skin friction)


Do not create intermediate results file
Use reduction for continuous flight auger piles (standard)
Use the influence of excavations (standard).

2.12 Model Options

Selected pile types :


-HolOpen 400

Selected profiles :
-S1
-S2

Trajectory
-begin [m] : -12,00
-end [m] : -20,00
-interval [m] : 0,50

18-6-2013 K:\..\NDSM terrein - berekeningen\46267 Page 9


BAM Infratechniek D-Foundations 8.2

3 Bearing Piles (EC7-NL): Results of the Option Preliminary Design, Indication Bearing Ca

3.1 Remarks

When checking the survey and testing of soil according to NEN 9097-1 art 3.2.3 lid (e), the program uses the
provided CPT test level. It does NOT take into account possible different pile tip levels. When different pile tip levels
are used in this calculation, the user itself must check for possibly required additional survey and testing of soil.

Note : The calculations performed are based on a single pile for limit state EQU/GEO (= ultimate limit state).
Due to the nature of preliminary design, a single pile is always assumed. A possible pileplan is disregarded when
using the preliminary design option. Hence a non rigid superstructure is assumed and pile group effects are not
considered.

3.2 Calculation Parameters

3.2.1 Pile Factors

gamma;b (NEN-EN 1997-1:2005, annex A.6 A.7 A.8,


Limit State EQU/GEO) : 1,20
gamma;b (NEN-EN 1997-1:2005, annex A.6 A.7 A.8,
the Serviceability Limit State) : 1,00
gamma;s (NEN-EN 1997-1:2005, annex A.6 A.7 A.8,
Limit State EQU/GEO) : 1,20
gamma;s (NEN-EN 1997-1:2005, annex A.6 A.7 A.8,
the Serviceability Limit State) : 1,00
xi3 (NEN-EN 1997-1:2005, annex A, table 10a, for N = 2) : 1,32
xi4 (NEN-EN 1997-1:2005, annex A, table 10a, for N = 2) : 1,32

3.2.2 Pile type : HolOpen 400

Pile type : Open-ended steel pipe pile

Materialtype for pile : Steel


Slip layer : None
Pile shape : Round open-ended hollow pile
beta (Shape factor: figuur 7i, NEN-EN 1997
1:2005 par. 7.6.2.3(g): NEN 9097-1 : Pile tip) : 1,00
s (NEN-EN 1997 1:2005 par. 7.6.2.3(h), NEN 9097-1 : factor for
the influence of the shape of the crosssection of the pile base) : 1,00

Pile dimensions :
Diameter at tip [m] : 0,400
Wall thickness [mm] : 12,0

CPT Alpha_s Alpha_s Alpha_p


Sand/ Clay/Loam
Gravel Peat
S1 0,0060 0,0236 1,0000
S2 0,0060 0,0243 1,0000

3.3 Results Bearing Forces for Pile type : HolOpen 400

CPT name Level Rb;cal;max Rs;cal;max Rc;cal;max Rc;d F;nsf;rep Fnsf;d Rc;net;d
[m R.L.] [kN] [kN] [kN] [kN] [kN] [kN] [kN]
S1 -12.00 27 0 27 17 83 83 -66
S1 -12.50 135 98 233 147 83 83 64
S1 -13.00 189 208 397 251 83 83 168
S1 -13.50 116 318 434 274 83 83 191
S1 -14.00 105 427 532 336 83 83 253
S1 -14.50 68 537 605 382 83 83 299
S1 -15.00 346 360 706 446 83 83 363

18-6-2013 K:\..\NDSM terrein - berekeningen\46267 Page 10


BAM Infratechniek D-Foundations 8.2

CPT name Level Rb;cal;max Rs;cal;max Rc;cal;max Rc;d F;nsf;rep Fnsf;d Rc;net;d
[m R.L.] [kN] [kN] [kN] [kN] [kN] [kN] [kN]
S1 -15.50 284 518 802 506 83 83 423
S1 -16.00 222 636 858 542 83 83 459
S1 -16.50 225 675 900 568 83 83 485
S1 -17.00 242 713 955 603 83 83 520
S1 -17.50 170 863 1033 652 83 83 569
S1 -18.00 150 911 1061 670 83 83 587
S1 -18.50 228 933 1161 733 83 83 650
S1 -19.00 177 1956 2133 1347 83 83 1264
S1 -19.50 219 2065 2284 1442 83 83 1359
S1 -20.00 219 2175 2394 1511 83 83 1428
S2 -12.00 19 0 19 12 75 75 -63
S2 -12.50 79 83 162 102 75 75 27
S2 -13.00 108 163 271 171 75 75 96
S2 -13.50 108 272 380 240 75 75 165
S2 -14.00 105 382 487 307 75 75 232
S2 -14.50 64 488 552 348 75 75 273
S2 -15.00 460 287 747 472 75 75 397
S2 -15.50 246 332 578 365 75 75 290
S2 -16.00 184 389 573 362 75 75 287
S2 -16.50 182 411 593 374 75 75 299
S2 -17.00 278 433 711 449 75 75 374
S2 -17.50 254 553 807 509 75 75 434
S2 -18.00 244 635 879 555 75 75 480
S2 -18.50 585 691 1276 806 75 75 731
S2 -19.00 219 1501 1720 1086 75 75 1011
S2 -19.50 219 1611 1830 1155 75 75 1080
S2 -20.00 219 1720 1939 1224 75 75 1149

* Rc;net;d = Rc;d - Fnsf;d

3.4 Summary Net Bearing Capacity in kN

CPT name Groundlevel Level HolOpen 400


[m R.L.] [m R.L.] Rc;net;d [kN]
S1 -2,69 -12,00 -66,00
S1 -2,69 -12,50 64,00
S1 -2,69 -13,00 168,00
S1 -2,69 -13,50 191,00
S1 -2,69 -14,00 253,00
S1 -2,69 -14,50 299,00
S1 -2,69 -15,00 363,00
S1 -2,69 -15,50 423,00
S1 -2,69 -16,00 459,00
S1 -2,69 -16,50 485,00
S1 -2,69 -17,00 520,00
S1 -2,69 -17,50 569,00
S1 -2,69 -18,00 587,00
S1 -2,69 -18,50 650,00
S1 -2,69 -19,00 1264,00
S1 -2,69 -19,50 1359,00
S1 -2,69 -20,00 1428,00
S2 -2,29 -12,00 -63,00
S2 -2,29 -12,50 27,00
S2 -2,29 -13,00 96,00
S2 -2,29 -13,50 165,00
S2 -2,29 -14,00 232,00
S2 -2,29 -14,50 273,00
S2 -2,29 -15,00 397,00
S2 -2,29 -15,50 290,00
S2 -2,29 -16,00 287,00
S2 -2,29 -16,50 299,00
S2 -2,29 -17,00 374,00
S2 -2,29 -17,50 434,00
S2 -2,29 -18,00 480,00

18-6-2013 K:\..\NDSM terrein - berekeningen\46267 Page 11


BAM Infratechniek D-Foundations 8.2

CPT name Groundlevel Level HolOpen 400


[m R.L.] [m R.L.] Rc;net;d [kN]
S2 -2,29 -18,50 731,00
S2 -2,29 -19,00 1011,00
S2 -2,29 -19,50 1080,00
S2 -2,29 -20,00 1149,00

* Rc;net;d = Rc;d - Fnsf;d

End of Report

18-6-2013 K:\..\NDSM terrein - berekeningen\46267 Page 12


BAM Nelis De Ruiter bv

Bijlage 4 Botsingsenergie aanvaarconstructie v = 3 km/u en v = 4 km/u

Funderingsadvies Aanvaarconstructie NDSM-werf,

te Amsterdam / augustus 2013 21


MVE/BB130956.46267 versie 2 Concept
12-7-2013 energiebalans versie 1-02 v = 3

Energiebalans scheepsstoot
Project NDSM-werf
Onderdeel aanvaarconstructie
Opmerking v = 3 km/u, gamma = 1,5
Datum 12-7-2013
Opsteller ir. E.W. van Vaneveld
Bijlage

GEGEVENS VAN HET SCHIP

Scheepstype IJveer 50-serie -


Lengte LBP = 28,60 m (length between perpendiculars)
Breedte B = 9,00 m (over-all width)
Diepgang D = 2,10 m (draught)
Blokfactor Cblok = 0,34 -
Dichtheid water  = 1000,00 kg/m3
Massa van het schip = waterverplaatsing m = 185946 kg Waterverplaatsing
= 186 ton
= 1859 kN

BOTSINGS OF AFMEERSNELHEID

Indicatie afmeersnelheid DWT [kN]: < 1000 1000 tot 5000 5000 tot 10000 > 10000
m [kN]: <15000 15000 tot 65000 65000 tot 130000 > 130000
Type Conditie haven Afmeren Afmeersnelheid in m/s volgens EAU 1990

1 Sterke wind en stroming Moeilijk 0,75 0,55 0,40 0,30


2 Sterke wind en stroming Makkelijk 0,60 0,45 0,30 0,20
3 Matige wind en stroming Matig 0,45 0,35 0,20 0,15
4 Beschut Moeilijk 0,25 0,20 0,15 0,10
5 Beschut Makkelijk 0,20 0,15 0,10 0,10

Andere benadering afmeersnelheid: Op basis van de werkelijke snelheid van het schip (indien bekend)

vaarsnelheid Uparallel = 0,83 m/s in vaarrichting, dus parallel aan schip


= 3,00 km/u
ULoodrecht 0,00 m/s loodrecht op het schip
0,00 km/u
aanvaarhoek  = 90,00 deg hoek tussen schip en kade
aanvaarsnelheV=Uparallel *sin()+ULoodrecht *cos() = 0,83 m/s loodrecht op kade
N.B. Uparallel wordt bepaald door de schipper, Uloodrecht door de lokale situatie, zoals de stroomsnelheid van het water en de windsnelheid

Pagina 1 van 6
12-7-2013 energiebalans versie 1-02 v = 3

Energiebalans scheepsstoot
Project NDSM-werf
Onderdeel aanvaarconstructie
Opmerking v = 3 km/u, gamma = 1,5
Datum 12-7-2013
Opsteller ir. E.W. van Vaneveld
Bijlage 0

Aan te houden afmeersnelheid v = 0,83 m/s (loodrecht op kade, ofwel in de bewegingsrichting


= 3,00 km/u van de afmeerconstructie)
Hydrodynamische toeslag Costa Cm = 1,47 - Traagheid van het water
(Traagheid van het water) Saurin Cm = 1,30 -
Stelson Cm = 1,53
Grim Cm 1,72 -
Giraudet H = 4,00 m waterdiepte
Cm 1,33
Keuze Cm = 1,53 Default = Costa
Mtotaal mtot = 2850 kN

Excentriciteitsfactor  = 90,00 deg


(Invloed van het verschil tussen het zwaar-  = 90,00 deg
tepunt van het schip en het punt van  = -90,00 deg
impact) X = 14,30 - 0.2 tot 0.6
K/LOA = 0,18 - PIANC: 0.11+0.19*Cblok
R = 4,50 m Afstand tussen massazwaartepunt
schip en aangrijpingspunt botsing
K = 5,02 m Traagheidsstraal
Ce(R,K) = 1,00 - Trellex: 0.50 tot 0.70, TUD: 0.60 tot 0.85
Vervorming schip Cs = 1,00 - 0.9 tot 0.95
Vervorming water Cc = 1,00 - Kademuur: 0.8 tot 0.9, Paal: 0.9 tot 1.0
Netto op te nemen energie Enetto = 1/2*(m*Cm Enetto = 98960 Nm
= 98,96 kNm
Veiligheidsfactor( meestal 1.5 tot 2.0)  = 1,50 Trellex: 2.0, Fentek: 1,50 tot 2,0)

Op te nemen Enetto = 98,96 kNm

Op te nemen Enetto;d = 148,44 kNm

Energiehuishouding Berekening energiedissipatie tijdens de botsing


E=Ce*Cs*Cc = 1,00 - Relatieve veerenergie
Re = Ediss/Ekin;bruto =1- = 0,00 - Relatieve demper-energie (Energiereductie)
Rv=1-Re2 = 1,00 - Snelheidsreductie
INPUT Ekin;o = 98,96 Nm Totale energie in het systeem tijdens de botsing
DISSIPATIEEdiss = 0,00 Nm Energieverlies
OUTPUT Eveer = 98,96 Nm Energie die in veerenergie wordt omgezet
V* = 0,83 m/s Afstootsnelheid
Een deel van de gedissipeerde energie wordt omgezet in rotatie-energie, het overige deel
verdwijnt door demping.

Pagina 2 van 6
12-7-2013 energiebalans versie 1-02 v = 4

Energiebalans scheepsstoot
Project NDSM-werf
Onderdeel aanvaarconstructie
Opmerking v = 4 km/u, gamma = 1
Datum 12-7-2013
Opsteller ir. E.W. van Vaneveld
Bijlage

GEGEVENS VAN HET SCHIP

Scheepstype IJveer 50-serie -


Lengte LBP = 28,60 m (length between perpendiculars)
Breedte B = 9,00 m (over-all width)
Diepgang D = 2,10 m (draught)
Blokfactor Cblok = 0,34 -
Dichtheid water  = 1000,00 kg/m3
Massa van het schip = waterverplaatsing m = 185946 kg Waterverplaatsing
= 186 ton
= 1859 kN

BOTSINGS OF AFMEERSNELHEID

Indicatie afmeersnelheid DWT [kN]: < 1000 1000 tot 5000 5000 tot 10000 > 10000
m [kN]: <15000 15000 tot 65000 65000 tot 130000 > 130000
Type Conditie haven Afmeren Afmeersnelheid in m/s volgens EAU 1990

1 Sterke wind en stroming Moeilijk 0,75 0,55 0,40 0,30


2 Sterke wind en stroming Makkelijk 0,60 0,45 0,30 0,20
3 Matige wind en stroming Matig 0,45 0,35 0,20 0,15
4 Beschut Moeilijk 0,25 0,20 0,15 0,10
5 Beschut Makkelijk 0,20 0,15 0,10 0,10

Andere benadering afmeersnelheid: Op basis van de werkelijke snelheid van het schip (indien bekend)

vaarsnelheid Uparallel = 1,11 m/s in vaarrichting, dus parallel aan schip


= 4,00 km/u
ULoodrecht 0,00 m/s loodrecht op het schip
0,00 km/u
aanvaarhoek  = 90,00 deg hoek tussen schip en kade
aanvaarsnelheV=Uparallel *sin()+ULoodrecht *cos() = 1,11 m/s loodrecht op kade
N.B. Uparallel wordt bepaald door de schipper, Uloodrecht door de lokale situatie, zoals de stroomsnelheid van het water en de windsnelheid

Pagina 1 van 6
12-7-2013 energiebalans versie 1-02 v = 4

Energiebalans scheepsstoot
Project NDSM-werf
Onderdeel aanvaarconstructie
Opmerking v = 4 km/u, gamma = 1
Datum 12-7-2013
Opsteller ir. E.W. van Vaneveld
Bijlage 0

Aan te houden afmeersnelheid v = 1,11 m/s (loodrecht op kade, ofwel in de bewegingsrichting


= 4,00 km/u van de afmeerconstructie)
Hydrodynamische toeslag Costa Cm = 1,47 - Traagheid van het water
(Traagheid van het water) Saurin Cm = 1,30 -
Stelson Cm = 1,53
Grim Cm 1,72 -
Giraudet H = 4,00 m waterdiepte
Cm 1,33
Keuze Cm = 1,53 Default = Costa
Mtotaal mtot = 2850 kN

Excentriciteitsfactor  = 90,00 deg


(Invloed van het verschil tussen het zwaar-  = 90,00 deg
tepunt van het schip en het punt van  = -90,00 deg
impact) X = 14,30 - 0.2 tot 0.6
K/LOA = 0,18 - PIANC: 0.11+0.19*Cblok
R = 4,50 m Afstand tussen massazwaartepunt
schip en aangrijpingspunt botsing
K = 5,02 m Traagheidsstraal
Ce(R,K) = 1,00 - Trellex: 0.50 tot 0.70, TUD: 0.60 tot 0.85
Vervorming schip Cs = 1,00 - 0.9 tot 0.95
Vervorming water Cc = 1,00 - Kademuur: 0.8 tot 0.9, Paal: 0.9 tot 1.0
Netto op te nemen energie Enetto = 1/2*(m*Cm Enetto = 175929 Nm
= 175,93 kNm
Veiligheidsfactor( meestal 1.5 tot 2.0)  = 1,00 Trellex: 2.0, Fentek: 1,50 tot 2,0)

Op te nemen Enetto = 175,93 kNm

Op te nemen Enetto;d = 175,93 kNm

Energiehuishouding Berekening energiedissipatie tijdens de botsing


E=Ce*Cs*Cc = 1,00 - Relatieve veerenergie
Re = Ediss/Ekin;bruto =1- = 0,00 - Relatieve demper-energie (Energiereductie)
Rv=1-Re2 = 1,00 - Snelheidsreductie
INPUT Ekin;o = 175,93 Nm Totale energie in het systeem tijdens de botsing
DISSIPATIEEdiss = 0,00 Nm Energieverlies
OUTPUT Eveer = 175,93 Nm Energie die in veerenergie wordt omgezet
V* = 1,11 m/s Afstootsnelheid
Een deel van de gedissipeerde energie wordt omgezet in rotatie-energie, het overige deel
verdwijnt door demping.

Pagina 2 van 6
BAM Nelis De Ruiter bv

Bijlage 5 Capaciteit paal aanvaarconstructie

Funderingsadvies Aanvaarconstructie NDSM-werf,

te Amsterdam / augustus 2013 22


MVE/BB130956.46267 versie 2 Concept
Berekening stalen buispaal op stootbelasting en troskracht volgens Blum
Project : NDSM-werf
Projectnummer : 46267
Datum :
Opgesteld :
Onderdeel :
Opmerking :

GRONDGEGEVENS
droog = 17,00 kN/m3 volumegewicht droog  = 30,00 deg hoek v. inw. Wrijving
sat = 19,00 kN/m3 volumegewicht verzadigd = 0,52 rad
eff 9,00 kN/m4 volumegewicht effectief  = 0,00 - wandwrijving
 = 0,00 rad
Ka = 0,33 - actief
Kp = 3,00 - passief
PAALGEGEVENS
Deel Plaats Hoogte Du wanddikte fy;d I W E EI Mr;d cr
m mm mm MPa cm4 cm3 kNm
1 Boven 0,00 1220,00 25,00 360,00 1676076 27477 2,10E+05 3519759 9892 0,0077
2 Onder 22,04 1220,00 25,00 360,00 1676076 27477 2,10E+05 3519759 9892 0,0077
22,04
GEOMETRIE
ZFstoot = 0,50 m REF Aangrijpingspunt stootkracht t.o.v. ref
ZFtros 0,50 m REF Aangrijpingspunt troskracht t.o.v. ref
Zb = -12,00 m REF Bodemniveau t.o.v. ref
Zw = -0,40 m REF Waterpeil t.o.v. ref
Zt = 0,50 m REF Bovenkant paal t.o.v. ref
h1 = 0,00 m
L = 22,04 m Paallengte 12,00
Zokpaal = -21,54 m REF Onderkant paal t.o.v. ref

BELASTINGEN
Es;d 2,00 2,00
= 88,00 kNm
1,00 1,00
f;q 1,50 0,00 0,00
Ftros;d = 0,00 kN -50 -1,00 0 50 -1,00 0 5000 10000
f;q 1,50 -2,00 -2,00
-3,00 -3,00
-4,00 -4,00
BEREKENING OP STOOT VOLGENS BLUM -5,00 -5,00
Xm = 3,35 m-bodem Plaats Mmax -6,00 -6,00
-7,00 -7,00
to = 7,95 m-bodem Theoretische inheidiepte
-8,00 Hoogte [m REF] -8,00
t = 9,54 m-bodem Praktische inheidiepte -9,00 paal -9,00
Astitel

= -21,54 m ref Praktische inheidiepte -10,00 bodem


-10,00
-11,00 -11,00
L = 22,04 m Paallengte water
-12,00 -12,00
Ps = 669 kN Stootkracht -13,00 stoot -13,00
max = 0,414 m Doorbuiging t.p.v. stootkracht bij vloei -14,00 -14,00
Eu;d = 138,4 kNm Energiecapaciteit -15,00 -15,00
-16,00 -16,00
uc = 0,64 - Voldoet op energie -17,00 -17,00
Ms;d;max = 6289,0 kNm Optredend moment deel 2 -18,00 -18,00
d = 0,0011 -19,00 -19,00
-20,00 -20,00
rep = 0,0007
-21,00 -21,00
cr = 0,0077 -22,00 -22,00
uc = 0,14 - Voldoet op plooi -23,00 -23,00
Astitel Moment [kNm]
d = 0,26 m Verwachte maximale verplaatsing

BEREKENING OP TROS VOLGENS BLUM 2,00 2,00


Xm = 0 m-bodem Plaats Mmax
to = 0,00 m-bodem Theoretische inheidiepte 1,00 1,00
t = 0,00 m-bodem Praktische inheidiepte
= -12,00 m ref Praktische inheidiepte 0,00 0,00
-20 0 20 0 0,5 1
L = 12,50 m Paallengte
-1,00
Ms;d;max = 0 kNm Moment -1,00
uc = 0,00 - Voldoet op buiging
-2,00
d = 0,0000 -2,00
rep = 0,0000 -3,00
cr = 0,0077 -3,00
uc = 0,00 - Voldoet op plooi -4,00
max;d = 0,00 m Doorbuiging t.p.v. kracht -4,00
Hoogte [m |REF]

h1 = 0,00 m -5,00
h2 = 12,50 m -5,00 paal
Astitel

bodem -6,00
 = 0,000 rad Rotatie t.p.v. kracht
-6,00 water
bij;d = 0,00 m
tros -7,00
totaal;d 0,00 m Doorbuiging t.p.v. bovenkant paal
-7,00
-8,00

-8,00
Maatgevend: Stootbelasting -9,00
Controle overgang 1--2
-9,00
Ftros = 0 kN -10,00
h1 = 0,00
-10,00
M = Fmax*h1 = 0 kNm -11,00
Mr;d = 9892 kNm
-11,00 -12,00
uc = 0,00 - Voldoet op buiging
d = 0,0000
-12,00 -13,00
cr = 0,0077
uc = 0,00 - Voldoet op plooi -13,00 -14,00
Fstoot = 425 kN Astitel Moment [kNm]

h1 = 0,00
M = Fmax*h1 = 0 kNm
Mr;d = 9892 kNm
uc = 0,00 - Voldoet op buiging
d = 0,0000
cr = 0,0077
uc = 0,00 - Voldoet op plooi

B5 Berekening stalen buispaal op stoot en trosbelating 1-04 12-7-2013


BAM Nelis De Ruiter bv

Bijlage 6 Capaciteit paal aanvaarconstructie met corrosie

Funderingsadvies Aanvaarconstructie NDSM-werf,

te Amsterdam / augustus 2013 23


MVE/BB130956.46267 versie 2 Concept
Berekening stalen buispaal op stootbelasting en troskracht volgens Blum
Project : NDSM-werf
Projectnummer : 46267
Datum :
Opgesteld :
Onderdeel :
Opmerking :

GRONDGEGEVENS
droog = 17,00 kN/m3 volumegewicht droog  = 30,00 deg hoek v. inw. Wrijving
sat = 19,00 kN/m3 volumegewicht verzadigd = 0,52 rad
eff 9,00 kN/m4 volumegewicht effectief  = 0,00 - wandwrijving
 = 0,00 rad
Ka = 0,33 - actief
Kp = 3,00 - passief
PAALGEGEVENS
Deel Plaats Hoogte Du wanddikte fy;d I W E EI Mr;d cr
m mm mm MPa cm4 cm3 kNm
1 Boven 0,00 1220,00 24,00 360,00 1613019 26443 2,10E+05 3387340 9519 0,0073
2 Onder 21,93 1220,00 24,00 360,00 1613019 26443 2,10E+05 3387340 9519 0,0073
21,93
GEOMETRIE
ZFstoot = 0,50 m REF Aangrijpingspunt stootkracht t.o.v. ref
ZFtros 0,50 m REF Aangrijpingspunt troskracht t.o.v. ref
Zb = -12,00 m REF Bodemniveau t.o.v. ref
Zw = -0,40 m REF Waterpeil t.o.v. ref
Zt = 0,50 m REF Bovenkant paal t.o.v. ref
h1 = 0,00 m
L = 21,93 m Paallengte 12,00
Zokpaal = -21,43 m REF Onderkant paal t.o.v. ref

BELASTINGEN
Es;d 2,00 2,00
= 88,00 kNm
1,00 1,00
f;q 1,50 0,00 0,00
Ftros;d = 0,00 kN -50 -1,00 0 50 -1,00 0 5000 10000
f;q 1,50 -2,00 -2,00
-3,00 -3,00
-4,00 -4,00
BEREKENING OP STOOT VOLGENS BLUM -5,00 -5,00
Xm = 3,3 m-bodem Plaats Mmax -6,00 -6,00
-7,00 -7,00
to = 7,86 m-bodem Theoretische inheidiepte
-8,00 Hoogte [m REF] -8,00
t = 9,43 m-bodem Praktische inheidiepte -9,00 paal -9,00
Astitel

= -21,43 m ref Praktische inheidiepte -10,00 bodem


-10,00
-11,00 -11,00
L = 21,93 m Paallengte water
-12,00 -12,00
Ps = 644 kN Stootkracht -13,00 stoot -13,00
max = 0,410 m Doorbuiging t.p.v. stootkracht bij vloei -14,00 -14,00
Eu;d = 132,0 kNm Energiecapaciteit -15,00 -15,00
-16,00 -16,00
uc = 0,67 - Voldoet op energie -17,00 -17,00
Ms;d;max = 6347,0 kNm Optredend moment deel 2 -18,00 -18,00
d = 0,0011 -19,00 -19,00
-20,00 -20,00
rep = 0,0008
-21,00 -21,00
cr = 0,0073 -22,00 -22,00
uc = 0,16 - Voldoet op plooi -23,00 -23,00
Astitel Moment [kNm]
d = 0,27 m Verwachte maximale verplaatsing

BEREKENING OP TROS VOLGENS BLUM 2,00 2,00


Xm = 0 m-bodem Plaats Mmax
to = 0,00 m-bodem Theoretische inheidiepte 1,00 1,00
t = 0,00 m-bodem Praktische inheidiepte
= -12,00 m ref Praktische inheidiepte 0,00 0,00
-20 0 20 0 0,5 1
L = 12,50 m Paallengte
-1,00
Ms;d;max = 0 kNm Moment -1,00
uc = 0,00 - Voldoet op buiging
-2,00
d = 0,0000 -2,00
rep = 0,0000 -3,00
cr = 0,0073 -3,00
uc = 0,00 - Voldoet op plooi -4,00
max;d = 0,00 m Doorbuiging t.p.v. kracht -4,00
Hoogte [m |REF]

h1 = 0,00 m -5,00
h2 = 12,50 m -5,00 paal
Astitel

bodem -6,00
 = 0,000 rad Rotatie t.p.v. kracht
-6,00 water
bij;d = 0,00 m
tros -7,00
totaal;d 0,00 m Doorbuiging t.p.v. bovenkant paal
-7,00
-8,00

-8,00
Maatgevend: Stootbelasting -9,00
Controle overgang 1--2
-9,00
Ftros = 0 kN -10,00
h1 = 0,00
-10,00
M = Fmax*h1 = 0 kNm -11,00
Mr;d = 9519 kNm
-11,00 -12,00
uc = 0,00 - Voldoet op buiging
d = 0,0000
-12,00 -13,00
cr = 0,0073
uc = 0,00 - Voldoet op plooi -13,00 -14,00
Fstoot = 430 kN Astitel Moment [kNm]

h1 = 0,00
M = Fmax*h1 = 0 kNm
Mr;d = 9519 kNm
uc = 0,00 - Voldoet op buiging
d = 0,0000
cr = 0,0073
uc = 0,00 - Voldoet op plooi

B6 Berekening stalen buispaal op stoot en trosbelating 1-04 12-7-2013


BAM Nelis De Ruiter bv

Bijlage 7 Botsingsenergie meerpaal v = 7 km/u

Funderingsadvies Aanvaarconstructie NDSM-werf,

te Amsterdam / augustus 2013 24


MVE/BB130956.46267 versie 2 Concept
12-7-2013 B7 energiebalans versie 1-02 remmingwerk

Energiebalans scheepsstoot
Project NDSM-werf
Onderdeel meerpalen
Opmerking
Datum 12-7-2013
Opsteller ir. E.W. van Vaneveld
Bijlage

GEGEVENS VAN HET SCHIP

Scheepstype IJveer 50-serie -


Lengte LBP = 28,60 m (length between perpendiculars)
Breedte B = 9,00 m (over-all width)
Diepgang D = 2,10 m (draught)
Blokfactor Cblok = 0,34 -
Dichtheid water  = 1000,00 kg/m3
Massa van het schip = waterverplaatsing m = 185946 kg Waterverplaatsing
= 186 ton
= 1859 kN

BOTSINGS OF AFMEERSNELHEID

Indicatie afmeersnelheid DWT [kN]: < 1000 1000 tot 5000 5000 tot 10000 > 10000
m [kN]: <15000 15000 tot 65000 65000 tot 130000 > 130000
Type Conditie haven Afmeren Afmeersnelheid in m/s volgens EAU 1990

1 Sterke wind en stroming Moeilijk 0,75 0,55 0,40 0,30


2 Sterke wind en stroming Makkelijk 0,60 0,45 0,30 0,20
3 Matige wind en stroming Matig 0,45 0,35 0,20 0,15
4 Beschut Moeilijk 0,25 0,20 0,15 0,10
5 Beschut Makkelijk 0,20 0,15 0,10 0,10

Andere benadering afmeersnelheid: Op basis van de werkelijke snelheid van het schip (indien bekend)

vaarsnelheid Uparallel = 1,94 m/s in vaarrichting, dus parallel aan schip


= 7,00 km/u
ULoodrecht 0,00 m/s loodrecht op het schip
0,00 km/u
aanvaarhoek  = 30,00 deg hoek tussen schip en kade
aanvaarsnelheV=Uparallel *sin()+ULoodrecht *cos() = 0,97 m/s loodrecht op kade
N.B. Uparallel wordt bepaald door de schipper, Uloodrecht door de lokale situatie, zoals de stroomsnelheid van het water en de windsnelheid

Pagina 1 van 2
12-7-2013 B7 energiebalans versie 1-02 remmingwerk

Energiebalans scheepsstoot
Project NDSM-werf
Onderdeel meerpalen
Opmerking
Datum 12-7-2013
Opsteller ir. E.W. van Vaneveld
Bijlage

Aan te houden afmeersnelheid v = 0,97 m/s (loodrecht op kade, ofwel in de bewegingsrichting


= 3,50 km/u van de afmeerconstructie)
Hydrodynamische toeslag Costa Cm = 1,47 - Traagheid van het water
(Traagheid van het water) Saurin Cm = 1,30 -
Stelson Cm = 1,53
Grim Cm 1,72 -
Giraudet H = 4,00 m waterdiepte
Cm 1,33
Keuze Cm = 1,53 Default = Costa
Mtotaal mtot = 2850 kN

Excentriciteitsfactor  = 30,00 deg


(Invloed van het verschil tussen het zwaar-  = 17,47 deg
tepunt van het schip en het punt van  = 42,53 deg
impact) X = 0,00 - 0.2 tot 0.6
K/LOA = 0,18 - PIANC: 0.11+0.19*Cblok
R = 14,99 m Afstand tussen massazwaartepunt
schip en aangrijpingspunt botsing
K = 5,02 m Traagheidsstraal
Ce(R,K) = 0,59 - Trellex: 0.50 tot 0.70, TUD: 0.60 tot 0.85
Vervorming schip Cs = 1,00 - 0.9 tot 0.95
Vervorming water Cc = 1,00 - Kademuur: 0.8 tot 0.9, Paal: 0.9 tot 1.0
Netto op te nemen energie Enetto = 1/2*(m*Cm Enetto = 79338 Nm
= 79,34 kNm
Veiligheidsfactor( meestal 1.5 tot 2.0)  = 1,00 Trellex: 2.0, Fentek: 1,50 tot 2,0)

Op te nemen Enetto = 79,34 kNm

Op te nemen Enetto;d = 79,34 kNm

Energiehuishouding Berekening energiedissipatie tijdens de botsing


E=Ce*Cs*Cc = 0,59 - Relatieve veerenergie
Re = Ediss/Ekin;bruto =1- = 0,41 - Relatieve demper-energie (Energiereductie)
Rv=1-Re2 = 0,77 - Snelheidsreductie
INPUT Ekin;o = 134,70 Nm Totale energie in het systeem tijdens de botsing
DISSIPATIEEdiss = 55,36 Nm Energieverlies
OUTPUT Eveer = 79,34 Nm Energie die in veerenergie wordt omgezet
V* = 0,75 m/s Afstootsnelheid
Een deel van de gedissipeerde energie wordt omgezet in rotatie-energie, het overige deel
verdwijnt door demping.

Pagina 2 van 2
BAM Nelis De Ruiter bv

Bijlage 8 Capaciteit meerpaal

Funderingsadvies Aanvaarconstructie NDSM-werf,

te Amsterdam / augustus 2013 25


MVE/BB130956.46267 versie 2 Concept
Berekening stalen buispaal op stootbelasting en troskracht volgens Blum
Project : NDSM-werf
Projectnummer : 46267
Datum :
Opgesteld :
Onderdeel :
Opmerking :

GRONDGEGEVENS
droog = 17,00 kN/m3 volumegewicht droog  = 30,00 deg hoek v. inw. Wrijving
sat = 19,00 kN/m3 volumegewicht verzadigd = 0,52 rad
eff 9,00 kN/m4 volumegewicht effectief  = 0,00 - wandwrijving
 = 0,00 rad
Ka = 0,33 - actief
Kp = 3,00 - passief
PAALGEGEVENS
Deel Plaats Hoogte Du wanddikte fy;d I W E EI Mr;d cr
m mm mm MPa cm4 cm3 kNm
1 Boven 0,00 1220,00 25,00 360,00 1676076 27477 2,10E+05 3519759 9892 0,0077
2 Onder 22,04 1220,00 25,00 360,00 1676076 27477 2,10E+05 3519759 9892 0,0077
22,04
GEOMETRIE
ZFstoot = 0,50 m REF Aangrijpingspunt stootkracht t.o.v. ref
ZFtros 0,50 m REF Aangrijpingspunt troskracht t.o.v. ref
Zb = -12,00 m REF Bodemniveau t.o.v. ref
Zw = -0,40 m REF Waterpeil t.o.v. ref
Zt = 0,50 m REF Bovenkant paal t.o.v. ref
h1 = 0,00 m
L = 22,04 m Paallengte 12,00
Zokpaal = -21,54 m REF Onderkant paal t.o.v. ref

BELASTINGEN
Es;d 2,00 2,00
= 79,00 kNm
1,00 1,00
f;q 1,00 0,00 0,00
Ftros;d = 0,00 kN -50 -1,00 0 50 -1,00 0 5000 10000
f;q 1,50 -2,00 -2,00
-3,00 -3,00
-4,00 -4,00
BEREKENING OP STOOT VOLGENS BLUM -5,00 -5,00
Xm = 3,35 m-bodem Plaats Mmax -6,00 -6,00
-7,00 -7,00
to = 7,95 m-bodem Theoretische inheidiepte
-8,00 Hoogte [m REF] -8,00
t = 9,54 m-bodem Praktische inheidiepte -9,00 paal -9,00
Astitel

= -21,54 m ref Praktische inheidiepte -10,00 bodem


-10,00
-11,00 -11,00
L = 22,04 m Paallengte water
-12,00 -12,00
Ps = 669 kN Stootkracht -13,00 stoot -13,00
max = 0,414 m Doorbuiging t.p.v. stootkracht bij vloei -14,00 -14,00
Eu;d = 138,4 kNm Energiecapaciteit -15,00 -15,00
-16,00 -16,00
uc = 0,57 - Voldoet op energie -17,00 -17,00
Ms;d;max = 5645,8 kNm Optredend moment deel 2 -18,00 -18,00
d = 0,0010 -19,00 -19,00
-20,00 -20,00
rep = 0,0010
-21,00 -21,00
cr = 0,0077 -22,00 -22,00
uc = 0,13 - Voldoet op plooi -23,00 -23,00
Astitel Moment [kNm]
d = 0,24 m Verwachte maximale verplaatsing

BEREKENING OP TROS VOLGENS BLUM 2,00 2,00


Xm = 0 m-bodem Plaats Mmax
to = 0,00 m-bodem Theoretische inheidiepte 1,00 1,00
t = 0,00 m-bodem Praktische inheidiepte
= -12,00 m ref Praktische inheidiepte 0,00 0,00
-20 0 20 0 0,5 1
L = 12,50 m Paallengte
-1,00
Ms;d;max = 0 kNm Moment -1,00
uc = 0,00 - Voldoet op buiging
-2,00
d = 0,0000 -2,00
rep = 0,0000 -3,00
cr = 0,0077 -3,00
uc = 0,00 - Voldoet op plooi -4,00
max;d = 0,00 m Doorbuiging t.p.v. kracht -4,00
Hoogte [m |REF]

h1 = 0,00 m -5,00
h2 = 12,50 m -5,00 paal
Astitel

bodem -6,00
 = 0,000 rad Rotatie t.p.v. kracht
-6,00 water
bij;d = 0,00 m
tros -7,00
totaal;d 0,00 m Doorbuiging t.p.v. bovenkant paal
-7,00
-8,00

-8,00
Maatgevend: Stootbelasting -9,00
Controle overgang 1--2
-9,00
Ftros = 0 kN -10,00
h1 = 0,00
-10,00
M = Fmax*h1 = 0 kNm -11,00
Mr;d = 9892 kNm
-11,00 -12,00
uc = 0,00 - Voldoet op buiging
d = 0,0000
-12,00 -13,00
cr = 0,0077
uc = 0,00 - Voldoet op plooi -13,00 -14,00
Fstoot = 382 kN Astitel Moment [kNm]

h1 = 0,00
M = Fmax*h1 = 0 kNm
Mr;d = 9892 kNm
uc = 0,00 - Voldoet op buiging
d = 0,0000
cr = 0,0077
uc = 0,00 - Voldoet op plooi

B8 Berekening stalen buispaal op stoot en trosbelating 1-04 12-7-2013


BAM Nelis De Ruiter bv

Bijlage 9 Capaciteit meerpaal met corrosie

Funderingsadvies Aanvaarconstructie NDSM-werf,

te Amsterdam / augustus 2013 26


MVE/BB130956.46267 versie 2 Concept
Berekening stalen buispaal op stootbelasting en troskracht volgens Blum
Project : NDSM-werf
Projectnummer : 46267
Datum :
Opgesteld :
Onderdeel :
Opmerking :

GRONDGEGEVENS
droog = 17,00 kN/m3 volumegewicht droog  = 30,00 deg hoek v. inw. Wrijving
sat = 19,00 kN/m3 volumegewicht verzadigd = 0,52 rad
eff 9,00 kN/m4 volumegewicht effectief  = 0,00 - wandwrijving
 = 0,00 rad
Ka = 0,33 - actief
Kp = 3,00 - passief
PAALGEGEVENS
Deel Plaats Hoogte Du wanddikte fy;d I W E EI Mr;d cr
m mm mm MPa cm4 cm3 kNm
1 Boven 0,00 1220,00 24,00 360,00 1613019 26443 2,10E+05 3387340 9519 0,0073
2 Onder 21,93 1220,00 24,00 360,00 1613019 26443 2,10E+05 3387340 9519 0,0073
21,93
GEOMETRIE
ZFstoot = 0,50 m REF Aangrijpingspunt stootkracht t.o.v. ref
ZFtros 0,50 m REF Aangrijpingspunt troskracht t.o.v. ref
Zb = -12,00 m REF Bodemniveau t.o.v. ref
Zw = -0,40 m REF Waterpeil t.o.v. ref
Zt = 0,50 m REF Bovenkant paal t.o.v. ref
h1 = 0,00 m
L = 21,93 m Paallengte 12,00
Zokpaal = -21,43 m REF Onderkant paal t.o.v. ref

BELASTINGEN
Es;d 2,00 2,00
= 79,00 kNm
1,00 1,00
f;q 1,00 0,00 0,00
Ftros;d = 0,00 kN -50 -1,00 0 50 -1,00 0 5000 10000
f;q 1,50 -2,00 -2,00
-3,00 -3,00
-4,00 -4,00
BEREKENING OP STOOT VOLGENS BLUM -5,00 -5,00
Xm = 3,3 m-bodem Plaats Mmax -6,00 -6,00
-7,00 -7,00
to = 7,86 m-bodem Theoretische inheidiepte
-8,00 Hoogte [m REF] -8,00
t = 9,43 m-bodem Praktische inheidiepte -9,00 paal -9,00
Astitel

= -21,43 m ref Praktische inheidiepte -10,00 bodem


-10,00
-11,00 -11,00
L = 21,93 m Paallengte water
-12,00 -12,00
Ps = 644 kN Stootkracht -13,00 stoot -13,00
max = 0,410 m Doorbuiging t.p.v. stootkracht bij vloei -14,00 -14,00
Eu;d = 132,0 kNm Energiecapaciteit -15,00 -15,00
-16,00 -16,00
uc = 0,60 - Voldoet op energie -17,00 -17,00
Ms;d;max = 5697,9 kNm Optredend moment deel 2 -18,00 -18,00
d = 0,0010 -19,00 -19,00
-20,00 -20,00
rep = 0,0010
-21,00 -21,00
cr = 0,0073 -22,00 -22,00
uc = 0,14 - Voldoet op plooi -23,00 -23,00
Astitel Moment [kNm]
d = 0,25 m Verwachte maximale verplaatsing

BEREKENING OP TROS VOLGENS BLUM 2,00 2,00


Xm = 0 m-bodem Plaats Mmax
to = 0,00 m-bodem Theoretische inheidiepte 1,00 1,00
t = 0,00 m-bodem Praktische inheidiepte
= -12,00 m ref Praktische inheidiepte 0,00 0,00
-20 0 20 0 0,5 1
L = 12,50 m Paallengte
-1,00
Ms;d;max = 0 kNm Moment -1,00
uc = 0,00 - Voldoet op buiging
-2,00
d = 0,0000 -2,00
rep = 0,0000 -3,00
cr = 0,0073 -3,00
uc = 0,00 - Voldoet op plooi -4,00
max;d = 0,00 m Doorbuiging t.p.v. kracht -4,00
Hoogte [m |REF]

h1 = 0,00 m -5,00
h2 = 12,50 m -5,00 paal
Astitel

bodem -6,00
 = 0,000 rad Rotatie t.p.v. kracht
-6,00 water
bij;d = 0,00 m
tros -7,00
totaal;d 0,00 m Doorbuiging t.p.v. bovenkant paal
-7,00
-8,00

-8,00
Maatgevend: Stootbelasting -9,00
Controle overgang 1--2
-9,00
Ftros = 0 kN -10,00
h1 = 0,00
-10,00
M = Fmax*h1 = 0 kNm -11,00
Mr;d = 9519 kNm
-11,00 -12,00
uc = 0,00 - Voldoet op buiging
d = 0,0000
-12,00 -13,00
cr = 0,0073
uc = 0,00 - Voldoet op plooi -13,00 -14,00
Fstoot = 386 kN Astitel Moment [kNm]

h1 = 0,00
M = Fmax*h1 = 0 kNm
Mr;d = 9519 kNm
uc = 0,00 - Voldoet op buiging
d = 0,0000
cr = 0,0073
uc = 0,00 - Voldoet op plooi

B9 Berekening stalen buispaal op stoot en trosbelating 1-04 12-7-2013


BAM Nelis De Ruiter bv

Bijlage 10 Capaciteit paal remmingswerk

Funderingsadvies Aanvaarconstructie NDSM-werf,

te Amsterdam / augustus 2013 27


MVE/BB130956.46267 versie 2 Concept
Berekening stalen buispaal op stootbelasting en troskracht volgens Blum
Project : 46267
Projectnummer :
Datum :
Opgesteld :
Onderdeel : Remmingwerk
Opmerking :

GRONDGEGEVENS
droog = 17,00 kN/m3 volumegewicht droog  = 30,00 deg hoek v. inw. Wrijving
sat = 19,00 kN/m3 volumegewicht verzadigd = 0,52 rad
eff 19,00 kN/m4 volumegewicht effectief  = 0,00 - wandwrijving
 = 0,00 rad
Ka = 0,33 - actief
Kp = 3,00 - passief
PAALGEGEVENS
Deel Plaats Hoogte Du wanddikte fy;d I W E EI Mr;d cr
m mm mm MPa cm4 cm3 kNm
1 Boven 0,00 914,00 10,00 360,00 290147 6349 2,10E+05 609309 2286 0,0030
2 Onder 18,93 914,00 10,00 360,00 290147 6349 2,10E+05 609309 2286 0,0030
18,93
GEOMETRIE
ZFstoot = 0,50 m REF Aangrijpingspunt stootkracht t.o.v. ref
ZFtros 0,50 m REF Aangrijpingspunt troskracht t.o.v. ref
Zb = -12,00 m REF Bodemniveau t.o.v. ref
Zw = -0,40 m REF Waterpeil t.o.v. ref
Zt = 0,50 m REF Bovenkant paal t.o.v. ref
h1 = 0,00 m K 393,8295 kN/m
L = 18,93 m Paallengte 12,00
Zokpaal = -18,43 m REF Onderkant paal t.o.v. ref

BELASTINGEN
Es;d 2,00 2,00
= 1,00 kNm
1,00 1,00
f;q 1,00
0,00 0,00
Ftros;d = 160,00 kN -50 -1,00 0 50 -1,00 0 50 100
f;q 1,00 -2,00 -2,00
-3,00 -3,00
BEREKENING OP STOOT VOLGENS BLUM -4,00 -4,00
Xm = 2,02 m-bodem Plaats Mmax -5,00 -5,00

to -6,00 -6,00
= 5,36 m-bodem Theoretische inheidiepte
-7,00 Hoogte [m REF] -7,00
t = 6,43 m-bodem Praktische inheidiepte paal
-8,00 -8,00
Astitel

= -18,43 m ref Praktische inheidiepte -9,00 bodem -9,00


L = 18,93 m Paallengte -10,00 water -10,00
Ps = 165 kN Stootkracht -11,00 stoot -11,00
max = 0,419 m Doorbuiging t.p.v. stootkracht bij vloei -12,00 -12,00
Eu;d = 34,6 kNm Energiecapaciteit -13,00 -13,00
-14,00 -14,00
uc = 0,03 - Voldoet op energie
-15,00 -15,00
Ms;d;max = 66,0 kNm Optredend moment deel 2
-16,00 -16,00
d = 0,0000 -17,00 -17,00
rep = 0,0000 -18,00 -18,00
cr = 0,0030 -19,00 -19,00
uc = 0,02 - Voldoet op plooi -20,00 -20,00
Astitel Moment [kNm]
d = 0,01 m Verwachte maximale verplaatsing

BEREKENING OP TROS VOLGENS BLUM 2,00 2,00


Xm = 1,91 m-bodem Plaats Mmax
1,00 1,00
to = 5,14 m-bodem Theoretische inheidiepte
t = 6,17 m-bodem Praktische inheidiepte 0,00 0,00
-20 0 20 0 1000 2000 3000
= -18,17 m ref Praktische inheidiepte -1,00 -1,00
L = 18,67 m Paallengte
-2,00 -2,00
Ms;d;max = 2231 kNm Moment
uc = 0,98 - Voldoet op buiging -3,00 -3,00

d = 0,0017 -4,00 -4,00


rep = 0,0017
-5,00 -5,00
cr = 0,0030
uc = 0,56 - Voldoet op plooi -6,00 -6,00

max;d = 0,39 m Doorbuiging t.p.v. kracht -7,00 -7,00


Hoogte [m |REF]

h1 = 0,00 m
-8,00 paal
-8,00
h2 = 16,51 m
Astitel

-9,00 bodem -9,00


 = 0,036 rad Rotatie t.p.v. kracht
water
bij;d = 0,00 m -10,00 -10,00
tros
totaal;d 0,39 m Doorbuiging t.p.v. bovenkant paal
-11,00 -11,00

-12,00 -12,00

Maatgevend: Stootbelasting -13,00 -13,00


Controle overgang 1--2
-14,00 -14,00
Ftros = 160 kN
-15,00 -15,00
h1 = 0,00
M = Fmax*h1 = 0 kNm -16,00 -16,00
Mr;d = 2286 kNm -17,00 -17,00
uc = 0,00 - Voldoet op buiging
-18,00 -18,00
d = 0,0000
cr = 0,0030 -19,00 -19,00
uc = 0,00 - Voldoet op plooi -20,00 -20,00
Fstoot = 5 kN Astitel Moment [kNm]

h1 = 0,00
M = Fmax*h1 = 0 kNm
Mr;d = 2286 kNm
uc = 0,00 - Voldoet op buiging
d = 0,0000
cr = 0,0030
uc = 0,00 - Voldoet op plooi

B10 Berekening stalen buispaal op stoot en trosbelating 1-04 remmingwerk 12-7-2013


BAM Nelis De Ruiter bv

Bijlage 11 Capaciteit paal remmingwerk met corrosie

Funderingsadvies Aanvaarconstructie NDSM-werf,

te Amsterdam / augustus 2013 28


MVE/BB130956.46267 versie 2 Concept
Berekening stalen buispaal op stootbelasting en troskracht volgens Blum
Project : 46267
Projectnummer :
Datum :
Opgesteld :
Onderdeel : Remmingwerk
Opmerking :

GRONDGEGEVENS
droog = 17,00 kN/m3 volumegewicht droog  = 30,00 deg hoek v. inw. Wrijving
sat = 19,00 kN/m3 volumegewicht verzadigd = 0,52 rad
eff 19,00 kN/m4 volumegewicht effectief  = 0,00 - wandwrijving
 = 0,00 rad
Ka = 0,33 - actief
Kp = 3,00 - passief
PAALGEGEVENS
Deel Plaats Hoogte Du wanddikte fy;d I W E EI Mr;d cr
m mm mm MPa cm4 cm3 kNm
1 Boven 0,00 914,00 9,00 360,00 261994 5733 2,10E+05 550187 2064 0,0024
2 Onder 18,74 914,00 9,00 360,00 261994 5733 2,10E+05 550187 2064 0,0024
18,74
GEOMETRIE
ZFstoot = 0,50 m REF Aangrijpingspunt stootkracht t.o.v. ref
ZFtros 0,50 m REF Aangrijpingspunt troskracht t.o.v. ref
Zb = -12,00 m REF Bodemniveau t.o.v. ref
Zw = -0,40 m REF Waterpeil t.o.v. ref
Zt = 0,50 m REF Bovenkant paal t.o.v. ref
h1 = 0,00 m K 363,5643 kN/m
L = 18,74 m Paallengte 12,00
Zokpaal = -18,24 m REF Onderkant paal t.o.v. ref

BELASTINGEN
Es;d 2,00 2,00
= 1,00 kNm
1,00 1,00
f;q 1,00
0,00 0,00
Ftros;d = 145,00 kN -50 -1,00 0 50 -1,00 0 50 100
f;q 1,00 -2,00 -2,00
-3,00 -3,00
BEREKENING OP STOOT VOLGENS BLUM -4,00 -4,00
Xm = 1,94 m-bodem Plaats Mmax -5,00 -5,00

to -6,00 -6,00
= 5,20 m-bodem Theoretische inheidiepte
-7,00 Hoogte [m REF] -7,00
t = 6,24 m-bodem Praktische inheidiepte paal
-8,00 -8,00
Astitel

= -18,24 m ref Praktische inheidiepte -9,00 bodem -9,00


L = 18,74 m Paallengte -10,00 water -10,00
Ps = 150 kN Stootkracht -11,00 stoot -11,00
max = 0,412 m Doorbuiging t.p.v. stootkracht bij vloei -12,00 -12,00
Eu;d = 30,9 kNm Energiecapaciteit -13,00 -13,00
-14,00 -14,00
uc = 0,03 - Voldoet op energie
-15,00 -15,00
Ms;d;max = 66,9 kNm Optredend moment deel 2
-16,00 -16,00
d = 0,0001 -17,00 -17,00
rep = 0,0001 -18,00 -18,00
cr = 0,0024 -19,00 -19,00
uc = 0,02 - Voldoet op plooi -20,00 -20,00
Astitel Moment [kNm]
d = 0,01 m Verwachte maximale verplaatsing

BEREKENING OP TROS VOLGENS BLUM 2,00 2,00


Xm = 1,83 m-bodem Plaats Mmax
1,00 1,00
to = 4,99 m-bodem Theoretische inheidiepte
t = 5,98 m-bodem Praktische inheidiepte 0,00 0,00
-20 0 20 0 1000 2000 3000
= -17,98 m ref Praktische inheidiepte -1,00 -1,00
L = 18,48 m Paallengte
Ms;d;max -2,00 -2,00
= 2005 kNm Moment
uc = 0,97 - Voldoet op buiging -3,00 -3,00
d = 0,0017
-4,00 -4,00
rep = 0,0017
cr = 0,0024 -5,00 -5,00
uc = 0,69 - Voldoet op plooi -6,00 -6,00
max;d = 0,39 m Doorbuiging t.p.v. kracht
-7,00 -7,00
Hoogte [m |REF]

h1 = 0,00 m
paal
h2 = 16,39 m -8,00 -8,00
Astitel

bodem
 = 0,035 rad Rotatie t.p.v. kracht
-9,00 water -9,00
bij;d = 0,00 m
tros
totaal;d 0,39 m Doorbuiging t.p.v. bovenkant paal -10,00 -10,00

-11,00 -11,00

-12,00 -12,00
Maatgevend: Stootbelasting
Controle overgang 1--2 -13,00 -13,00
Ftros = 145 kN
-14,00 -14,00
h1 = 0,00
M = Fmax*h1 = 0 kNm -15,00 -15,00

Mr;d = 2064 kNm -16,00 -16,00


uc = 0,00 - Voldoet op buiging
-17,00 -17,00
d = 0,0000
cr = 0,0024 -18,00 -18,00
uc = 0,00 - Voldoet op plooi -19,00 -19,00
Fstoot = 5 kN Astitel Moment [kNm]

h1 = 0,00
M = Fmax*h1 = 0 kNm
Mr;d = 2064 kNm
uc = 0,00 - Voldoet op buiging
d = 0,0000
cr = 0,0024
uc = 0,00 - Voldoet op plooi

B11 Berekening stalen buispaal op stoot en trosbelating 1-04 remmingwerk 12-7-2013


BAM Nelis De Ruiter bv

Bijlage 12 Situatietekening

Funderingsadvies Aanvaarconstructie NDSM-werf,

te Amsterdam / augustus 2013 29


MVE/BB130956.46267 versie 2 Concept
1 2 3 4 5 6 7 8

A PPN N.A.P. -19.00 A


STEIGERCONSTRUCTIE MET HOUTEN DEK, 6 3
VOORZIEN VAN ANTISLIP

HEKWERK 13 7

A
PONTON 14
8
12
2
4
B PPN N.A.P. -22.00 1
11
9
B
REMMINGWERK WEST
15
REMMINGWERK OOST 16 10

18
5

17
20
TIJDELIJKE VEERAANLANDING
GVB VEREN
C ZIE TEK.NR. C
46267-005 19

D D
A

ZIE TEK.NR.
46267-007 BLAD 2/2
OT

E E
DUIKBO

REVISIE OMSCHRIJVING DATUM GETEKEND GECONTROLEERD GOEDGEKEURD


GVB Veren
NAAM/PARAAF DATUM WERKNUMMER BLAD STATUS PROJECT
GETEKEND SCHAAL
REVISIE
F GECONTROLEERD FORMAAT : TEKENINGNR. FIRMA F
OMSCHRIJVING
GOEDGEKEURD
FILENAAM 46267-TEK-007-002-DWB-CON.dwg
TEKENINGNR. 46267- 007
1 2 3 4 5 6 7 8
BAM Nelis De Ruiter bv

Bijlage 13 Doorsnede A-A

Funderingsadvies Aanvaarconstructie NDSM-werf,

te Amsterdam / augustus 2013 30


MVE/BB130956.46267 versie 2 Concept
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
450 500 500 500 500 500 500 450

80

80
80
A A

1160

1160

1160
800

800

800
DETAIL DETAIL DETAIL
1 2 3

80

80

80
HEB PROFIEL HEB PROFIEL HEB PROFIEL
AZOBE 100x200x1550 AZOBE 100x200x1550
BOVENAANZICHT REMMINGWERK WEST AZOBE 100x200x1550
UHMW-PE D=80mm UHMW-PE D=80mm UHMW-PE D=80mm
B SCHAAL 1:50 B
DETAIL 1 DETAIL 2 DETAIL 3
Plaat UHMW-PE80mm SCHAAL 1:25 SCHAAL 1:25 SCHAAL 1:25
A +1.70
+1.45

1.55
+0.60

1.25
C 0.00 N.A.P. C
-0.40 WATERLIJN

A
PAAL ST
PPN N.A.P. -19.00

VOORAANZICHT REMMINGWERK WEST DETAIL BEVESTIGING EN BEUGEL


D SCHAAL 1:50 D
SCHAAL 1:5
450 500 500 500 500 500

80

80

80
1.16

1160

1160

1160
800

800

800
E E
DETAIL DETAIL DETAIL
4 5 6

80

80

80
HEB PROFIEL HEB PROFIEL HEB PROFIEL
BOVENAANZICHT REMMINGWERK OOST AZOBE 100x200x1550 AZOBE 100x200x1550 AZOBE 100x200x1550
SCHAAL 1:50 UHMW-PE D=80mm UHMW-PE D=80mm UHMW-PE D=80mm

A
Plaat UHMW-PE80mm DETAIL 4 DETAIL 5 DETAIL 6
+1.70
SCHAAL 1:25 SCHAAL 1:25 SCHAAL 1:25
+1.45 100 180 350 180 100
F +1.15 F
AZOBE
80 80

1.55
+0.60

1.25
Schetsplaat h=15mm
0.00 N.A.P.
UHMW-PE80mm

1550
-0.40 WATERLIJN +0.60 bevestigd met moerbout M16 aan AZOBE

1250
A
PAAL ST
G PPN N.A.P. -19.00 Moerbout M16 G
N.A.P. 0.00

PRINCIPE DOORSNEDE A-A


SCHAAL 1:25
VOORAANZICHT REMMINGWERK OOST
SCHAAL 1:50

REVISIE OMSCHRIJVING DATUM GETEKEND GECONTROLEERD GOEDGEKEURD


GVB Veren
H NAAM/PARAAF DATUM WERKNUMMER BLAD STATUS
H
PROJECT
GETEKEND SCHAAL
REVISIE
GECONTROLEERD FORMAAT : TEKENINGNR. FIRMA
OMSCHRIJVING
VOOR SITUATIETEKENING ZIE TEK.NR. 46267-007 BLAD 1/2 GOEDGEKEURD
FILENAAM 46267-TEK-005-002-DWB-CON.dwg
TEKENINGNR. 46267- 005
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

A A

B B

C C

D D

E E
VOOR SITUATIETEKENING ZIE TEK.NR. 46267-007 BLAD 1/2

REVISIE OMSCHRIJVING DATUM GETEKEND GECONTROLEERD GOEDGEKEURD


GVB Veren
NAAM/PARAAF DATUM WERKNUMMER BLAD STATUS
PROJECT
DETAIL 1 DETAIL 2 GETEKEND SCHAAL
REVISIE
F SCHAAL 1:50 SCHAAL 1:50 GECONTROLEERD FORMAAT : TEKENINGNR. FIRMA F
OMSCHRIJVING
GOEDGEKEURD
FILENAAM 46267-TEK-007-002-DWB-CON.dwg
TEKENINGNR. 46267- 007
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
15 m

9m 11 m 9m
CONUSWEERSTAND (MPa) PLAATSELIJKE WRIJVINGSGETAL (%)
-2
WATERSPANNING ( x 10 MPa) WRIJVING (MPa) HELLING (o )
0 10 20 30 0 2 4 6 8 10
0 20 40 60 0 0.1 0.2 20 16 12 8 4 0
-6
DIEPTE (m) t.o.v. N.A.P.

-7
STEUNCASING 1.33 m

-8

-9

-10

-11

-12

-13

-14

-15

-16

-17

-18

0.20
-19 0.24

-20

-21
30.19

-22

-23

-24

-25

30.04
-26

30.28 0.20
-27 30.01

-28

-29

-30

-31

-32

-33

-34

-35

-36

-37

-38
0 10 20 30 0 0.1 0.2 0 2 4 6 8 10
0 20 40 60 20 16 12 8 4 0
Sondering CFI volgens NEN 5140 klasse 2 Water
Conuspuntoppervlakte : 1500 mm diepte 6.25 m X 121326 Opdrachtnummer :
Bodem -6.64 m N.A.P. Y 489080 46263-001G
BAM Nelis De Ruiter bv
Uitvoeringsdatum 3-11-2014 Locatiecode :
Postbus 14 1160 AA Zwanenburg Stenen Hoofd te Amsterdam
Telefoon (020) 4072222 / Fax (020) 4072223 Printdatum 4-11-2014 S01
PAGINA 1 van 1

0 4 8 12 16 20
0 20 40
CONUSWEERSTAND (MPa) PLAATSELIJKE WRIJVINGSGETAL (%)
-2
WATERSPANNING ( x 10 MPa) WRIJVING (MPa) HELLING (o )
0 10 20 30 0 2 4 6 8 10
0 20 40 60 0 0.1 0.2 20 16 12 8 4 0
-6
DIEPTE (m) t.o.v. N.A.P.

-7 STEUNCASING 1.95 m

-8

-9

-10

-11

-12

-13

-14

-15

-16

-17

-18
0.20

-19

-20

-21

-22

-23

-24

-25

-26

-27 0.21

-28

-29

-30

-31

-32

-33

-34

-35

-36

-37

-38
0 10 20 30 0 0.1 0.2 0 2 4 6 8 10
0 20 40 60 20 16 12 8 4 0
Sondering CFI volgens NEN 5140 klasse 2 Water
Conuspuntoppervlakte : 1500 mm diepte 5.75 m X 121316 Opdrachtnummer :
Bodem -6.14 m N.A.P. Y 489065 46263-001G
BAM Nelis De Ruiter bv
Uitvoeringsdatum 3-11-2014 Locatiecode :
Postbus 14 1160 AA Zwanenburg Stenen Hoofd te Amsterdam
Telefoon (020) 4072222 / Fax (020) 4072223 Printdatum 4-11-2014 S02
PAGINA 1 van 1

0 4 8 12 16 20
0 20 40
CONUSWEERSTAND (MPa) PLAATSELIJKE WRIJVINGSGETAL (%)
-2
WATERSPANNING ( x 10 MPa) WRIJVING (MPa) HELLING (o )
0 10 20 30 0 2 4 6 8 10
0 20 40 60 0 0.1 0.2 20 16 12 8 4 0
-6
DIEPTE (m) t.o.v. N.A.P.

-7
STEUNCASING 2.37 m
-8

-9

-10

-11

-12

-13

-14

-15

-16

-17

-18

-19

-20
30.28
0.20
-21

30.30
-22

-23

30.40
-24

-25

-26

-27

-28

-29

-30

-31

-32

-33

-34

-35

-36

-37

-38
0 10 20 30 0 0.1 0.2 0 2 4 6 8 10
0 20 40 60 20 16 12 8 4 0
Sondering CFI volgens NEN 5140 klasse 2 Water
Conuspuntoppervlakte : 1500 mm diepte 6.35 m X 121325 Opdrachtnummer :
Bodem -6.74 m N.A.P. Y 489054 46263-001G
BAM Nelis De Ruiter bv
Uitvoeringsdatum 3-11-2014 Locatiecode :
Postbus 14 1160 AA Zwanenburg Stenen Hoofd te Amsterdam
Telefoon (020) 4072222 / Fax (020) 4072223 Printdatum 4-11-2014 S03
PAGINA 1 van 1

0 4 8 12 16 20
0 20 40
CONUSWEERSTAND (MPa) PLAATSELIJKE WRIJVINGSGETAL (%)
-2
WATERSPANNING ( x 10 MPa) WRIJVING (MPa) HELLING (o )
0 10 20 30 0 2 4 6 8 10
0 20 40 60 0 0.1 0.2 20 16 12 8 4 0
-6
DIEPTE (m) t.o.v. N.A.P.

-7 STEUNCASING 2.17 m

-8

-9

-10

-11

-12

-13

-14

-15

-16

-17

-18

0.24
-19

-20

-21
30.15

-22

-23

-24

30.09
-25

-26

-27 31.00

-28

-29

-30

-31

-32

-33

-34

-35

-36

-37

-38
0 10 20 30 0 0.1 0.2 0 2 4 6 8 10
0 20 40 60 20 16 12 8 4 0
Sondering CFI volgens NEN 5140 klasse 2 Water
Conuspuntoppervlakte : 1500 mm diepte 5.95 m X 121335 Opdrachtnummer :
Bodem -6.35 m N.A.P. Y 489039 46263-001G
BAM Nelis De Ruiter bv
Uitvoeringsdatum 4-11-2014 Locatiecode :
Postbus 14 1160 AA Zwanenburg Stenen Hoofd te Amsterdam
Telefoon (020) 4072222 / Fax (020) 4072223 Printdatum 4-11-2014 S04
PAGINA 1 van 1

0 4 8 12 16 20
0 20 40
CONUSWEERSTAND (MPa) PLAATSELIJKE WRIJVINGSGETAL (%)
-2
WATERSPANNING ( x 10 MPa) WRIJVING (MPa) HELLING (o )
0 10 20 30 0 2 4 6 8 10
0 20 40 60 0 0.1 0.2 20 16 12 8 4 0
-7
DIEPTE (m) t.o.v. N.A.P.

-8 STEUNCASING 2.22 m

-9

-10

-11

-12

-13

-14

-15

-16

-17

-18

-19

-20

-21

-22

-23

-24

-25

-26

-27

-28

-29

-30

-31

-32

-33

-34

-35

-36

-37

-38

-39
0 10 20 30 0 0.1 0.2 0 2 4 6 8 10
0 20 40 60 20 16 12 8 4 0
Sondering CFI volgens NEN 5140 klasse 2 Water
Conuspuntoppervlakte : 1500 mm diepte 6.75 m X 121347 Opdrachtnummer :
Bodem -7.15 m N.A.P. Y 489084 46263-001G
BAM Nelis De Ruiter bv
Uitvoeringsdatum 4-11-2014 Locatiecode :
Postbus 14 1160 AA Zwanenburg Stenen Hoofd te Amsterdam
Telefoon (020) 4072222 / Fax (020) 4072223 Printdatum 4-11-2014 S05
PAGINA 1 van 1

0 4 8 12 16 20
0 20 40
CONUSWEERSTAND (MPa) PLAATSELIJKE WRIJVINGSGETAL (%)
-2
WATERSPANNING ( x 10 MPa) WRIJVING (MPa) HELLING (o )
0 10 20 30 0 2 4 6 8 10
0 20 40 60 0 0.1 0.2 20 16 12 8 4 0
-7
DIEPTE (m) t.o.v. N.A.P.

-8 STEUNCASING 2.15 m

-9

-10

-11

-12

-13

-14

-15

-16

-17

-18

0.20
-19 0.20

0.21

-20

-21

-22

-23

-24

-25

-26

-27 30.02

-28

-29

-30

-31

-32

-33

-34

-35

-36

-37

-38

-39
0 10 20 30 0 0.1 0.2 0 2 4 6 8 10
0 20 40 60 20 16 12 8 4 0
Sondering CFI volgens NEN 5140 klasse 2 Water
Conuspuntoppervlakte : 1500 mm diepte 6.75 m X 121343 Opdrachtnummer :
Bodem -7.15 m N.A.P. Y 489067 46263-001G
BAM Nelis De Ruiter bv
Uitvoeringsdatum 4-11-2014 Locatiecode :
Postbus 14 1160 AA Zwanenburg Stenen Hoofd te Amsterdam
Telefoon (020) 4072222 / Fax (020) 4072223 Printdatum 4-11-2014 S06
PAGINA 1 van 1

0 4 8 12 16 20
0 20 40
CONUSWEERSTAND (MPa) PLAATSELIJKE WRIJVINGSGETAL (%)
-2
WATERSPANNING ( x 10 MPa) WRIJVING (MPa) HELLING (o )
0 10 20 30 0 2 4 6 8 10
0 20 40 60 0 0.1 0.2 20 16 12 8 4 0
-7
DIEPTE (m) t.o.v. N.A.P.

-8
STEUNCASING 2.32 m

-9

-10

-11

-12

-13

-14

-15

-16

-17

-18

-19

-20

-21

-22

-23

-24

-25

-26

-27

-28

-29

-30

-31

-32

-33

-34

-35

-36

-37

-38

-39
0 10 20 30 0 0.1 0.2 0 2 4 6 8 10
0 20 40 60 20 16 12 8 4 0
Sondering CFI volgens NEN 5140 klasse 2 Water
Conuspuntoppervlakte : 1500 mm diepte 7.05 m X 121370 Opdrachtnummer :
Bodem -7.46 m N.A.P. Y 489068 46263-001G
BAM Nelis De Ruiter bv
Uitvoeringsdatum 4-11-2014 Locatiecode :
Postbus 14 1160 AA Zwanenburg Stenen Hoofd te Amsterdam
Telefoon (020) 4072222 / Fax (020) 4072223 Printdatum 4-11-2014 S07
PAGINA 1 van 1

0 4 8 12 16 20
0 20 40
Omschrijving: Verwerkt informatie over positie sonderingen en KPN Datakabel door GVB
Stalen buispaal verschoven B
Opsteller: WID Goedgekeurd en vrijgegeven: Paraaf: Datum:
M. Bruchner 12-11-2014
Omschrijving: Toevoeging leuning tussen het pand GOEDKOOP en de aanlanding
A
Opsteller: ASM Goedgekeurd en vrijgegeven: Paraaf: Datum:
M. Bruchner 05-11-2014
Gemeente Amsterdam
Ingenieursbureau Weesperstraat 430

Ingenieursbureau Postbus 12693


1100 AR Amsterdam
Telefoon: 020 2511111
Telefax: 020 2511199

Opdrachtgever:
Ontwikkelingsbedrijf Gemeente Amsterdam (OGA)
Project:
Verplaatsen pontaanlanding
Onderdeel:
Tijdelijke pontaanlanding Plaatkade
Hellingbaan inc. plateau + bordes + stalen trap + pontaanlanding
Fase: Behoort bij:

Schaal: Status:
1:5000, 1:200, 1:100, 1:20, 1:10 Definitief
Opsteller: Goedgekeurd en vrijgegeven: Paraaf: Datum: Formaat:
WID M. Bruchner 04-11-2014 A0
Projectnummer: Tekeningnummer: Bladnummer: Aantal bladen: Wijziging:

30687 001 1 1 B
Plotdatum: 12-11-2014 Documentnummer: Auteursrechten voorbehouden
Bestandsnaam: G:\GVB Casper van der Werf 12-11-2014\001-B-VG.dwg

0 cm 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

Bijlage 2 Grond parameters

078153168:A - Definitief ARCADIS 23


Type Bovenzijde
Klei -8,0
Veen -12,0
Zand zwak siltig -12,5
Zand kleieg -15,3
Klei, organisch -16,3
Zand kleieg -16,8
Zand -18,5

Klei
sat: 17 kN/m²,qc: 0,5 MPa, : 17,5°
c: 0 kN/m²

Veen
sat: 11 kN/m²,qc: 0,5 MPa, : 15,0°
c: 1,0 kN/m²

Zand, zwak siltig


sat: 20 kN/m²,qc: 10 MPa, : 30,0°

Zand, kleiig
sat: 20 kN/m²,qc: 5 MPa, : 25,0°
Basis veen
sat: 15 kN/m²,qc: 1,0 MPa, : 15,0°
c: 5 kN/m²
Zand, kleiig
sat: 20 kN/m²,qc: 6 MPa, : 25,0°

Zand, matig tot vast


sat: 20 kN/m²,qc: 22 MPa, : 32,5°

Eemklei
sat: 18 kN/m²,qc: 2,0 MPa, : 22,5°
c: 10 kN/m²

Bijlage 02 / 1 - 3
Type Bovenzijde
Klei -8,0
Veen -12,0
Zand zwak siltig -12,5
Zand -14,5
Zand kleieg -15,5
Klei, organisch -16,0
Zand -18,0
Klei zwak zandig -27,0

Klei
sat: 17 kN/m²,qc: 0,5 MPa, : 17,5°
c: 0 kN/m²

Veen
sat: 11 kN/m²,qc: 0,5 MPa, : 15,0°
c: 1,0 kN/m²

Zand, zwak siltig


sat: 20 kN/m²,qc: 10 MPa, : 30,0°

Zand, matig tot vast


sat: 20 kN/m²,qc: 17 MPa, : 32,5°

Zand, kleiig
sat: 20 kN/m²,qc: 5 MPa, : 25,0°

Basis veen
sat: 15 kN/m²,qc: 1,0 MPa, : 15,0°
c: 5 kN/m²

Zand, matig tot vast


sat: 20 kN/m²,qc: 22 MPa, : 32,5°

Eemklei
sat: 18 kN/m²,qc: 2,0 MPa, : 22,5°
c: 10 kN/m²

Bijlage 02 / 2 - 3
Type Bovenzijde
Klei -8,0
Klei, zwak zandig -16,0
Zand kleieg -15,5
Zand -21,0
Klei zwak zandig -27,5

Klei
sat: 17 kN/m²,qc: 0,5 MPa, : 17,5°
c: 0 kN/m²

Klei, zwak zandig


sat: 18 kN/m²,qc: 1,0 MPa, : 22,5°
c: 0 kN/m²

Zand, kleiig
sat: 20 kN/m²,qc: 8 MPa, : 25,0°

Zand, matig tot vast


sat: 20 kN/m²,qc: 18 MPa, : 32,5°

Eemklei
sat: 18 kN/m²,qc: 2,0 MPa, : 22,5°
c: 10 kN/m²

Bijlage 02 / 3 - 3
Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

Bijlage 3 Berekening afmeerpaal

24 ARCADIS 078153168:A - Definitief


Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

Bijlage 3.1 Dsheet berekening


bovengrens

078153168:A - Definitief ARCADIS 25


Report for D-Sheet Piling 9.3
Design of Sheet Pilings
Developed by Deltares

Company: ARCADIS Nederland BV


Mobiliteit

Date of report: 11/17/2014


Time of report: 4:58:53 PM

Date of calculation: 11/17/2014


Time of calculation: 4:58:13 PM

Filename: C:\FJK\Amsterdam stenen hoofd\Afmeer\Afmeerpaal E=212kNm bovengrens

Project identification: Amsterdam


Afmeerpaal 02
Bovengrens

Bijlage 03.1 / 1 - 8
ARCADIS Nederland BV Mobiliteit D-Sheet Piling 9.3

1 Table of Contents

1 Table of Contents 2
2 Summary 3
2.1 Overview of Maxima 3
3 Input Data 4
3.1 General Input Data 4
3.2 Pile Properties 4
3.3 Outline 4
3.4 Horizontal Forces 5
3.5 Water Level 5
3.6 Surface 5
3.7 Soil Material Properties 5
3.8 Soil Material Properties calculated using Brinch Hansen 5
3.9 Modulus of Subgrade Reaction 6
4 Calculation Results 7
4.1 Charts of Moments, Forces and Displacements 7
4.2 Moments, Forces and Displacements 7

11/17/2014 C:\..\Afmeerpaal E=212kNm bovengrens Page 2


Bijlage 03.1 / 2 - 8
ARCADIS Nederland BV Mobiliteit D-Sheet Piling 9.3

2 Summary

2.1 Overview of Maxima

Displacement Moment Shear force Mob. perc. Mob. perc.


moment resistance
[mm] [kNm] [kN] [%] [%]
496.7 -11775.9 2060.7 0.0 18.8

11/17/2014 C:\..\Afmeerpaal E=212kNm bovengrens Page 3


Bijlage 03.1 / 3 - 8
ARCADIS Nederland BV Mobiliteit D-Sheet Piling 9.3

3 Input Data

3.1 General Input Data

Model Single pile; Pile loaded by forces


Unit weight of water 9.81 kN/m³

3.2 Pile Properties

Length 24.00 m
Level top side 1.50 m
Number of sections 1

Section From To Stiffness Diameter Maximum


name EI moment
[m] [m] [kNm²] [m] [kNm]
Buis 1220x25 X... -22.50 1.50 3.5198E+06 1.22 12364.00

Section From To Red. factor Red. factor Note to


name EI max. moment reduction factor
[m] [m] [-] [-]
Buis 1220x25 X... -22.50 1.50 1.00 1.00

Section From To Corrected Corrected


name stiffness EI max. moment
[m] [m] [kNm²] [kNm]
Buis 1220x25 X... -22.50 1.50 3.5200E+06 12364.00

3.3 Outline

Outline

-0.40 Fafmeer -0.40

-7.50 -7.50

-9.00 -9.00
01a - Klei
-10.50 -10.50
01b - Klei
-11.50 Buis 1220x25 X65 -11.50
01c - Klei
-12.50 -12.50
01d - Klei
-13.50 -13.50
02a - Zand, zwak siltig
-14.50 -14.50
02b - Zand, zwak siltig
-15.50 -15.50
-16.00 03 - Zand, matig tot vast -16.00
-17.00 04 - Zand, kleiig -17.00
05a- Veen
-18.00 -18.00
05b- Veen
-19.50 -19.50
06a - Zand, mat tot vast
-21.00 -21.00
06b - Zand, mat. tot vast

06c - Zand, mat. tot vast

11/17/2014 C:\..\Afmeerpaal E=212kNm bovengrens Page 4


Bijlage 03.1 / 4 - 8
ARCADIS Nederland BV Mobiliteit D-Sheet Piling 9.3

3.4 Horizontal Forces

Name Level Load


[m] [kN]
Fafmeer 0.50 925.00

3.5 Water Level

Water level: -0.40 [m]

3.6 Surface

Surface level: -7.50 [m]

3.7 Soil Material Properties

Layer Level Unit weight Cohesion Friction angle Brinch


name Unsat Sat phi Hansen
[m] [kN/m³] [kN/m³] [kN/m²] [deg] used
01a - Klei -7.50 17.00 17.00 0.00 19.30 Yes
01b - Klei -9.00 17.00 17.00 0.00 19.30 Yes
01c - Klei -10.50 17.00 17.00 0.00 19.30 Yes
01d - Klei -11.50 17.00 17.00 0.00 19.30 Yes
02a - Zand, zw... -12.50 20.00 20.00 0.00 33.00 Yes
02b - Zand, zw... -13.50 20.00 20.00 0.00 33.00 Yes
03 - Zand, mati... -14.50 20.00 20.00 0.00 35.80 Yes
04 - Zand, kleiig -15.50 20.00 20.00 0.00 27.50 Yes
05a- Veen -16.00 15.00 15.00 5.50 16.50 Yes
05b- Veen -17.00 15.00 15.00 5.50 16.50 Yes
06a - Zand, mat... -18.00 20.00 20.00 0.00 35.80 Yes
06b - Zand, mat... -19.50 20.00 20.00 0.00 35.80 Yes
06c - Zand, mat... -21.00 20.00 20.00 0.00 35.80 Yes

Layer Level Earth pressure coefficients Additional pore pressure


name Active Neutral Passive Top Bottom
[m] [-] [-] [-] [kN/m²] [kN/m²]
01a - Klei -7.50 0.00 0.00 2.49 0.00 0.00
01b - Klei -9.00 0.00 0.00 2.98 0.00 0.00
01c - Klei -10.50 0.00 0.00 3.28 0.00 0.00
01d - Klei -11.50 0.00 0.00 3.47 0.00 0.00
02a - Zand, zw... -12.50 0.00 0.00 11.53 0.00 0.00
02b - Zand, zw... -13.50 0.00 0.00 12.23 0.00 0.00
03 - Zand, mati... -14.50 0.00 0.00 16.58 0.00 0.00
04 - Zand, kleiig -15.50 0.00 0.00 8.14 0.00 0.00
05a- Veen -16.00 0.00 0.00 3.10 0.00 0.00
05b- Veen -17.00 0.00 0.00 3.16 0.00 0.00
06a - Zand, mat... -18.00 0.00 0.00 19.45 0.00 0.00
06b - Zand, mat... -19.50 0.00 0.00 20.41 0.00 0.00
06c - Zand, mat... -21.00 0.00 0.00 21.28 0.00 0.00

3.8 Soil Material Properties calculated using Brinch Hansen

Layer Level Fictive


name cohesion
[m] [kN/m²]
01a - Klei -7.50 0.00
01b - Klei -9.00 0.00
01c - Klei -10.50 0.00
01d - Klei -11.50 0.00
02a - Zand, zw... -12.50 0.00
02b - Zand, zw... -13.50 0.00
03 - Zand, mati... -14.50 0.00
04 - Zand, kleiig -15.50 0.00
05a- Veen -16.00 24.54
05b- Veen -17.00 24.74

11/17/2014 C:\..\Afmeerpaal E=212kNm bovengrens Page 5


Bijlage 03.1 / 5 - 8
ARCADIS Nederland BV Mobiliteit D-Sheet Piling 9.3

Layer Level Fictive


name cohesion
[m] [kN/m²]
06a - Zand, mat... -18.00 0.00
06b - Zand, mat... -19.50 0.00
06c - Zand, mat... -21.00 0.00

3.9 Modulus of Subgrade Reaction

Layer Level Menard E-Mod Soil type Branch 1


name used Menard Menard Top Bottom
[m] [kN/m²] [kN/m³] [kN/m³]
01a - Klei -7.50 Yes 2110.00 Clay 3943.09 3943.09
01b - Klei -9.00 Yes 2110.00 Clay 3943.09 3943.09
01c - Klei -10.50 Yes 2110.00 Clay 3943.09 3943.09
01d - Klei -11.50 Yes 2110.00 Clay 3943.09 3943.09
02a - Zand, zw... -12.50 Yes 14370.00 Sand 48598.72 48598.72
02b - Zand, zw... -13.50 Yes 14370.00 Sand 48598.72 48598.72
03 - Zand, mati... -14.50 Yes 24420.00 Sand 82587.39 82587.39
04 - Zand, kleiig -15.50 Yes 7180.00 Sand 24282.45 24282.45
05a- Veen -16.00 Yes 5920.00 Peat 6550.00 6550.00
05b- Veen -17.00 Yes 5920.00 Peat 6550.00 6550.00
06a - Zand, mat... -18.00 Yes 31600.00 Sand 106869.84 106869.84
06b - Zand, mat... -19.50 Yes 31600.00 Sand 106869.84 106869.84
06c - Zand, mat... -21.00 Yes 31600.00 Sand 106869.84 106869.84

11/17/2014 C:\..\Afmeerpaal E=212kNm bovengrens Page 6


Bijlage 03.1 / 6 - 8
ARCADIS Nederland BV Mobiliteit D-Sheet Piling 9.3

4 Calculation Results

Number of iterations: 5

4.1 Charts of Moments, Forces and Displacements

Moments/Forces/Displacements
Bending Moments [kNm] Shear Forces [kN] Displacements [mm]

0 0 0

-2 -2 -2

-4 -4 -4

-6 -6 -6

-8 -8 -8
01a - Klei

-10 01b - Klei -10 -10


Depth [m]

Depth [m]

Depth [m]
Buis 1220x25 X65
01c - Klei
-12 01d - Klei -12 -12

02a - Zand, zwak siltig


-14 02b - Zand, zwak siltig -14 -14

03 - Zand, matig tot vast


-16 04 - Zand, kleiig -16 -16
05a- Veen
05b- Veen
-18 -18 -18
06a - Zand, mat tot vast

-20 -20 -20


06b - Zand, mat. tot vast

-22 06c - Zand, mat. tot vast -22 -22

-15000 -10000 -5000 0 5000 10000 15000 -2000 -1000 0 1000 2000 3000 -600 -400 -200 0 200 400 600

Max: 0.0 - Min: -11775.9 Max: 2060.7 - Min: -925.0 Max: 496.7

4.2 Moments, Forces and Displacements

Segment Level Moment Shear force Displacement


number [m] [kNm] [kN] [mm]
1 1.50 0.0 0.0 496.7
1 0.50 0.0 0.0 457.6
2 0.50 0.0 -925.0 457.6
2 -0.40 -832.5 -925.0 422.4
3 -0.40 -832.5 -925.0 422.4
3 -1.58 -1927.1 -925.0 376.6
4 -1.58 -1927.1 -925.0 376.6
4 -2.77 -3021.7 -925.0 331.4
5 -2.77 -3021.7 -925.0 331.4
5 -3.95 -4116.3 -925.0 287.5
6 -3.95 -4116.3 -925.0 287.5
6 -5.13 -5210.8 -925.0 245.2
7 -5.13 -5210.8 -925.0 245.2
7 -6.32 -6305.4 -925.0 205.0
8 -6.32 -6305.4 -925.0 205.0
8 -7.50 -7400.0 -925.0 167.3
9 -7.50 -7400.0 -925.0 167.3
9 -8.25 -8092.2 -918.9 144.9
10 -8.25 -8092.2 -918.9 144.9
10 -9.00 -8775.2 -900.5 123.8
11 -9.00 -8775.2 -900.5 123.8
11 -9.75 -9437.7 -863.8 104.1
12 -9.75 -9437.7 -863.8 104.1
12 -10.50 -10067.2 -812.4 85.9
13 -10.50 -10067.2 -812.4 85.9
13 -11.50 -10831.8 -711.9 64.2

11/17/2014 C:\..\Afmeerpaal E=212kNm bovengrens Page 7


Bijlage 03.1 / 7 - 8
ARCADIS Nederland BV Mobiliteit D-Sheet Piling 9.3

Segment Level Moment Shear force Displacement


number [m] [kNm] [kN] [mm]
14 -11.50 -10831.8 -711.9 64.2
14 -12.50 -11477.7 -575.0 45.5
15 -12.50 -11477.7 -575.0 45.5
15 -13.50 -11775.9 2.5 30.1
16 -13.50 -11775.9 2.5 30.1
16 -14.50 -11403.7 767.2 18.0
17 -14.50 -11404.4 770.1 18.0
17 -15.50 -10043.7 1921.1 9.2
18 -15.50 -10043.0 1923.7 9.2
18 -16.00 -9051.5 2033.9 5.8
19 -16.00 -9051.5 2033.8 5.8
19 -17.00 -7001.6 2059.7 1.0
20 -17.00 -7001.6 2059.6 1.0
20 -18.00 -4942.2 2055.3 -1.8
21 -18.00 -4942.2 2055.2 -1.8
21 -18.75 -3483.7 1815.2 -3.0
22 -18.75 -3483.7 1815.0 -3.0
22 -19.50 -2240.6 1490.1 -3.6
23 -19.50 -2240.6 1490.0 -3.6
23 -20.25 -1258.6 1124.8 -3.8
24 -20.25 -1258.6 1124.7 -3.8
24 -21.00 -556.6 746.7 -3.9
25 -21.00 -556.6 746.6 -3.9
25 -21.75 -138.2 369.9 -3.8
26 -21.75 -138.2 369.9 -3.8
26 -22.50 0.0 0.0 -3.7
Max -11775.9 2059.7 496.7
Max, minor nodes incl. -11775.9 2060.7 496.7

End of Report

11/17/2014 C:\..\Afmeerpaal E=212kNm bovengrens Page 8


Bijlage 03.1 / 8 - 8
Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

Bijlage 3.2 Dsheet berekening


ondergrens

26 ARCADIS 078153168:A - Definitief


Report for D-Sheet Piling 9.3
Design of Sheet Pilings
Developed by Deltares

Company: ARCADIS Nederland BV


Mobiliteit

Date of report: 11/18/2014


Time of report: 10:12:02 AM

Date of calculation: 11/17/2014


Time of calculation: 4:59:51 PM

Filename: C:\FJK\Amsterdam stenen hoofd\Afmeer\Afmeerpaal E=212kNm rep

Project identification: Amsterdam


Afmeerpaal 02
Ondergrens

Bijlage 03.2 / 1 - 8
ARCADIS Nederland BV Mobiliteit D-Sheet Piling 9.3

1 Table of Contents

1 Table of Contents 2
2 Summary 3
2.1 Overview of Maxima 3
3 Input Data 4
3.1 General Input Data 4
3.2 Pile Properties 4
3.3 Outline 4
3.4 Horizontal Forces 5
3.5 Water Level 5
3.6 Surface 5
3.7 Soil Material Properties 5
3.8 Soil Material Properties calculated using Brinch Hansen 5
3.9 Modulus of Subgrade Reaction 6
4 Calculation Results 7
4.1 Charts of Moments, Forces and Displacements 7
4.2 Moments, Forces and Displacements 7

11/18/2014 C:\..\Afmeer\Afmeerpaal E=212kNm rep Page 2


Bijlage 03.2 / 2 - 8
ARCADIS Nederland BV Mobiliteit D-Sheet Piling 9.3

2 Summary

2.1 Overview of Maxima

Displacement Moment Shear force Mob. perc. Mob. perc.


moment resistance
[mm] [kNm] [kN] [%] [%]
513.6 -11355.9 2015.5 0.0 18.3

11/18/2014 C:\..\Afmeer\Afmeerpaal E=212kNm rep Page 3


Bijlage 03.2 / 3 - 8
ARCADIS Nederland BV Mobiliteit D-Sheet Piling 9.3

3 Input Data

3.1 General Input Data

Model Single pile; Pile loaded by forces


Unit weight of water 9.81 kN/m³

3.2 Pile Properties

Length 24.00 m
Level top side 1.50 m
Number of sections 1

Section From To Stiffness Diameter Maximum


name EI moment
[m] [m] [kNm²] [m] [kNm]
Buis 1220x25 X70 -22.50 1.50 3.2217E+06 1.22 12115.00

Section From To Red. factor Red. factor Note to


name EI max. moment reduction factor
[m] [m] [-] [-]
Buis 1220x25 X70 -22.50 1.50 1.00 1.00

Section From To Corrected Corrected


name stiffness EI max. moment
[m] [m] [kNm²] [kNm]
Buis 1220x25 X70 -22.50 1.50 3.2220E+06 12115.00

3.3 Outline

Outline

-0.40 Fafmeer -0.40

-7.50 -7.50

-9.00 -9.00
01a - Klei
-10.50 -10.50
01b - Klei
-11.50 Buis 1220x25 X70 -11.50
01c - Klei
-12.50 -12.50
01d - Klei
-13.50 -13.50
02a - Zand, zwak siltig
-14.50 -14.50
02b - Zand, zwak siltig
-15.50 -15.50
-16.00 03 - Zand, matig tot vast -16.00
-17.00 04 - Zand, kleiig -17.00
05a- Veen
-18.00 -18.00
05b- Veen
-19.50 -19.50
06a - Zand, mat tot vast
-21.00 -21.00
06b - Zand, mat. tot vast

06c - Zand, mat. tot vast

11/18/2014 C:\..\Afmeer\Afmeerpaal E=212kNm rep Page 4


Bijlage 03.2 / 4 - 8
ARCADIS Nederland BV Mobiliteit D-Sheet Piling 9.3

3.4 Horizontal Forces

Name Level Load


[m] [kN]
Fafmeer 0.50 895.00

3.5 Water Level

Water level: -0.40 [m]

3.6 Surface

Surface level: -7.50 [m]

3.7 Soil Material Properties

Layer Level Unit weight Cohesion Friction angle Brinch


name Unsat Sat phi Hansen
[m] [kN/m³] [kN/m³] [kN/m²] [deg] used
01a - Klei -7.50 17.00 17.00 0.00 19.30 Yes
01b - Klei -9.00 17.00 17.00 0.00 19.30 Yes
01c - Klei -10.50 17.00 17.00 0.00 19.30 Yes
01d - Klei -11.50 17.00 17.00 0.00 19.30 Yes
02a - Zand, zw... -12.50 20.00 20.00 0.00 33.00 Yes
02b - Zand, zw... -13.50 20.00 20.00 0.00 33.00 Yes
03 - Zand, mati... -14.50 20.00 20.00 0.00 35.80 Yes
04 - Zand, kleiig -15.50 20.00 20.00 0.00 27.50 Yes
05a- Veen -16.00 15.00 15.00 5.50 16.50 Yes
05b- Veen -17.00 15.00 15.00 5.50 16.50 Yes
06a - Zand, mat... -18.00 20.00 20.00 0.00 35.80 Yes
06b - Zand, mat... -19.50 20.00 20.00 0.00 35.80 Yes
06c - Zand, mat... -21.00 20.00 20.00 0.00 35.80 Yes

Layer Level Earth pressure coefficients Additional pore pressure


name Active Neutral Passive Top Bottom
[m] [-] [-] [-] [kN/m²] [kN/m²]
01a - Klei -7.50 0.00 0.00 2.49 0.00 0.00
01b - Klei -9.00 0.00 0.00 2.98 0.00 0.00
01c - Klei -10.50 0.00 0.00 3.28 0.00 0.00
01d - Klei -11.50 0.00 0.00 3.47 0.00 0.00
02a - Zand, zw... -12.50 0.00 0.00 11.53 0.00 0.00
02b - Zand, zw... -13.50 0.00 0.00 12.23 0.00 0.00
03 - Zand, mati... -14.50 0.00 0.00 16.58 0.00 0.00
04 - Zand, kleiig -15.50 0.00 0.00 8.14 0.00 0.00
05a- Veen -16.00 0.00 0.00 3.10 0.00 0.00
05b- Veen -17.00 0.00 0.00 3.16 0.00 0.00
06a - Zand, mat... -18.00 0.00 0.00 19.45 0.00 0.00
06b - Zand, mat... -19.50 0.00 0.00 20.41 0.00 0.00
06c - Zand, mat... -21.00 0.00 0.00 21.28 0.00 0.00

3.8 Soil Material Properties calculated using Brinch Hansen

Layer Level Fictive


name cohesion
[m] [kN/m²]
01a - Klei -7.50 0.00
01b - Klei -9.00 0.00
01c - Klei -10.50 0.00
01d - Klei -11.50 0.00
02a - Zand, zw... -12.50 0.00
02b - Zand, zw... -13.50 0.00
03 - Zand, mati... -14.50 0.00
04 - Zand, kleiig -15.50 0.00
05a- Veen -16.00 24.54
05b- Veen -17.00 24.74

11/18/2014 C:\..\Afmeer\Afmeerpaal E=212kNm rep Page 5


Bijlage 03.2 / 5 - 8
ARCADIS Nederland BV Mobiliteit D-Sheet Piling 9.3

Layer Level Fictive


name cohesion
[m] [kN/m²]
06a - Zand, mat... -18.00 0.00
06b - Zand, mat... -19.50 0.00
06c - Zand, mat... -21.00 0.00

3.9 Modulus of Subgrade Reaction

Layer Level Menard E-Mod Soil type Branch 1


name used Menard Menard Top Bottom
[m] [kN/m²] [kN/m³] [kN/m³]
01a - Klei -7.50 Yes 2110.00 Clay 3943.09 3943.09
01b - Klei -9.00 Yes 2110.00 Clay 3943.09 3943.09
01c - Klei -10.50 Yes 2110.00 Clay 3943.09 3943.09
01d - Klei -11.50 Yes 2110.00 Clay 3943.09 3943.09
02a - Zand, zw... -12.50 Yes 14370.00 Sand 48598.72 48598.72
02b - Zand, zw... -13.50 Yes 14370.00 Sand 48598.72 48598.72
03 - Zand, mati... -14.50 Yes 24420.00 Sand 82587.39 82587.39
04 - Zand, kleiig -15.50 Yes 7180.00 Sand 24282.45 24282.45
05a- Veen -16.00 Yes 5920.00 Peat 6550.00 6550.00
05b- Veen -17.00 Yes 5920.00 Peat 6550.00 6550.00
06a - Zand, mat... -18.00 Yes 31600.00 Sand 106869.84 106869.84
06b - Zand, mat... -19.50 Yes 31600.00 Sand 106869.84 106869.84
06c - Zand, mat... -21.00 Yes 31600.00 Sand 106869.84 106869.84

11/18/2014 C:\..\Afmeer\Afmeerpaal E=212kNm rep Page 6


Bijlage 03.2 / 6 - 8
ARCADIS Nederland BV Mobiliteit D-Sheet Piling 9.3

4 Calculation Results

Number of iterations: 5

4.1 Charts of Moments, Forces and Displacements

Moments/Forces/Displacements
Bending Moments [kNm] Shear Forces [kN] Displacements [mm]

0 0 0

-2 -2 -2

-4 -4 -4

-6 -6 -6

-8 -8 -8
01a - Klei

-10 01b - Klei -10 -10


Depth [m]

Depth [m]

Depth [m]
Buis 1220x25 X70
01c - Klei
-12 01d - Klei -12 -12

02a - Zand, zwak siltig


-14 02b - Zand, zwak siltig -14 -14

03 - Zand, matig tot vast


-16 04 - Zand, kleiig -16 -16
05a- Veen
05b- Veen
-18 -18 -18
06a - Zand, mat tot vast

-20 -20 -20


06b - Zand, mat. tot vast

-22 06c - Zand, mat. tot vast -22 -22

-15000 -10000 -5000 0 5000 10000 -2000 -1000 0 1000 2000 3000 -600 -400 -200 0 200 400 600

Max: 0.0 - Min: -11355.9 Max: 2015.5 - Min: -895.0 Max: 513.6

4.2 Moments, Forces and Displacements

Segment Level Moment Shear force Displacement


number [m] [kNm] [kN] [mm]
1 1.50 0.0 0.0 513.6
1 0.50 0.0 0.0 472.8
2 0.50 0.0 -895.0 472.8
2 -0.40 -805.5 -895.0 436.2
3 -0.40 -805.5 -895.0 436.2
3 -1.58 -1864.6 -895.0 388.4
4 -1.58 -1864.6 -895.0 388.4
4 -2.77 -2923.7 -895.0 341.4
5 -2.77 -2923.7 -895.0 341.4
5 -3.95 -3982.8 -895.0 295.7
6 -3.95 -3982.8 -895.0 295.7
6 -5.13 -5041.8 -895.0 251.7
7 -5.13 -5041.8 -895.0 251.7
7 -6.32 -6100.9 -895.0 209.9
8 -6.32 -6100.9 -895.0 209.9
8 -7.50 -7160.0 -895.0 170.7
9 -7.50 -7160.0 -895.0 170.7
9 -8.25 -7829.7 -888.9 147.5
10 -8.25 -7829.7 -888.9 147.5
10 -9.00 -8490.2 -870.5 125.6
11 -9.00 -8490.2 -870.5 125.6
11 -9.75 -9130.2 -833.8 105.2
12 -9.75 -9130.2 -833.8 105.2
12 -10.50 -9737.2 -782.4 86.4
13 -10.50 -9737.2 -782.4 86.4
13 -11.50 -10471.8 -681.9 64.0

11/18/2014 C:\..\Afmeer\Afmeerpaal E=212kNm rep Page 7


Bijlage 03.2 / 7 - 8
ARCADIS Nederland BV Mobiliteit D-Sheet Piling 9.3

Segment Level Moment Shear force Displacement


number [m] [kNm] [kN] [mm]
14 -11.50 -10471.8 -681.9 64.0
14 -12.50 -11087.7 -545.0 44.9
15 -12.50 -11087.7 -545.0 44.9
15 -13.50 -11355.9 32.5 29.2
16 -13.50 -11355.9 32.5 29.2
16 -14.50 -10953.7 797.2 17.0
17 -14.50 -10954.4 800.0 17.0
17 -15.50 -9577.1 1898.6 8.1
18 -15.50 -9576.4 1901.1 8.1
18 -16.00 -8600.0 1996.6 4.9
19 -16.00 -8600.0 1996.5 4.9
19 -17.00 -6590.9 2015.5 0.2
20 -17.00 -6590.9 2015.4 0.2
20 -18.00 -4578.5 2006.0 -2.3
21 -18.00 -4578.5 2005.9 -2.3
21 -18.75 -3173.1 1726.3 -3.3
22 -18.75 -3173.1 1726.1 -3.3
22 -19.50 -2005.3 1381.4 -3.7
23 -19.50 -2005.3 1381.3 -3.7
23 -20.25 -1106.1 1015.9 -3.7
24 -20.25 -1106.1 1015.9 -3.7
24 -21.00 -479.9 656.2 -3.6
25 -21.00 -479.9 656.2 -3.6
25 -21.75 -116.9 315.9 -3.4
26 -21.75 -116.9 315.9 -3.4
26 -22.50 0.0 0.0 -3.1
Max -11355.9 2015.5 513.6
Max, minor nodes incl. -11355.9 2015.5 513.6

End of Report

11/18/2014 C:\..\Afmeer\Afmeerpaal E=212kNm rep Page 8


Bijlage 03.2 / 8 - 8
Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

Bijlage 3.3 Controle lokale plooi

078153168:A - Definitief ARCADIS 27


PROJECT: Hotuhaven
SECTION: Controle afmeerpaal 02
DATE: 18-11-2014

Local buckling according to Quay Wall Handbook


Limitations:
Piles
- Method to be used for steel quality up to X70 (fy = 483 MPa)
- The formulas are valid for water head differences less than 4 m.
D
- Critical strain formula for pile fill with sand is only valid for 70 120
t
- Alternatively EN 1993-1-6 may be used for piles filled with sand. In that case the resistance may be
increased with a factor 1.13. This is only allowed for D/t < 100 and for D/t ² < 170.
Fill
- Sand shall be present in the area of the section subject to evaluation of the resistance. Sand may be
loose or medium dense, if naturally available.
- In actively filled piles the sand fill shall be compacted, obtaining 70% relative density or qc >10 MPa.
- Clay filled piles shall be considered as empty piles. Sand filled piles with thin (< 0.5 D) intermediate clay
layers may be considered as sand filled piles.
- The results of this work should not be used for dolphin piles of for other applications where plastic
deformation capacity is required. The effect of use of the recommendations for these type of structures
may result in choosing larger D/t ² values, which is not recommendable.

Geometry:
zt : m -> Top level of pile t Dout
zb : m -> Tip level of pile

ctc : m -> c.t.c of piles


(0 means only pile)
Pile:
Do : mm -> Outside section of pile
c.t.c.
t: mm -> Wall thickness

Do t
Di Do 2t 1170 mm -> Internal section of pile r 597.5 mm -> Radius of
2
middle surface
3 2 3 2 6 3
Apile 2 rt 93.9 10 mm -> Area Wpile r t 27.5 10 mm -> Section modulus
Do
3 10 4
Ipile r t 1.675 10 mm -> Moment of inertia
Sheet Pile:
tfl : mm -> flange thickness
tflange

tweb : mm -> web thickness tweb


hsp : mm -> height sheet pile
hps;total

Local buckling according to CUR Quay Walls 18-11-2014 1 of 6

Bijlage 03.3 / 1 - 6
PROJECT: Hotuhaven
SECTION: Controle afmeerpaal 02
DATE: 18-11-2014

Material properties:
E: N/mm² -> Modulus of Elasticity

Pile : N/mm² -> Steel quality pile


N
fyp 450 -> Yield strength pile
mm²

SP : N/mm² -> Steel quality sheet pile


N
fysp 240 -> Yield strength sheet pile
mm²

M0 : -> Safety factor

Classification of pile according to NEN-EN-1993-1-1, 5.5.2 / Table 5.2:


D [mm] t [mm] fy [N/mm²] [-] d/t ² [-] class 1: d/t ² <=50 / class 2: 50<d/t ² <=70
1220 25 450 0.723 93 class 3: 70<d/t ² <=90 / class 4: 90<d/t ²

Class 4: cross-sections are those in which local buckling will occur before the attainment of yield stress in one or more
parts of the cross-section.

Local buckling of pile according to NEN-EN-1993-1-6, D.1.2.2 (5):


Cylinders need not be checked against meridional shell buckling if they satisfy:
r E r E
0.03 23.9 0.03 14 x_ctrl "Check buckling"
t fyp t fyp

Load cases:
From sheet pile:
1 2 kNm
M sd.sheet tweb fysp 0 -> Maximum moment from sheet pile
4 m
2 M sd.sheet kN
wy.Ed if t fl = 0 0 0 -> Maximal support reaction
h sp tfl m
From soil and pile:
Soil loads are passive and/or active soil pressures, inside pile neutral soil pressure.
Amount of cases [min 1 / max 5, Left side is water/excavation side]:

Cases : -> i 1 cases

1 Soil
Pile loads
Level Left Right Intern
Case
`h water `h water `h N ed Med
[m +NAP] [kN/m²] [kN/m²] [kN/m²] [kN/m²] [kN/m²] [kN] [kNm]
1 -13.5 0.0 0.0 0.0 0.0 0.0 0 11776
0.0 0.0 0.0 0.0 0.0 0 0

Type of pile:
Pile : -> Choose type of pile (empty or fill)

Local buckling according to CUR Quay Walls 18-11-2014 2 of 6

Bijlage 03.3 / 2 - 6
PROJECT: Hotuhaven
SECTION: Controle afmeerpaal 02
DATE: 18-11-2014

Soil pressure:
External soil pressure should be calculated with a factor c.t.c/Do (pressure acting on the pile is equal to de c.t.c
between piles per m width of pile)
ctc ctc
qL if ctc = 0 1 'hL wL qR if ctc = 0 1 'hR wRi q Int 'hI
i Do i i i Do i i i
The pressures outside the tube had been averaged for the determination of the mean pressure on the
tube
qL qR
i i kN kN
q max q Int if q L 0 0
i 2 i i m² m²
qR q Int otherwise
i i

qL qR qInt q
Case
[kN/m²] [kN/m²] [kN/m²] [kN/m²]
1 0.0 0.0 0.0 0.0

qL q R q Int
Out of roundness:q
cases
NokN
re-rounding
kN effect
kN caused
kN by soil support to the sides of the tube has been taken in account
2 2 2 2
a- m m fabrication
Due to m m [NEN-EN 1993-1-6, tabel 8.1]:

Cl : Ur.max Cl Do 0.016 -> class [A:Excellent/B:High/C:Normal]

1
ea Ur.max Cl Do Do 4.76 mm
4

b- Due to tensile forces from secondary members [NEN-EN 1993-5, D.2.1]:


3 3
Et 1 2 1 r
EI eb min 0.1 r wy.Ed 0.00 mm
12 2 2 EI

c- Due to soil pressure:


4
q r
1 i kN T
ec if q L = 0 ec ( 0.00 ) mm
i 24 EI m²
4
q r
1 i
otherwise
12 EI

d- Ovalization as a second order effect:

M ed 2 5
r
i i T
ed ed ( 1.37 ) mm
i E Ipile i 2
t

Local buckling according to CUR Quay Walls 18-11-2014 3 of 6

Bijlage 03.3 / 3 - 6
PROJECT: Hotuhaven
SECTION: Controle afmeerpaal 02
DATE: 18-11-2014

Radius of top and bottom side of the tube due to ovalisation [r`]:
12 EI MN
k steel 25.745
4 m³
r
10kPa MN
k sand 0.017 ( Esand 10 kPa, see article 6.6.6.4, bending moment evaluation for sand-filled tube)
r m³
k steel
k 0.999
k steel k sand
r
etot ea eb ec ed et etot k if Pile = 2 r'
i i i i i i et
i
etot otherwise 1 3
i r
T
et ( 6.1 ) mm
T
r' ( 616.5 ) mm
Bending moment evaluation:
Do fyp
Critical strain: 48.8 y
t E
3
cri if Pile = 1 cr 7.639 10

t Do
0.25 0.0025 if 120
r' t
i
t
0.1 otherwise
r'
i
if Pile = 2
2 Do
t
7 if 70 120
r' t
i
"Out of range, to be calculated as empty pile" otherwise

cri
T
Parameter : ( 3.56 )
i
y

T
Plasticity rate: if 1 ( 16.3 ) °
i 2 i

1
asin otherwise
i

Local buckling according to CUR Quay Walls 18-11-2014 4 of 6

Bijlage 03.3 / 4 - 6
PROJECT: Hotuhaven
SECTION: Controle afmeerpaal 02
DATE: 18-11-2014

Bending moment as function of the plasticity rate:


2
Wpile fyp ( 2 r) t fyp
M el.d 11236 kNm M pl.d 14605 kNm
M0 M0
1 i
MR cos M pl.d if 1 MR 14411 kNm
i 2 sin i i
i
M el.d otherwise
i

Reduced bending moment and normal force:


meff;Sd due to tensile forces from secondary members is:
1 1 1
wy.Ed r wy.Ed r
2 kNm
meff.Sd.1 meff.Sd.1 0.0
2 m
meff;Sd due to soil:
1 2 3 2 2
q r q r
8 i 8 3 i kN kNm
meff.Sd.2 if q L = 0 meff.Sd.2 0.0
i 2 m² m
1 2 1 2
q r q r
4 i 4 i
otherwise
2

2 fyp
t kNm
mpl.Rd mpl.Rd 63.92
4 M0 m

meff.Sd.1 meff.Sd.2
i T
c1 4 2 3 c1 ( 2.00 )
i mpl.Rd
c1
i 2 T
g0 g0 ( 1.00 )
i 6 3
2 et
i T
gi 1 g ( 0.99 )
3r
T
si s1 Pile i s ( 1.00 )

M Rd g0 M M Rd 14312 kNm
i i g i si Ri
fyp
Npl Apile and NRd g 0 Npl NRd 38395 kN
M0 i i

Local buckling according to CUR Quay Walls 18-11-2014 5 of 6

Bijlage 03.3 / 5 - 6
PROJECT: Hotuhaven
SECTION: Controle afmeerpaal 02
DATE: 18-11-2014

Combined bending and normal force evaluation:

1.7
M ed Ned
i i
Ned M ed UC:
i i M Rd NRd
i i
0 kN 11776 kNm
0.823

Ctrl: x_ctrl "OK"

Local buckling according to CUR Quay Walls 18-11-2014 6 of 6

Bijlage 03.3 / 6 - 6
Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

Bijlage 4 Berekening remmingwerk

28 ARCADIS 078153168:A - Definitief


Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

Bijlage 4.1 SCIA engineer sondering


S02

078153168:A - Definitief ARCADIS 29


Project Houthaven amsterdam Auteur
Onderdeel Remmingwerken sondering S02 Datum 18-11-2014
Omschrijving SCIA

1. Rekenmodel

Z
Y
X

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 02.esa 1/21
Bijlage 04.1 / 1 - 21
Project Houthaven amsterdam Auteur
Onderdeel Remmingwerken sondering S02 Datum 18-11-2014
Omschrijving SCIA

2. Inhoudsopgave
1. Rekenmodel 1
2. Inhoudsopgave 2
3. Project 2
4. Materialen 2
5. Doorsneden 3
6. Niet-lineaire functies 5
7. Veren eerste paal bovengrens 13
8. Veren eerste paal ondergrens 13
9. Knoopondersteuningen bovengrens 14
10. Knoopondersteuningen ondergrens 14
11. Belastingsgevallen 14
12. Belastingsgevallen 15
12.1. Belastingsgevallen - BG1 15
12.1.1. BG1 / Totale waarde 15
12.2. Belastingsgevallen - BG2 15
12.2.1. BG1 / Totale waarde 16
12.3. Belastingsgevallen - BG3 16
12.3.1. BG1 / Totale waarde 16
13. Niet-lineaire combinaties 16
13.1. Niet-lineaire combinaties - NL1 17
13.1.1. Vervormingen van staaf; uy 17
13.1.2. Interne krachten in staaf; Mz 18
13.1.3. Spanning; Von Mises 18
14. Niet-lineaire combinaties 19
14.1. Niet-lineaire combinaties - NL2 19
14.1.1. Vervormingen van staaf; bovengrens 19
14.1.2. Vervormingen van staaf; ondergrens 19
14.1.3. Spanning; Von Mises 20
14.2. Niet-lineaire combinaties - NL3 20
14.2.1. Vervormingen van staaf; bovengrens 20
14.2.2. Vervormingen van staaf; ondergrens 21
14.2.3. Spanning; Von Mises 21

3. Project
Licentienaam Onbekend
Project Houthaven amsterdam
Onderdeel Remmingwerken sondering S02
Omschrijving SCIA
Datum 18-11-2014
Constructie Algemeen XYZ
Aantal knopen : 90
Aantal staven : 88
Aantal platen : 0
Aantal vaste lichamen : 0
Aantal gebruikte doorsneden : 5
Aantal belastingsgevallen : 13
Aantal gebruikte materialen : 2
2
Gravitatieversnelling [m/s ] 9.810
Nationale norm EC - EN

4. Materialen
Staal EC3
Naam Massa eenheid E-mod Poisson - nu Onderlimiet Bovenlimiet Fy (bereik) Fu (bereik)
3
[kg/m ] [MPa] [mm] [mm] [MPa] [MPa]
G-mod Thermisch uitz.
[MPa] [m/mK]
X65 7850.0 2.1000e+05 0.3 0 16 420.0 500.0
8.0769e+04 0.00 16 40 400.0 500.0
Staal
X52
Thermisch uitz. [m/mK] 0.00

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 02.esa 2/21
Bijlage 04.1 / 2 - 21
Project Houthaven amsterdam Auteur
Onderdeel Remmingwerken sondering S02 Datum 18-11-2014
Omschrijving SCIA

3
Massa eenheid [kg/m ] 7850.0
E-mod [MPa] 2.1000e+05
Poisson - nu 0.3
Onafhankelijke G-modulus
G-mod [MPa] 8.0769e+04
Log. decrement (niet-uniforme demping enkel) 0.025
Therm. exp. (brand) [m/mK] 0.00
Specifieke hitte [J/gK] 6.0000e-01
Thermische geleiding [W/mK] 4.5000e+01
Fu [MPa] 460.0
Fy [MPa] 360.0
Verklaring van symbolen
Log. decrement Deze materiaal dempingseigenschap
(niet-uniforme demping is enkel toegpast in het geval van het
enkel) niet-uniform is
demping is geactiveerd voor
dynamische analyse (zie project
functionaliteit).
Gelieve op te merken, dat
niet-uniforme demping een specifieke
licentie benodigd,
welke geen deel uit maakt van het
standaard dynamische pakket.

5. Doorsneden
3 3
CS2 Wplz [m ], Wply [m ] 1.7508e-02 1.7508e-02
6 4
Type Buis Iw [m ], It [m ] 0.0000e+00 1.2263e-02
Uitgebreid 914; 22 dy [mm], dz [mm] 0 0
Vorm type Dikke wanden cYUCS [mm], cZUCS 457 457
Onderdeelmateriaal X65 [mm]
Bouwwijze Algemeen [deg] 0.00
Knik y-y, Knik z-z d d Mply+ [Nm], Mply- [Nm] 7.88e+06 7.88e+06
2
A [m ] 6.1651e-02 Mplz+ [Nm], Mplz- [Nm] 7.88e+06 7.88e+06
2 2 2 2
Ay [m ], Az [m ] 3.9248e-02 3.9248e-02 AL [m /m], AD [m /m] 2.8713e+00 5.6043e+00
4 4
Iy [m ], Iz [m ] 6.1354e-03 6.1354e-03 y [mm], z [mm] 0 0
3 3
Welz [m ], Wely [m ] 1.3425e-02 1.3425e-02 Afbeelding z
3 3
Wplz [m ], Wply [m ] 1.7508e-02 1.7508e-02
6 4
Iw [m ], It [m ] 0.0000e+00 1.2263e-02
dy [mm], dz [mm] 0 0
cYUCS [mm], cZUCS 457 457
D 914

y
t 22
[mm]
[deg] 0.00
Mply+ [Nm], Mply- [Nm] 7.88e+06 7.88e+06
Mplz+ [Nm], Mplz- [Nm] 7.88e+06 7.88e+06
2 2
AL [m /m], AD [m /m] 2.8713e+00 5.6043e+00 CS4
y [mm], z [mm] 0 0 Type Buis
Afbeelding z
Uitgebreid 762; 25
Vorm type Dikke wanden
Onderdeelmateriaal X52
Bouwwijze Algemeen
Knik y-y, Knik z-z d d
D 914

y
2
A [m ] 5.7884e-02
t 22
2 2
Ay [m ], Az [m ] 3.6850e-02 3.6850e-02
4 4
Iy [m ], Iz [m ] 3.9346e-03 3.9346e-03
3 3
Welz [m ], Wely [m ] 1.0327e-02 1.0327e-02
3 3
CS3 Wplz [m ], Wply [m ] 1.3584e-02 1.3584e-02
6 4
Type Buis Iw [m ], It [m ] 0.0000e+00 7.8602e-03
Uitgebreid 914; 22 dy [mm], dz [mm] 0 0
Vorm type Dikke wanden cYUCS [mm], cZUCS 381 381
Onderdeelmateriaal X65 [mm]
Bouwwijze Algemeen [deg] 0.00
Knik y-y, Knik z-z d d Mply+ [Nm], Mply- [Nm] 4.89e+06 4.89e+06
2
A [m ] 6.1651e-02 Mplz+ [Nm], Mplz- [Nm] 4.89e+06 4.89e+06
2 2 2 2
Ay [m ], Az [m ] 3.9248e-02 3.9248e-02 AL [m /m], AD [m /m] 2.3938e+00 4.6305e+00
4 4
Iy [m ], Iz [m ] 6.1354e-03 6.1354e-03 y [mm], z [mm] 0 0
3 3
Welz [m ], Wely [m ] 1.3425e-02 1.3425e-02

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 02.esa 3/21
Bijlage 04.1 / 3 - 21
Project Houthaven amsterdam Auteur
Onderdeel Remmingwerken sondering S02 Datum 18-11-2014
Omschrijving SCIA

Afbeelding z CS5
Type Buis
Uitgebreid 914; 22
Vorm type Dikke wanden
Onderdeelmateriaal X65
D 762
y
t 25
Bouwwijze Algemeen
Knik y-y, Knik z-z d d
2
A [m ] 6.1651e-02
2 2
Ay [m ], Az [m ] 3.9248e-02 3.9248e-02
CS1 4 4
Iy [m ], Iz [m ] 6.1354e-03 6.1354e-03
Type Buis 3
Welz [m ], Wely [m ]
3
1.3425e-02 1.3425e-02
Uitgebreid 914; 22 3
Wplz [m ], Wply [m ]
3
1.7508e-02 1.7508e-02
Vorm type Dikke wanden 6 4
Iw [m ], It [m ] 0.0000e+00 1.2263e-02
Onderdeelmateriaal X65 dy [mm], dz [mm] 0 0
Bouwwijze Algemeen cYUCS [mm], cZUCS 457 457
Knik y-y, Knik z-z d d [mm]
2
A [m ] 6.1651e-02 [deg] 0.00
2 2
Ay [m ], Az [m ] 3.9248e-02 3.9248e-02 Mply+ [Nm], Mply- [Nm] 7.88e+06 7.88e+06
4 4
Iy [m ], Iz [m ] 6.1354e-03 6.1354e-03 Mplz+ [Nm], Mplz- [Nm] 7.88e+06 7.88e+06
3 3
Welz [m ], Wely [m ] 1.3425e-02 1.3425e-02 2 2
AL [m /m], AD [m /m] 2.8713e+00 5.6043e+00
3 3
Wplz [m ], Wply [m ] 1.7508e-02 1.7508e-02 y [mm], z [mm] 0 0
6 4
Iw [m ], It [m ] 0.0000e+00 1.2263e-02 Afbeelding z
dy [mm], dz [mm] 0 0
cYUCS [mm], cZUCS 457 457
[mm]
[deg] 0.00

D 914
y
Mply+ [Nm], Mply- [Nm] 7.88e+06 7.88e+06
t 22

Mplz+ [Nm], Mplz- [Nm] 7.88e+06 7.88e+06


2 2
AL [m /m], AD [m /m] 2.8713e+00 5.6043e+00
y [mm], z [mm] 0 0
Afbeelding z
D 914

y
t 22

Verklaring van symbolen Verklaring van symbolen


A Gebied cYUCS Zwaartepunt coordinaten in Y-richting
Ay Afschuifoppervlak in hoofd y-richting van het invoer assen systeem
Az Afschuifoppervlak in hoofd z-richting cZUCS Zwaartepunt coordinaten in Z-richting
Iy Tweede moment van het gebied rond van het invoer assen systeem
de hoofd y-as Rotatiehoek van het hoofd assen
Iz Tweede moment van het gebied rond systeem
de hoofd z-as IYZLCS Product moment van het gebied in
Welz Elastische doorsnede modulus rond de het LCS systeem
hoofd z-as Mply+ Plastisch moment rond de hoofd y-as
Wely Elastische doorsnede modulus rond de voor een positief My moment
hoofd y-as Mply- Plastisch moment rond de hoofd y-as
Wplz Plastische doorsnede modulus rond de voor een negatief My moment
hoofd z-as Mplz+ Plastisch moment rond de hoofd z-as
Wply Plastische doorsnede modulus rond de voor een positief Mz moment
hoofd y-as Mplz- Plastisch moment rond de hoofd z-as
Iw Welvings constante - Niet berekend of voor een negatief Mz moment
vereenvoudigd AL Omtrek per eenheidslengte
It Torsie constante - Niet berekend of AD Uithardingsoppervlakte per
vereenvoudigd eenheidslengte
dy Afschuif middencoordinaat in hoofd y Mono-symmetrische constante rond
y-richting gemeten vanaf het de hoofd y-as
zwaartepunt - Niet berekend of z Mono-symmetrische constante rond
vereenvoudigd de hoofd z-as
dz Afschuif middencoordinaat in hoofd
z-richting gemeten vanaf het
zwaartepunt - Niet berekend of
vereenvoudigd

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 02.esa 4/21
Bijlage 04.1 / 4 - 21
Project Houthaven amsterdam Auteur
Onderdeel Remmingwerken sondering S02 Datum 18-11-2014
Omschrijving SCIA

6. Niet-lineaire functies
Naam Type u/F Positief einde Negatief einde Tekenen
-8 H Translatie -1.7700e-03[m] / -8.1000e-03[MN] Vrij Vrij

1.7700e-03[m] / 8.1000e-03[MN]
-9 H Translatie -6.1500e-03[m] / -2.8100e-02[MN] Vrij Vrij

6.1500e-03[m] / 2.8100e-02[MN]
-10 H Translatie -1.1380e-02[m] / -5.2000e-02[MN] Vrij Vrij

1.1380e-02[m] / 5.2000e-02[MN]
-11 H Translatie -1.7160e-02[m] / -7.8400e-02[MN] Vrij Vrij

1.7160e-02[m] / 7.8400e-02[MN]
-12 H Translatie -2.3350e-02[m] / -1.0670e-01[MN] Vrij Vrij

2.3350e-02[m] / 1.0670e-01[MN]

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 02.esa 5/21
Bijlage 04.1 / 5 - 21
Project Houthaven amsterdam Auteur
Onderdeel Remmingwerken sondering S02 Datum 18-11-2014
Omschrijving SCIA

Naam Type u/F Positief einde Negatief einde Tekenen


-13 H Translatie -8.8800e-03[m] / -4.5430e-01[MN] Vrij Vrij

8.8800e-03[m] / 4.5430e-01[MN]
-14 H Translatie -1.1750e-02[m] / -6.0160e-01[MN] Vrij Vrij

1.1750e-02[m] / 6.0160e-01[MN]
-15 H Translatie -1.1190e-02[m] / -9.7120e-01[MN] Vrij Vrij

1.1190e-02[m] / 9.7120e-01[MN]
-16 H Translatie -1.6360e-02[m] / -4.1870e-01[MN] Vrij Vrij

1.6360e-02[m] / 4.1870e-01[MN]
-17 H Translatie -3.7940e-02[m] / -3.1210e-01[MN] Vrij Vrij

3.7940e-02[m] / 3.1210e-01[MN]

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 02.esa 6/21
Bijlage 04.1 / 6 - 21
Project Houthaven amsterdam Auteur
Onderdeel Remmingwerken sondering S02 Datum 18-11-2014
Omschrijving SCIA

Naam Type u/F Positief einde Negatief einde Tekenen


-18 H Translatie -1.1199e-01[m] / -9.2120e-01[MN] Vrij Vrij

1.1199e-01[m] / 9.2120e-01[MN]
-19 H Translatie -1.5180e-02[m] / -1.7070e+00[MN] Vrij Vrij

1.5180e-02[m] / 1.7070e+00[MN]
-20 H Translatie -1.7370e-02[m] / -1.9530e+00[MN] Vrij Vrij

1.7370e-02[m] / 1.9530e+00[MN]
-21 H Translatie -1.9620e-02[m] / -2.2056e+00[MN] Vrij Vrij

1.9620e-02[m] / 2.2056e+00[MN]
-22 H Translatie -2.1920e-02[m] / -2.4643e+00[MN] Vrij Vrij

2.1920e-02[m] / 2.4643e+00[MN]

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 02.esa 7/21
Bijlage 04.1 / 7 - 21
Project Houthaven amsterdam Auteur
Onderdeel Remmingwerken sondering S02 Datum 18-11-2014
Omschrijving SCIA

Naam Type u/F Positief einde Negatief einde Tekenen


-23 H Translatie -2.4270e-02[m] / -2.7283e+00[MN] Vrij Vrij

2.4270e-02[m] / 2.7283e+00[MN]
-24 H Translatie -2.6660e-02[m] / -2.9973e+00[MN] Vrij Vrij

2.6660e-02[m] / 2.9973e+00[MN]
-25 H Translatie -2.9090e-02[m] / -3.2705e+00[MN] Vrij Vrij

2.9090e-02[m] / 3.2705e+00[MN]
-8 L Translatie -2.5500e-03[m] / -7.0000e-03[MN] Vrij Vrij

2.5500e-03[m] / 7.0000e-03[MN]
-9 L Translatie -8.7900e-03[m] / -2.4100e-02[MN] Vrij Vrij

8.7900e-03[m] / 2.4100e-02[MN]

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 02.esa 8/21
Bijlage 04.1 / 8 - 21
Project Houthaven amsterdam Auteur
Onderdeel Remmingwerken sondering S02 Datum 18-11-2014
Omschrijving SCIA

Naam Type u/F Positief einde Negatief einde Tekenen


-10 L Translatie -1.6190e-02[m] / -4.4400e-02[MN] Vrij Vrij

1.6190e-02[m] / 4.4400e-02[MN]
-11 L Translatie -2.4360e-02[m] / -6.6800e-02[MN] Vrij Vrij

2.4360e-02[m] / 6.6800e-02[MN]
-12 L Translatie -3.3040e-02[m] / -9.0600e-02[MN] Vrij Vrij

3.3040e-02[m] / 9.0600e-02[MN]
-13 L Translatie -1.1880e-02[m] / -3.5840e-01[MN] Vrij Vrij

1.1880e-02[m] / 3.5840e-01[MN]
-14 L Translatie -1.5640e-02[m] / -4.7170e-01[MN] Vrij Vrij

1.5640e-02[m] / 4.7170e-01[MN]

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 02.esa 9/21
Bijlage 04.1 / 9 - 21
Project Houthaven amsterdam Auteur
Onderdeel Remmingwerken sondering S02 Datum 18-11-2014
Omschrijving SCIA

Naam Type u/F Positief einde Negatief einde Tekenen


-15 L Translatie -1.4560e-02[m] / -7.4540e-01[MN] Vrij Vrij

1.4560e-02[m] / 7.4540e-01[MN]
-16 L Translatie -2.3460e-02[m] / -3.4310e-01[MN] Vrij Vrij

2.3460e-02[m] / 3.4310e-01[MN]
-17 L Translatie -5.7700e-02[m] / -2.6370e-01[MN] Vrij Vrij

5.7700e-02[m] / 2.6370e-01[MN]
-18 L Translatie -1.5525e-01[m] / -7.0950e-01[MN] Vrij Vrij

1.5525e-01[m] / 7.0950e-01[MN]
-19 L Translatie -1.9220e-02[m] / -1.2821e+00[MN] Vrij Vrij

1.9220e-02[m] / 1.2821e+00[MN]

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 02.esa 10/21
Bijlage 04.1 / 10 - 21
Project Houthaven amsterdam Auteur
Onderdeel Remmingwerken sondering S02 Datum 18-11-2014
Omschrijving SCIA

Naam Type u/F Positief einde Negatief einde Tekenen


-20 L Translatie -2.1890e-02[m] / -1.4603e+00[MN] Vrij Vrij

2.1890e-02[m] / 1.4603e+00[MN]
-21 L Translatie -2.4610e-02[m] / -1.6423e+00[MN] Vrij Vrij

2.4610e-02[m] / 1.6423e+00[MN]
-22 L Translatie -2.7390e-02[m] / -1.8278e+00[MN] Vrij Vrij

2.7390e-02[m] / 1.8278e+00[MN]
-23 L Translatie -3.0220e-02[m] / -2.0162e+00[MN] Vrij Vrij

3.0220e-02[m] / 2.0162e+00[MN]
-24 L Translatie -3.3080e-02[m] / -2.2074e+00[MN] Vrij Vrij

3.3080e-02[m] / 2.2074e+00[MN]

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 02.esa 11/21
Bijlage 04.1 / 11 - 21
Project Houthaven amsterdam Auteur
Onderdeel Remmingwerken sondering S02 Datum 18-11-2014
Omschrijving SCIA

Naam Type u/F Positief einde Negatief einde Tekenen


-25 L Translatie -3.5990e-02[m] / -2.4010e+00[MN] Vrij Vrij

3.5990e-02[m] / 2.4010e+00[MN]
-24.5 L Translatie -6.9630e-02[m] / -1.7687e+00[MN] Vrij Vrij

6.9630e-02[m] / 1.7687e+00[MN]
-25.5 L Translatie -7.5820e-02[m] / -1.9259e+00[MN] Vrij Vrij

7.5820e-02[m] / 1.9259e+00[MN]

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 02.esa 12/21
Bijlage 04.1 / 12 - 21
Project Houthaven amsterdam Auteur
Onderdeel Remmingwerken sondering S02 Datum 18-11-2014
Omschrijving SCIA

7. Veren eerste paal 8. Veren eerste


bovengrens paal ondergrens

Z Z
Y Y
X X

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 02.esa 13/21
Bijlage 04.1 / 13 - 21
Project Houthaven amsterdam Auteur
Onderdeel Remmingwerken sondering S02 Datum 18-11-2014
Omschrijving SCIA

9. Knoopondersteuningen bovengrens
Naam Systeem X Stijfheid X Funktie X Y Stijfheid Y Funktie Y Z Rx Ry Rz
[MN/m] [MN/m]
Sn1 GCS Niet-lineair 4.6000e+00 -8 H Niet-lineair 4.6000e+00 -8 H Vrij Vrij Vrij Vrij
Sn2 GCS Niet-lineair 4.6000e+00 -9 H Niet-lineair 4.6000e+00 -9 H Vrij Vrij Vrij Vrij
Sn3 GCS Niet-lineair 4.6000e+00 -10 H Niet-lineair 4.6000e+00 -10 H Vrij Vrij Vrij Vrij
Sn4 GCS Niet-lineair 4.6000e+00 -11 H Niet-lineair 4.6000e+00 -11 H Vrij Vrij Vrij Vrij
Sn5 GCS Niet-lineair 4.6000e+00 -12 H Niet-lineair 4.6000e+00 -12 H Vrij Vrij Vrij Vrij
Sn6 GCS Niet-lineair 5.1200e+01 -13 H Niet-lineair 5.1200e+01 -13 H Vrij Vrij Vrij Vrij
Sn7 GCS Niet-lineair 5.1200e+01 -14 H Niet-lineair 5.1200e+01 -14 H Vrij Vrij Vrij Vrij
Sn8 GCS Niet-lineair 8.6800e+01 -15 H Niet-lineair 8.6800e+01 -15 H Vrij Vrij Vrij Vrij
Sn9 GCS Niet-lineair 2.5600e+01 -16 H Niet-lineair 2.5600e+01 -16 H Vrij Vrij Vrij Vrij
Sn10 GCS Niet-lineair 8.2000e+00 -17 H Niet-lineair 8.2000e+00 -17 H Vrij Vrij Vrij Vrij
Sn11 GCS Niet-lineair 8.2000e+00 -18 H Niet-lineair 8.2000e+00 -18 H Vrij Vrij Vrij Vrij
Sn12 GCS Niet-lineair 1.1250e+02 -19 H Niet-lineair 1.1250e+02 -19 H Vrij Vrij Vrij Vrij
Sn13 GCS Niet-lineair 1.1240e+02 -20 H Niet-lineair 1.1240e+02 -20 H Vast Vrij Vrij Vrij

10. Knoopondersteuningen ondergrens


Naam Systeem X Stijfheid X Funktie X Y Stijfheid Y Funktie Y Z Rx Ry Rz
[MN/m] [MN/m]
Sn55 GCS Niet-lineair 2.7000e+00 -8 L Niet-lineair 2.7000e+00 -8 L Vrij Vrij Vrij Vrij
Sn56 GCS Niet-lineair 2.7000e+00 -9 L Niet-lineair 2.7000e+00 -9 L Vrij Vrij Vrij Vrij
Sn57 GCS Niet-lineair 2.7000e+00 -10 L Niet-lineair 2.7000e+00 -10 L Vrij Vrij Vrij Vrij
Sn58 GCS Niet-lineair 2.7000e+00 -11 L Niet-lineair 2.7000e+00 -11 L Vrij Vrij Vrij Vrij
Sn59 GCS Niet-lineair 2.7000e+00 -12 L Niet-lineair 2.7000e+00 -12 L Vrij Vrij Vrij Vrij
Sn60 GCS Niet-lineair 3.0200e+01 -13 L Niet-lineair 3.0200e+01 -13 L Vrij Vrij Vrij Vrij
Sn61 GCS Niet-lineair 3.0200e+01 -14 L Niet-lineair 3.0200e+01 -14 L Vrij Vrij Vrij Vrij
Sn62 GCS Niet-lineair 5.1200e+01 -15 L Niet-lineair 5.1200e+01 -15 L Vrij Vrij Vrij Vrij
Sn63 GCS Niet-lineair 1.4600e+01 -16 L Niet-lineair 1.4600e+01 -16 L Vrij Vrij Vrij Vrij
Sn64 GCS Niet-lineair 4.6000e+00 -17 L Niet-lineair 4.6000e+00 -17 L Vrij Vrij Vrij Vrij
Sn65 GCS Niet-lineair 4.6000e+00 -18 L Niet-lineair 4.6000e+00 -18 L Vrij Vrij Vrij Vrij
Sn66 GCS Niet-lineair 6.6700e+01 -19 L Niet-lineair 6.6700e+01 -19 L Vrij Vrij Vrij Vrij
Sn67 GCS Niet-lineair 6.6700e+01 -20 L Niet-lineair 6.6700e+01 -20 L Vast Vrij Vrij Vrij

11. Belastingsgevallen
Naam Omschrijving Actie type Lastgroep Belastingtype Richting
BG4 EG Permanent LG1 Eigen gewicht -Z
BG1 Permanent LG1 Standaard
BG2 Permanent LG1 Standaard
BG3 Permanent LG1 Standaard
BG1 25 Permanent LG1 Standaard
BG1 50 Permanent LG1 Standaard
BG1 100 Permanent LG1 Standaard
BG1 150 Permanent LG1 Standaard
BG1 200 Permanent LG1 Standaard
BG1 300 Permanent LG1 Standaard
BG1 400 Permanent LG1 Standaard
BG1 500 Permanent LG1 Standaard
BG1 600 Permanent LG1 Standaard

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 02.esa 14/21
Bijlage 04.1 / 14 - 21
Project Houthaven amsterdam Auteur
Onderdeel Remmingwerken sondering S02 Datum 18-11-2014
Omschrijving SCIA

12. Belastingsgevallen
12.1. Belastingsgevallen - BG1
Naam Omschrijving Actie type Lastgroep
Spec Belastingtype
BG1 Permanent LG1
Standaard

12.1.1. BG1 / Totale waarde

Z
Y
X

12.2. Belastingsgevallen - BG2


Naam Omschrijving Actie type Lastgroep
Spec Belastingtype
BG2 Permanent LG1
Standaard

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 02.esa 15/21
Bijlage 04.1 / 15 - 21
Project Houthaven amsterdam Auteur
Onderdeel Remmingwerken sondering S02 Datum 18-11-2014
Omschrijving SCIA

12.2.1. BG1 / Totale waarde

Z
Y
X

12.3. Belastingsgevallen - BG3


Naam Omschrijving Actie type Lastgroep
Spec Belastingtype
BG3 Permanent LG1
Standaard

12.3.1. BG1 / Totale waarde

Z
Y
X

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 02.esa 16/21
Bijlage 04.1 / 16 - 21
Project Houthaven amsterdam Auteur
Onderdeel Remmingwerken sondering S02 Datum 18-11-2014
Omschrijving SCIA

13. Niet-lineaire combinaties


13.1. Niet-lineaire combinaties - NL1
Naam Omschrijving Type Belastingsgevallen Coëff.
[-]
NL1 Hoekpaal Uiterste Grenstoestand BG1 1.00

13.1.1. Vervormingen van staaf; uy

Z
Y
X

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 02.esa 17/21
Bijlage 04.1 / 17 - 21
Project Houthaven amsterdam Auteur
Onderdeel Remmingwerken sondering S02 Datum 18-11-2014
Omschrijving SCIA

13.1.2. Interne krachten in staaf; Mz

Z
Y
X

13.1.3. Spanning; Von Mises

Z
Y
X

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 02.esa 18/21
Bijlage 04.1 / 18 - 21
Project Houthaven amsterdam Auteur
Onderdeel Remmingwerken sondering S02 Datum 18-11-2014
Omschrijving SCIA

14. Niet-lineaire combinaties


14.1. Niet-lineaire combinaties - NL2
Naam Omschrijving Type Belastingsgevallen Coëff.
[-]
NL2 Gording Uiterste Grenstoestand BG2 1.00

14.1.1. Vervormingen van staaf; bovengrens

Z
Y
X

14.1.2. Vervormingen van staaf; ondergrens

Z
Y
X

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 02.esa 19/21
Bijlage 04.1 / 19 - 21
Project Houthaven amsterdam Auteur
Onderdeel Remmingwerken sondering S02 Datum 18-11-2014
Omschrijving SCIA

14.1.3. Spanning; Von Mises

Z
Y
X

14.2. Niet-lineaire combinaties - NL3


Naam Omschrijving Type Belastingsgevallen Coëff.
[-]
NL3 Middenpaal Uiterste Grenstoestand BG3 1.00

14.2.1. Vervormingen van staaf; bovengrens

Z
Y
X

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 02.esa 20/21
Bijlage 04.1 / 20 - 21
Project Houthaven amsterdam Auteur
Onderdeel Remmingwerken sondering S02 Datum 18-11-2014
Omschrijving SCIA

14.2.2. Vervormingen van staaf; ondergrens

Z
Y
X

14.2.3. Spanning; Von Mises

Z
Y
X

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 02.esa 21/21
Bijlage 04.1 / 21 - 21
Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

Bijlage 4.2 SCIA engineer sondering


S07

30 ARCADIS 078153168:A - Definitief


Project Houthaven Auteur
Onderdeel Remmingwerken sondering S07 Datum 18-11-2014
Omschrijving SCIA

1. Rekenmodel

Z
Y
X

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 07.esa 1/14
Bijlage 04.2 / 1 - 14
Project Houthaven Auteur
Onderdeel Remmingwerken sondering S07 Datum 18-11-2014
Omschrijving SCIA

2. Inhoudsopgave
1. Rekenmodel 1
2. Inhoudsopgave 2
3. Project 2
4. Materialen 2
5. Doorsneden 3
6. Niet-lineaire functies 4
7. Belastingsgevallen 13
7.1. Belastingsgevallen - BG1 13
7.1.1. Totale waarde 13
8. Niet-lineaire combinaties 14
8.1. Niet-lineaire combinaties - NL1 14
8.1.1. Vervormingen van staaf; uy 14

3. Project
Licentienaam Onbekend
Project Houthaven
Onderdeel Remmingwerken sondering S07
Omschrijving SCIA
Datum 18-11-2014
Constructie Algemeen XYZ
Aantal knopen : 114
Aantal staven : 112
Aantal platen : 0
Aantal vaste lichamen : 0
Aantal gebruikte doorsneden : 5
Aantal belastingsgevallen : 15
Aantal gebruikte materialen : 2
2
Gravitatieversnelling [m/s ] 9.810
Nationale norm EC - EN

4. Materialen
Staal EC3
Naam Massa eenheid E-mod Poisson - nu Onderlimiet Bovenlimiet Fy (bereik) Fu (bereik)
3
[kg/m ] [MPa] [mm] [mm] [MPa] [MPa]
G-mod Thermisch uitz.
[MPa] [m/mK]
X65 7850.0 2.1000e+05 0.3 0 16 420.0 500.0
8.0769e+04 0.00 16 40 400.0 500.0
Staal
X52
Thermisch uitz. [m/mK] 0.00
3
Massa eenheid [kg/m ] 7850.0
E-mod [MPa] 2.1000e+05
Poisson - nu 0.3
Onafhankelijke G-modulus
G-mod [MPa] 8.0769e+04
Log. decrement (niet-uniforme demping enkel) 0.025
Therm. exp. (brand) [m/mK] 0.00
Specifieke hitte [J/gK] 6.0000e-01
Thermische geleiding [W/mK] 4.5000e+01
Fu [MPa] 460.0
Fy [MPa] 360.0
Verklaring van symbolen
Log. decrement Deze materiaal dempingseigenschap
(niet-uniforme demping is enkel toegpast in het geval van het
enkel) niet-uniform is
demping is geactiveerd voor
dynamische analyse (zie project
functionaliteit).
Gelieve op te merken, dat
niet-uniforme demping een specifieke

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 07.esa 2/14
Bijlage 04.2 / 2 - 14
Project Houthaven Auteur
Onderdeel Remmingwerken sondering S07 Datum 18-11-2014
Omschrijving SCIA

Verklaring van symbolen


licentie benodigd,
welke geen deel uit maakt van het
standaard dynamische pakket.

5. Doorsneden
CS2 Type Buis
Type Buis Uitgebreid 762; 25
Uitgebreid 914; 22 Vorm type Dikke wanden
Vorm type Dikke wanden Onderdeelmateriaal X52
Onderdeelmateriaal X65 Bouwwijze Algemeen
Bouwwijze Algemeen Knik y-y, Knik z-z d d
2
Knik y-y, Knik z-z d d A [m ] 5.7884e-02
2 2 2
A [m ] 6.1651e-02 Ay [m ], Az [m ] 3.6850e-02 3.6850e-02
2 2 4 4
Ay [m ], Az [m ] 3.9248e-02 3.9248e-02 Iy [m ], Iz [m ] 3.9346e-03 3.9346e-03
4 4 3 3
Iy [m ], Iz [m ] 6.1354e-03 6.1354e-03 Welz [m ], Wely [m ] 1.0327e-02 1.0327e-02
3 3 3 3
Welz [m ], Wely [m ] 1.3425e-02 1.3425e-02 Wplz [m ], Wply [m ] 1.3584e-02 1.3584e-02
3 3 6 4
Wplz [m ], Wply [m ] 1.7508e-02 1.7508e-02 Iw [m ], It [m ] 0.0000e+00 7.8602e-03
6 4
Iw [m ], It [m ] 0.0000e+00 1.2263e-02 dy [mm], dz [mm] 0 0
dy [mm], dz [mm] 0 0 cYUCS [mm], cZUCS 381 381
cYUCS [mm], cZUCS 457 457 [mm]
[mm] [deg] 0.00
[deg] 0.00 Mply+ [Nm], Mply- [Nm] 4.89e+06 4.89e+06
Mply+ [Nm], Mply- [Nm] 7.88e+06 7.88e+06 Mplz+ [Nm], Mplz- [Nm] 4.89e+06 4.89e+06
2 2
Mplz+ [Nm], Mplz- [Nm] 7.88e+06 7.88e+06 AL [m /m], AD [m /m] 2.3938e+00 4.6305e+00
2 2
AL [m /m], AD [m /m] 2.8713e+00 5.6043e+00 y [mm], z [mm] 0 0
y [mm], z [mm] 0 0 Afbeelding z
Afbeelding z

D 762

y
t 25
D 914

y
t 22

CS1
CS3 Type Buis
Type Buis Uitgebreid 914; 22
Uitgebreid 914; 22 Vorm type Dikke wanden
Vorm type Dikke wanden Onderdeelmateriaal X65
Onderdeelmateriaal X65 Bouwwijze Algemeen
Bouwwijze Algemeen Knik y-y, Knik z-z d d
2
Knik y-y, Knik z-z d d A [m ] 6.1651e-02
2 2 2
A [m ] 6.1651e-02 Ay [m ], Az [m ] 3.9248e-02 3.9248e-02
2 2 4 4
Ay [m ], Az [m ] 3.9248e-02 3.9248e-02 Iy [m ], Iz [m ] 6.1354e-03 6.1354e-03
4 4 3 3
Iy [m ], Iz [m ] 6.1354e-03 6.1354e-03 Welz [m ], Wely [m ] 1.3425e-02 1.3425e-02
3 3 3 3
Welz [m ], Wely [m ] 1.3425e-02 1.3425e-02 Wplz [m ], Wply [m ] 1.7508e-02 1.7508e-02
3 3 6 4
Wplz [m ], Wply [m ] 1.7508e-02 1.7508e-02 Iw [m ], It [m ] 0.0000e+00 1.2263e-02
6 4
Iw [m ], It [m ] 0.0000e+00 1.2263e-02 dy [mm], dz [mm] 0 0
dy [mm], dz [mm] 0 0 cYUCS [mm], cZUCS 457 457
cYUCS [mm], cZUCS 457 457 [mm]
[mm] [deg] 0.00
[deg] 0.00 Mply+ [Nm], Mply- [Nm] 7.88e+06 7.88e+06
Mply+ [Nm], Mply- [Nm] 7.88e+06 7.88e+06 Mplz+ [Nm], Mplz- [Nm] 7.88e+06 7.88e+06
2 2
Mplz+ [Nm], Mplz- [Nm] 7.88e+06 7.88e+06 AL [m /m], AD [m /m] 2.8713e+00 5.6043e+00
2 2
AL [m /m], AD [m /m] 2.8713e+00 5.6043e+00 y [mm], z [mm] 0 0
y [mm], z [mm] 0 0 Afbeelding z
Afbeelding z
D 914

y
t 22
D 914

y
t 22

CS5
CS4 Type Buis

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 07.esa 3/14
Bijlage 04.2 / 3 - 14
Project Houthaven Auteur
Onderdeel Remmingwerken sondering S07 Datum 18-11-2014
Omschrijving SCIA

Uitgebreid 914; 22
Vorm type Dikke wanden
Onderdeelmateriaal X65
Bouwwijze Algemeen
Knik y-y, Knik z-z d d
2
A [m ] 6.1651e-02
2 2
Ay [m ], Az [m ] 3.9248e-02 3.9248e-02
4 4
Iy [m ], Iz [m ] 6.1354e-03 6.1354e-03
3 3
Welz [m ], Wely [m ] 1.3425e-02 1.3425e-02
3 3
Wplz [m ], Wply [m ] 1.7508e-02 1.7508e-02
6 4
Iw [m ], It [m ] 0.0000e+00 1.2263e-02
dy [mm], dz [mm] 0 0
cYUCS [mm], cZUCS 457 457
[mm]
[deg] 0.00
Mply+ [Nm], Mply- [Nm] 7.88e+06 7.88e+06
Mplz+ [Nm], Mplz- [Nm] 7.88e+06 7.88e+06
2 2
AL [m /m], AD [m /m] 2.8713e+00 5.6043e+00
y [mm], z [mm] 0 0
Afbeelding z
D 914

y
t 22

Verklaring van symbolen Verklaring van symbolen


A Gebied cYUCS Zwaartepunt coordinaten in Y-richting
Ay Afschuifoppervlak in hoofd y-richting van het invoer assen systeem
Az Afschuifoppervlak in hoofd z-richting cZUCS Zwaartepunt coordinaten in Z-richting
Iy Tweede moment van het gebied rond van het invoer assen systeem
de hoofd y-as Rotatiehoek van het hoofd assen
Iz Tweede moment van het gebied rond systeem
de hoofd z-as IYZLCS Product moment van het gebied in
Welz Elastische doorsnede modulus rond de het LCS systeem
hoofd z-as Mply+ Plastisch moment rond de hoofd y-as
Wely Elastische doorsnede modulus rond de voor een positief My moment
hoofd y-as Mply- Plastisch moment rond de hoofd y-as
Wplz Plastische doorsnede modulus rond de voor een negatief My moment
hoofd z-as Mplz+ Plastisch moment rond de hoofd z-as
Wply Plastische doorsnede modulus rond de voor een positief Mz moment
hoofd y-as Mplz- Plastisch moment rond de hoofd z-as
Iw Welvings constante - Niet berekend of voor een negatief Mz moment
vereenvoudigd AL Omtrek per eenheidslengte
It Torsie constante - Niet berekend of AD Uithardingsoppervlakte per
vereenvoudigd eenheidslengte
dy Afschuif middencoordinaat in hoofd y Mono-symmetrische constante rond
y-richting gemeten vanaf het de hoofd y-as
zwaartepunt - Niet berekend of z Mono-symmetrische constante rond
vereenvoudigd de hoofd z-as
dz Afschuif middencoordinaat in hoofd
z-richting gemeten vanaf het
zwaartepunt - Niet berekend of
vereenvoudigd

6. Niet-lineaire functies
Naam Type u/F Positief einde Negatief einde Tekenen

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 07.esa 4/14
Bijlage 04.2 / 4 - 14
Project Houthaven Auteur
Onderdeel Remmingwerken sondering S07 Datum 18-11-2014
Omschrijving SCIA

Naam Type u/F Positief einde Negatief einde Tekenen


-8 H Translatie -1.7700e-03[m] / -8.1000e-03[MN] Vrij Vrij

1.7700e-03[m] / 8.1000e-03[MN]
-9 H Translatie -6.1500e-03[m] / -2.8100e-02[MN] Vrij Vrij

6.1500e-03[m] / 2.8100e-02[MN]
-10 H Translatie -1.1380e-02[m] / -5.2000e-02[MN] Vrij Vrij

1.1380e-02[m] / 5.2000e-02[MN]
-11 H Translatie -1.7160e-02[m] / -7.8400e-02[MN] Vrij Vrij

1.7160e-02[m] / 7.8400e-02[MN]
-12 H Translatie -2.3350e-02[m] / -1.0670e-01[MN] Vrij Vrij

2.3350e-02[m] / 1.0670e-01[MN]

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 07.esa 5/14
Bijlage 04.2 / 5 - 14
Project Houthaven Auteur
Onderdeel Remmingwerken sondering S07 Datum 18-11-2014
Omschrijving SCIA

Naam Type u/F Positief einde Negatief einde Tekenen


-13 H Translatie -2.9800e-02[m] / -1.3620e-01[MN] Vrij Vrij

2.9800e-02[m] / 1.3620e-01[MN]
-14 H Translatie -3.6460e-02[m] / -1.6660e-01[MN] Vrij Vrij

3.6460e-02[m] / 1.6660e-01[MN]
-15 H Translatie -4.3280e-02[m] / -1.9780e-01[MN] Vrij Vrij

4.3280e-02[m] / 1.9780e-01[MN]
-16 H Translatie -6.6720e-02[m] / -3.0490e-01[MN] Vrij Vrij

6.6720e-02[m] / 3.0490e-01[MN]
-17 H Translatie -4.7660e-02[m] / -4.3560e-01[MN] Vrij Vrij

4.7660e-02[m] / 4.3560e-01[MN]

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 07.esa 6/14
Bijlage 04.2 / 6 - 14
Project Houthaven Auteur
Onderdeel Remmingwerken sondering S07 Datum 18-11-2014
Omschrijving SCIA

Naam Type u/F Positief einde Negatief einde Tekenen


-18 H Translatie -5.4440e-02[m] / -4.9760e-01[MN] Vrij Vrij

5.4440e-02[m] / 4.9760e-01[MN]
-19 H Translatie -6.1330e-02[m] / -5.6060e-01[MN] Vrij Vrij

6.1330e-02[m] / 5.6060e-01[MN]
-20 H Translatie -1.7930e-02[m] / -7.3740e-01[MN] Vrij Vrij

1.7930e-02[m] / 7.3740e-01[MN]
-21 H Translatie -3.6150e-02[m] / -1.4868e+00[MN] Vrij Vrij

3.6150e-02[m] / 1.4868e+00[MN]
-22 H Translatie -2.5100e-02[m] / -2.2939e+00[MN] Vrij Vrij

2.5100e-02[m] / 2.2939e+00[MN]

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 07.esa 7/14
Bijlage 04.2 / 7 - 14
Project Houthaven Auteur
Onderdeel Remmingwerken sondering S07 Datum 18-11-2014
Omschrijving SCIA

Naam Type u/F Positief einde Negatief einde Tekenen


-23 H Translatie -2.7950e-02[m] / -2.5542e+00[MN] Vrij Vrij

2.7950e-02[m] / 2.5542e+00[MN]
-24 H Translatie -3.0850e-02[m] / -2.8196e+00[MN] Vrij Vrij

3.0850e-02[m] / 2.8196e+00[MN]
-25 H Translatie -3.3800e-02[m] / -3.0896e+00[MN] Vrij Vrij

3.3800e-02[m] / 3.0896e+00[MN]
-8 L Translatie -2.5500e-03[m] / -7.0000e-03[MN] Vrij Vrij

2.5500e-03[m] / 7.0000e-03[MN]
-9 L Translatie -8.7900e-03[m] / -2.4100e-02[MN] Vrij Vrij

8.7900e-03[m] / 2.4100e-02[MN]

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 07.esa 8/14
Bijlage 04.2 / 8 - 14
Project Houthaven Auteur
Onderdeel Remmingwerken sondering S07 Datum 18-11-2014
Omschrijving SCIA

Naam Type u/F Positief einde Negatief einde Tekenen


-10 L Translatie -1.6190e-02[m] / -4.4400e-02[MN] Vrij Vrij

1.6190e-02[m] / 4.4400e-02[MN]
-11 L Translatie -2.4360e-02[m] / -6.6800e-02[MN] Vrij Vrij

2.4360e-02[m] / 6.6800e-02[MN]
-12 L Translatie -3.3040e-02[m] / -9.0600e-02[MN] Vrij Vrij

3.3040e-02[m] / 9.0600e-02[MN]
-13 L Translatie -4.2120e-02[m] / -1.1550e-01[MN] Vrij Vrij

4.2120e-02[m] / 1.1550e-01[MN]
-14 L Translatie -5.1420e-02[m] / -1.4100e-01[MN] Vrij Vrij

5.1420e-02[m] / 1.4100e-01[MN]

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 07.esa 9/14
Bijlage 04.2 / 9 - 14
Project Houthaven Auteur
Onderdeel Remmingwerken sondering S07 Datum 18-11-2014
Omschrijving SCIA

Naam Type u/F Positief einde Negatief einde Tekenen


-15 L Translatie -6.0940e-02[m] / -1.6710e-01[MN] Vrij Vrij

6.0940e-02[m] / 1.6710e-01[MN]
-16 L Translatie -9.2090e-02[m] / -2.5250e-01[MN] Vrij Vrij

9.2090e-02[m] / 2.5250e-01[MN]
-17 L Translatie -6.4930e-02[m] / -3.5610e-01[MN] Vrij Vrij

6.4930e-02[m] / 3.5610e-01[MN]
-18 L Translatie -7.4030e-02[m] / -4.0600e-01[MN] Vrij Vrij

7.4030e-02[m] / 4.0600e-01[MN]
-19 L Translatie -8.3260e-02[m] / -4.5660e-01[MN] Vrij Vrij

8.3260e-02[m] / 4.5660e-01[MN]

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 07.esa 10/14
Bijlage 04.2 / 10 - 14
Project Houthaven Auteur
Onderdeel Remmingwerken sondering S07 Datum 18-11-2014
Omschrijving SCIA

Naam Type u/F Positief einde Negatief einde Tekenen


-20 L Translatie -2.4890e-02[m] / -5.9160e-01[MN] Vrij Vrij

2.4890e-02[m] / 5.9160e-01[MN]
-21 L Translatie -4.7520e-02[m] / -1.1292e+00[MN] Vrij Vrij

4.7520e-02[m] / 1.1292e+00[MN]
-22 L Translatie -3.1550e-02[m] / -1.7014e+00[MN] Vrij Vrij

3.1550e-02[m] / 1.7014e+00[MN]
-23 L Translatie -3.5000e-02[m] / -1.8875e+00[MN] Vrij Vrij

3.5000e-02[m] / 1.8875e+00[MN]
-24 L Translatie -3.8510e-02[m] / -2.0765e+00[MN] Vrij Vrij

3.8510e-02[m] / 2.0765e+00[MN]

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 07.esa 11/14
Bijlage 04.2 / 11 - 14
Project Houthaven Auteur
Onderdeel Remmingwerken sondering S07 Datum 18-11-2014
Omschrijving SCIA

Naam Type u/F Positief einde Negatief einde Tekenen


-25 L Translatie -4.2060e-02[m] / -2.2681e+00[MN] Vrij Vrij

4.2060e-02[m] / 2.2681e+00[MN]
-24.5 L Translatie -6.9630e-02[m] / -1.7687e+00[MN] Vrij Vrij

6.9630e-02[m] / 1.7687e+00[MN]
-25.5 L Translatie -7.5820e-02[m] / -1.9259e+00[MN] Vrij Vrij

7.5820e-02[m] / 1.9259e+00[MN]

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 07.esa 12/14
Bijlage 04.2 / 12 - 14
Project Houthaven Auteur
Onderdeel Remmingwerken sondering S07 Datum 18-11-2014
Omschrijving SCIA

7. Belastingsgevallen
7.1. Belastingsgevallen - BG1
Naam Actie type Lastgroep Belastingtype
BG1 Permanent LG1 Standaard

7.1.1. Totale waarde

Z
Y
X

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 07.esa 13/14
Bijlage 04.2 / 13 - 14
Project Houthaven Auteur
Onderdeel Remmingwerken sondering S07 Datum 18-11-2014
Omschrijving SCIA

8. Niet-lineaire combinaties
8.1. Niet-lineaire combinaties - NL1
Naam Omschrijving Type Belastingsgevallen Coëff.
[-]
NL1 Hoekpaal Uiterste Grenstoestand BG1 1.00

8.1.1. Vervormingen van staaf; uy

Z
Y
X

Versie Scia Engineer 14.0.1043


Project bestandspad C:\FJK\Amsterdam stenen hoofd\Scia\
Projectbestandsnaam Remmingwerk sond 07.esa 14/14
Bijlage 04.2 / 14 - 14
Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

Bijlage 4.3 Energie beschouwing


randpaal en plooi controle
buis

078153168:A - Definitief ARCADIS 31


Sondering S02
Energie beschouwing remmingwerk

Verticale buis
Ø: 914 mm
t: 22 mm
SK: X65
Horizontale buis
Ø: 762 mm
t: 25 mm
SK: X52

Stootlast bij hoek paal (maatgevend)


Bovengrens Ondergrens
F E F E
[kN] [mm] [kNm] [kN] [mm] [kNm]
0 0.0 0 0 0.0 0
25 11.9 0.15 25 13.6 0.17
50 25.2 0.50 50 28.4 0.56
100 54.1 2.17 100 60.2 2.39
150 84.5 3.80 150 93.2 4.13
200 117.3 5.74 200 128.7 6.21
300 183.9 16.65 300 200.5 17.95
400 254.8 24.82 400 279.5 27.65
500 333.2 35.28 500 364.3 38.16
600 414.4 44.66 600 453.4 49.01
133.77 146.23

Benodigde energie rep: 212 212


: 1 rek: 212 212
Nog nodig: 78.23 65.77

133.77 146.23
Laaste F 735 530.9 77.76 705 558.2 68.38
211.53 214.61
ctrl: voldoet voldoet

800
Energie
Bovengrens Ondergrens
700

600

500
F [kN]

400

300

200

100

0
0.0 100.0 200.0 300.0 400.0 500.0 600.0
[mm]

Paal
Staal: fy: 450 N/mm²
Von Mises staal spanning van paal is: 445 N/mm² UC: 0.99 voldoet
Onderkant paal: -20 m + NAP
Horizontale buis
Staal: fy: 360 N/mm²
Von Mises staal spanning van balk is: 220 N/mm² UC: 0.61 voldoet

Bijlage 04.3 / 1 - 8
Sondering S07
Energie beschouwing remmingwerk

Verticale buis
Ø: 914 mm
t: 22 mm
SK: X65
Horizontale buis
Ø: 762 mm
t: 25 mm
SK: X52

Stootlast bij hoek paal (maatgevend)


Bovengrens Ondergrens
F E F E
[kN] [mm] [kNm] [kN] [mm] [kNm]
0 0.0 0 0 0.0 0
25 12.4 0.16 25 14.4 0.18
50 26.2 0.52 50 30.5 0.60
100 58.0 2.39 100 67.0 2.74
150 94.5 4.56 150 108.7 5.21
200 134.5 7.00 200 154.4 8.00
300 227.0 23.13 300 259.8 26.35
400 333.3 37.21 400 381.1 42.46
500 451.5 53.19 500 516.5 60.93
500 451.5 0.00 500 516.5 0.00
128.16 146.47

Benodigde energie rep: 212 212


: 1 rek: 212 212
Nog nodig: 83.84 65.53

128.16 146.47
Laaste F 615 602.4 84.13 590 648.8 72.10
212.29 218.57
ctrl: voldoet voldoet

700
Energie
Bovengrens Ondergrens
600

500

400
F [kN]

300

200

100

0
0.0 100.0 200.0 300.0 400.0 500.0 600.0 700.0
[mm]

Paal
Staal: fy: 450 N/mm²
Von Mises staal spanning van paal is: 348.3 N/mm² UC: 0.77 voldoet
Onderkantpaal: -24 m + NAP
Horizontale buis
Staal: fy: 360 N/mm²
Von Mises staal spanning van balk is: 194.5 N/mm² UC: 0.54 voldoet

Bijlage 04.3 / 2 - 8
PROJECT: Hotuhaven
SECTION: Controle paal remmingwerk 02
DATE: 18-11-2014

Local buckling according to Quay Wall Handbook


Limitations:
Piles
- Method to be used for steel quality up to X70 (fy = 483 MPa)
- The formulas are valid for water head differences less than 4 m.
D
- Critical strain formula for pile fill with sand is only valid for 70 120
t
- Alternatively EN 1993-1-6 may be used for piles filled with sand. In that case the resistance may be
increased with a factor 1.13. This is only allowed for D/t < 100 and for D/t ² < 170.
Fill
- Sand shall be present in the area of the section subject to evaluation of the resistance. Sand may be
loose or medium dense, if naturally available.
- In actively filled piles the sand fill shall be compacted, obtaining 70% relative density or qc >10 MPa.
- Clay filled piles shall be considered as empty piles. Sand filled piles with thin (< 0.5 D) intermediate clay
layers may be considered as sand filled piles.
- The results of this work should not be used for dolphin piles of for other applications where plastic
deformation capacity is required. The effect of use of the recommendations for these type of structures
may result in choosing larger D/t ² values, which is not recommendable.

Geometry:
zt : m -> Top level of pile t Dout
zb : m -> Tip level of pile

ctc : m -> c.t.c of piles


(0 means only pile)
Pile:
Do : mm -> Outside section of pile
c.t.c.
t: mm -> Wall thickness

Do t
Di Do 2t 870 mm -> Internal section of pile r 446 mm -> Radius of
2
middle surface
3 2 3 2 6 3
Apile 2 rt 61.7 10 mm -> Area Wpile r t 13.4 10 mm -> Section modulus
Do
3 9 4
Ipile r t 6.132 10 mm -> Moment of inertia
Sheet Pile:
tfl : mm -> flange thickness
tflange

tweb : mm -> web thickness tweb


hsp : mm -> height sheet pile
hps;total

Local buckling according to CUR Quay Walls 18-11-2014 1 of 6

Bijlage 04.3 / 3 - 8
PROJECT: Hotuhaven
SECTION: Controle paal remmingwerk 02
DATE: 18-11-2014

Material properties:
E: N/mm² -> Modulus of Elasticity

Pile : N/mm² -> Steel quality pile


N
fyp 450 -> Yield strength pile
mm²

SP : N/mm² -> Steel quality sheet pile


N
fysp 240 -> Yield strength sheet pile
mm²

M0 : -> Safety factor

Classification of pile according to NEN-EN-1993-1-1, 5.5.2 / Table 5.2:


D [mm] t [mm] fy [N/mm²] [-] d/t ² [-] class 1: d/t ² <=50 / class 2: 50<d/t ² <=70
914 22 450 0.723 80 class 3: 70<d/t ² <=90 / class 4: 90<d/t ²
Class 3: cross-sections are those in which the stress in the extreme compression fibre of the steel member assuming
an elastic distribution of stresses can reach the yield strength, but local buckling is liable to prevent development of the
plastic moment resistance.

Local buckling of pile according to NEN-EN-1993-1-6, D.1.2.2 (5):


Cylinders need not be checked against meridional shell buckling if they satisfy:
r E r E
0.03 20.273 0.03 14 x_ctrl "Check buckling"
t fyp t fyp

Load cases:
From sheet pile:
1 2 kNm
M sd.sheet tweb fysp 0 -> Maximum moment from sheet pile
4 m
2 M sd.sheet kN
wy.Ed if t fl = 0 0 0 -> Maximal support reaction
h sp tfl m
From soil and pile:
Soil loads are passive and/or active soil pressures, inside pile neutral soil pressure.
Amount of cases [min 1 / max 5, Left side is water/excavation side]:

Cases : -> i 1 cases

1 Soil
Pile loads
Level Left Right Intern
Case
`h water `h water `h N ed Med
[m +NAP] [kN/m²] [kN/m²] [kN/m²] [kN/m²] [kN/m²] [kN] [kNm]
1 -13.5 0.0 0.0 0.0 0.0 0.0 0 5977
0.0 0.0 0.0 0.0 0.0 0 0

Type of pile:
Pile : -> Choose type of pile (empty or fill)

Local buckling according to CUR Quay Walls 18-11-2014 2 of 6

Bijlage 04.3 / 4 - 8
PROJECT: Hotuhaven
SECTION: Controle paal remmingwerk 02
DATE: 18-11-2014

Soil pressure:
External soil pressure should be calculated with a factor c.t.c/Do (pressure acting on the pile is equal to de c.t.c
between piles per m width of pile)
ctc ctc
qL if ctc = 0 1 'hL wL qR if ctc = 0 1 'hR wRi q Int 'hI
i Do i i i Do i i i
The pressures outside the tube had been averaged for the determination of the mean pressure on the
tube
qL qR
i i kN kN
q max q Int if q L 0 0
i 2 i i m² m²
qR q Int otherwise
i i

qL qR qInt q
Case
[kN/m²] [kN/m²] [kN/m²] [kN/m²]
1 0.0 0.0 0.0 0.0

qL q R q Int
Out of roundness:q
cases
NokN
re-rounding
kN effect
kN caused
kN by soil support to the sides of the tube has been taken in account
2 2 2 2
a- m m fabrication
Due to m m [NEN-EN 1993-1-6, tabel 8.1]:

Cl : Ur.max Cl Do 0.022 -> class [A:Excellent/B:High/C:Normal]

1
ea Ur.max Cl Do Do 4.96 mm
4

b- Due to tensile forces from secondary members [NEN-EN 1993-5, D.2.1]:


3 3
Et 1 2 1 r
EI eb min 0.1 r wy.Ed 0.00 mm
12 2 2 EI

c- Due to soil pressure:


4
q r
1 i kN T
ec if q L = 0 ec ( 0.00 ) mm
i 24 EI m²
4
q r
1 i
otherwise
12 EI

d- Ovalization as a second order effect:

M ed 2 5
r
i i T
ed ed ( 0.79 ) mm
i E Ipile i 2
t

Local buckling according to CUR Quay Walls 18-11-2014 3 of 6

Bijlage 04.3 / 5 - 8
PROJECT: Hotuhaven
SECTION: Controle paal remmingwerk 02
DATE: 18-11-2014

Radius of top and bottom side of the tube due to ovalisation [r`]:
12 EI MN
k steel 56.513
4 m³
r
10kPa MN
k sand 0.022 ( Esand 10 kPa, see article 6.6.6.4, bending moment evaluation for sand-filled tube)
r m³
k steel
k 1
k steel k sand
r
etot ea eb ec ed et etot k if Pile = 2 r'
i i i i i i et
i
etot otherwise 1 3
i r
T
et ( 5.7 ) mm
T
r' ( 463.9 ) mm
Bending moment evaluation:
Do fyp
Critical strain: 41.545 y
t E
3
cri if Pile = 1 cr 9.355 10

t Do
0.25 0.0025 if 120
r' t
i
t
0.1 otherwise
r'
i
if Pile = 2
2 Do
t
7 if 70 120
r' t
i
"Out of range, to be calculated as empty pile" otherwise

cri
T
Parameter : ( 4.37 )
i
y

T
Plasticity rate: if 1 ( 13.2 ) °
i 2 i

1
asin otherwise
i

Local buckling according to CUR Quay Walls 18-11-2014 4 of 6

Bijlage 04.3 / 6 - 8
PROJECT: Hotuhaven
SECTION: Controle paal remmingwerk 02
DATE: 18-11-2014

Bending moment as function of the plasticity rate:


2
Wpile fyp ( 2 r) t fyp
M el.d 5489 kNm M pl.d 7161 kNm
M0 M0
1 i
MR cos M pl.d if 1 MR 7098 kNm
i 2 sin i i
i
M el.d otherwise
i

Reduced bending moment and normal force:


meff;Sd due to tensile forces from secondary members is:
1 1 1
wy.Ed r wy.Ed r
2 kNm
meff.Sd.1 meff.Sd.1 0.0
2 m
meff;Sd due to soil:
1 2 3 2 2
q r q r
8 i 8 3 i kN kNm
meff.Sd.2 if q L = 0 meff.Sd.2 0.0
i 2 m² m
1 2 1 2
q r q r
4 i 4 i
otherwise
2

2 fyp
t kNm
mpl.Rd mpl.Rd 49.5
4 M0 m

meff.Sd.1 meff.Sd.2
i T
c1 4 2 3 c1 ( 2.00 )
i mpl.Rd
c1
i 2 T
g0 g0 ( 1.00 )
i 6 3
2 et
i T
gi 1 g ( 0.99 )
3r
T
si s1 Pile i s ( 1.00 )

M Rd g0 M M Rd 7037 kNm
i i g i si Ri
fyp
Npl Apile and NRd g 0 Npl NRd 25221 kN
M0 i i

Local buckling according to CUR Quay Walls 18-11-2014 5 of 6

Bijlage 04.3 / 7 - 8
PROJECT: Hotuhaven
SECTION: Controle paal remmingwerk 02
DATE: 18-11-2014

Combined bending and normal force evaluation:

1.7
M ed Ned
i i
Ned M ed UC: 0.849
i i M Rd NRd
i i
0 kN 5977 kNm

Ctrl: x_ctrl "OK"

Local buckling according to CUR Quay Walls 18-11-2014 6 of 6

Bijlage 04.3 / 8 - 8
Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

Bijlage 5 Palen achter ponton

32 ARCADIS 078153168:A - Definitief


Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

Bijlage 5.1 SCIA Engineer berekening

078153168:A - Definitief ARCADIS 33


1. Rekenmodel

Z
Y
X

2. Inhoudsopgave
1. Rekenmodel 1
2. Inhoudsopgave 1
3. Project 1
4. Materialen 1
5. Doorsneden 2
6. Niet-lineaire functies 3
7. Belastingsgevallen 9
8. Belastingsgevallen 11
8.1. Belastingsgevallen - BG2 11
8.1.1. BG2 / Totale waarde 11
9. Niet-lineaire combinaties 12
10. Vervormingen van staaf; uy 12
11. Interne krachten in staaf; Vy 12
12. Interne krachten in staaf; Mz 13
13. Spanning; Von Mises 13

3. Project
Licentienaam Onbekend
Project Houthaven
Onderdeel Palen bij ponton
Omschrijving SCIA
Datum 18-11-2014
Constructie Algemeen XYZ
Aantal knopen : 144
Aantal staven : 142
Aantal platen : 0
Aantal vaste lichamen : 0
Aantal gebruikte doorsneden : 4
Aantal belastingsgevallen : 9
Aantal gebruikte materialen : 3
2
Gravitatieversnelling [m/s ] 9.810
Nationale norm NEN

4. Materialen
Staal
S235
Thermisch uitz. [m/mK] 0.00
3
Massa eenheid [kg/m ] 7850.0

Bijlage 05.1 / 1 - 13
E-mod [MPa] 2.1000e+05
Poisson - nu 0.3
Onafhankelijke G-modulus
G-mod [MPa] 8.0769e+04
Log. decrement (niet-uniforme demping enkel) 0.025
Therm. exp. (brand) [m/mK] 0.00
Specifieke hitte [J/gK] 6.0000e-01
Thermische geleiding [W/mK] 4.5000e+01
Fu [MPa] 360.0
Fy [MPa] 235.0
Staal
X70
Thermisch uitz. [m/mK] 0.00
3
Massa eenheid [kg/m ] 7850.0
E-mod [MPa] 2.1000e+05
Poisson - nu 0.3
Onafhankelijke G-modulus
G-mod [MPa] 8.0769e+04
Log. decrement (niet-uniforme demping enkel) 0.025
Therm. exp. (brand) [m/mK] 0.00
Specifieke hitte [J/gK] 6.0000e-01
Thermische geleiding [W/mK] 4.5000e+01
Fu [MPa] 570.0
Fy [MPa] 485.0
Staal
stijf
Thermisch uitz. [m/mK] 0.00
3
Massa eenheid [kg/m ] 0.0
E-mod [MPa] 2.1000e+10
Poisson - nu 0.3
Onafhankelijke G-modulus
G-mod [MPa] 8.0769e+09
Log. decrement (niet-uniforme demping enkel) 0.025
Therm. exp. (brand) [m/mK] 0.00
Specifieke hitte [J/gK] 6.0000e-01
Thermische geleiding [W/mK] 4.5000e+01
Fu [MPa] 360.0
Fy [MPa] 235.0
Verklaring van symbolen
Log. decrement Deze materiaal dempingseigenschap
(niet-uniforme demping is enkel toegpast in het geval van het
enkel) niet-uniform is
demping is geactiveerd voor
dynamische analyse (zie project
functionaliteit).
Gelieve op te merken, dat
niet-uniforme demping een specifieke
licentie benodigd,
welke geen deel uit maakt van het
standaard dynamische pakket.

5. Doorsneden
CS1 Afbeelding z
Type Buis
Uitgebreid 1220; 34
Vorm type Dikke wanden
D 1220

Onderdeelmateriaal X70 t 34
y
Bouwwijze Algemeen
Knik y-y, Knik z-z d d
2
A [m ] 1.2668e-01
2 2
Ay [m ], Az [m ] 8.0648e-02 8.0648e-02
4 4
Iy [m ], Iz [m ] 2.2292e-02 2.2292e-02 CS2
3
Welz [m ], Wely [m ]
3
3.6544e-02 3.6544e-02 Type Buis
3
Wplz [m ], Wply [m ]
3
4.7837e-02 4.7837e-02 Uitgebreid 1220; 34
6 4
Iw [m ], It [m ] 0.0000e+00 4.4547e-02 Vorm type Dikke wanden
dy [mm], dz [mm] 0 0 Onderdeelmateriaal X70
cYUCS [mm], cZUCS 610 610 Bouwwijze Algemeen
[mm] Knik y-y, Knik z-z d d
2
[deg] 0.00 A [m ] 1.2668e-01
2 2
Mply+ [Nm], Mply- [Nm] 2.32e+07 2.32e+07 Ay [m ], Az [m ] 8.0648e-02 8.0648e-02
4 4
Mplz+ [Nm], Mplz- [Nm] 2.32e+07 2.32e+07 Iy [m ], Iz [m ] 2.2292e-02 2.2292e-02
3 3
2 2
AL [m /m], AD [m /m] 3.8325e+00 7.4515e+00 Welz [m ], Wely [m ] 3.6544e-02 3.6544e-02
3 3
y [mm], z [mm] 0 0 Wplz [m ], Wply [m ] 4.7837e-02 4.7837e-02
6 4
Iw [m ], It [m ] 0.0000e+00 4.4547e-02
dy [mm], dz [mm] 0 0
cYUCS [mm], cZUCS 610 610
[mm]

Bijlage 05.1 / 2 - 13
[deg] 0.00 CS6
Mply+ [Nm], Mply- [Nm] 2.32e+07 2.32e+07 Type O
Mplz+ [Nm], Mplz- [Nm] 2.32e+07 2.32e+07 Uitgebreid 10000; 40; 500; 40
2 2
AL [m /m], AD [m /m] 3.8325e+00 7.4515e+00 Vorm type Dikke wanden
y [mm], z [mm] 0 0 Onderdeelmateriaal stijf
Afbeelding z Bouwwijze Algemeen
Knik y-y, Knik z-z d d
2
A [m ] 8.3360e-01
2 2
Ay [m ], Az [m ] 6.9037e-01 4.0395e-02

D 1220
4 4
t 34
y Iy [m ], Iz [m ] 4.2921e-02 7.5000e+00
3 3
Welz [m ], Wely [m ] 1.5000e+00 1.7168e-01
3 3
Wplz [m ], Wply [m ] 2.1673e+00 1.8753e-01
6 4
Iw [m ], It [m ] 3.0802e-01 1.5081e-01
dy [mm], dz [mm] 0 0
CS3 cYUCS [mm], cZUCS 5000 250
Type Buis [mm]
Uitgebreid 1220; 34 [deg] 0.00
Vorm type Dikke wanden Mply+ [Nm], Mply- [Nm] 4.41e+07 4.41e+07
Onderdeelmateriaal X70 Mplz+ [Nm], Mplz- [Nm] 5.09e+08 5.09e+08
Bouwwijze Algemeen 2 2
AL [m /m], AD [m /m] 2.1000e+01 4.1680e+01
Knik y-y, Knik z-z d d y [mm], z [mm] 0 0
2
A [m ] 1.2668e-01 Afbeelding z

thb 40
2 2
Ay [m ], Az [m ] 8.0648e-02 8.0648e-02

B 500
A 10000 tha 40 y
4 4
Iy [m ], Iz [m ] 2.2292e-02 2.2292e-02
3 3
Welz [m ], Wely [m ] 3.6544e-02 3.6544e-02
3 3
Wplz [m ], Wply [m ] 4.7837e-02 4.7837e-02
6 4
Iw [m ], It [m ] 0.0000e+00 4.4547e-02
dy [mm], dz [mm] 0 0
cYUCS [mm], cZUCS 610 610
[mm]
[deg] 0.00
Mply+ [Nm], Mply- [Nm] 2.32e+07 2.32e+07
Mplz+ [Nm], Mplz- [Nm] 2.32e+07 2.32e+07
2 2
AL [m /m], AD [m /m] 3.8325e+00 7.4515e+00
y [mm], z [mm] 0 0
Afbeelding z
D 1220

y
t 34

Verklaring van symbolen Verklaring van symbolen


A Gebied cYUCS Zwaartepunt coordinaten in Y-richting
Ay Afschuifoppervlak in hoofd y-richting van het invoer assen systeem
Az Afschuifoppervlak in hoofd z-richting cZUCS Zwaartepunt coordinaten in Z-richting
Iy Tweede moment van het gebied rond van het invoer assen systeem
de hoofd y-as Rotatiehoek van het hoofd assen
Iz Tweede moment van het gebied rond systeem
de hoofd z-as IYZLCS Product moment van het gebied in
Welz Elastische doorsnede modulus rond de het LCS systeem
hoofd z-as Mply+ Plastisch moment rond de hoofd y-as
Wely Elastische doorsnede modulus rond de voor een positief My moment
hoofd y-as Mply- Plastisch moment rond de hoofd y-as
Wplz Plastische doorsnede modulus rond de voor een negatief My moment
hoofd z-as Mplz+ Plastisch moment rond de hoofd z-as
Wply Plastische doorsnede modulus rond de voor een positief Mz moment
hoofd y-as Mplz- Plastisch moment rond de hoofd z-as
Iw Welvings constante - Niet berekend of voor een negatief Mz moment
vereenvoudigd AL Omtrek per eenheidslengte
It Torsie constante - Niet berekend of AD Uithardingsoppervlakte per
vereenvoudigd eenheidslengte
dy Afschuif middencoordinaat in hoofd y Mono-symmetrische constante rond
y-richting gemeten vanaf het de hoofd y-as
zwaartepunt - Niet berekend of z Mono-symmetrische constante rond
vereenvoudigd de hoofd z-as
dz Afschuif middencoordinaat in hoofd
z-richting gemeten vanaf het
zwaartepunt - Niet berekend of
vereenvoudigd

6. Niet-lineaire functies
Naam Type u/F Positief einde Negatief einde Tekenen

Bijlage 05.1 / 3 - 13
Naam Type u/F Positief einde Negatief einde Tekenen
-7.5 H Translatie -0.002150 / -10500.000000 Vrij Vrij

0.002150 / 10500.000000
-8.5 H Translatie -0.007270 / -35500.000000 Vrij Vrij

0.007270 / 35500.000000
-9.5 H Translatie -0.013340 / -65100.000000 Vrij Vrij

0.013340 / 65100.000000
-10.5 H Translatie -0.020080 / -98000.000000 Vrij Vrij

0.020080 / 98000.000000
-11.5 H Translatie -0.027340 / -133400.000000 Vrij Vrij

0.027340 / 133400.000000
-12.5 H Translatie -0.074530 / -363700.000000 Vrij Vrij

0.074530 / 363700.000000

Bijlage 05.1 / 4 - 13
Naam Type u/F Positief einde Negatief einde Tekenen
-13.5 H Translatie -0.011780 / -704300.000000 Vrij Vrij

0.011780 / 704300.000000
-14.5 H Translatie -0.017020 / -1017700.000000 Vrij Vrij

0.017020 / 1017700.000000
-15.5 H Translatie -0.010080 / -1020300.000000 Vrij Vrij

0.010080 / 1020300.000000
-16.5 H Translatie -0.046940 / -400900.000000 Vrij Vrij

0.046940 / 400900.000000
-17.5 H Translatie -0.050060 / -427500.000000 Vrij Vrij

0.050060 / 427500.000000
-18.5 H Translatie -0.015440 / -2015200.000000 Vrij Vrij

0.015440 / 2015200.000000

Bijlage 05.1 / 5 - 13
Naam Type u/F Positief einde Negatief einde Tekenen
-19.5 H Translatie -0.017730 / -2314000.000000 Vrij Vrij

0.017730 / 2314000.000000
-20.5 H Translatie -0.020090 / -2622300.000000 Vrij Vrij

0.020090 / 2622300.000000
-21.5 H Translatie -0.022520 / -2939300.000000 Vrij Vrij

0.022520 / 2939300.000000
-22.5 H Translatie -0.025010 / -3264200.000000 Vrij Vrij

0.025010 / 3264200.000000
-23.5 H Translatie -0.027550 / -3596200.000000 Vrij Vrij

0.027550 / 3596200.000000
-24.5 H Translatie -0.030140 / -3934900.000000 Vrij Vrij

0.030140 / 3934900.000000

Bijlage 05.1 / 6 - 13
Naam Type u/F Positief einde Negatief einde Tekenen
-7.5 L Translatie -0.003730 / -9100.000000 Vrij Vrij

0.003730 / 9100.000000
-8.5 L Translatie -0.012500 / -30500.000000 Vrij Vrij

0.012500 / 30500.000000
-9.5 L Translatie -0.022870 / -55800.000000 Vrij Vrij

0.022870 / 55800.000000
-10.5 L Translatie -0.034340 / -83800.000000 Vrij Vrij

0.034340 / 83800.000000
-11.5 L Translatie -0.046600 / -113700.000000 Vrij Vrij

0.046600 / 113700.000000
-12.5 L Translatie -0.120410 / -293800.000000 Vrij Vrij

0.120410 / 293800.000000

Bijlage 05.1 / 7 - 13
Naam Type u/F Positief einde Negatief einde Tekenen
-13.5 L Translatie -0.015770 / -558000.000000 Vrij Vrij

0.015770 / 558000.000000
-14.5 L Translatie -0.022490 / -795600.000000 Vrij Vrij

0.022490 / 795600.000000
-15.5 L Translatie -0.013430 / -802600.000000 Vrij Vrij

0.013430 / 802600.000000
-16.5 L Translatie -0.069570 / -339500.000000 Vrij Vrij

0.069570 / 339500.000000
-17.5 L Translatie -0.074180 / -362000.000000 Vrij Vrij

0.074180 / 362000.000000
-18.5 L Translatie -0.019990 / -1536400.000000 Vrij Vrij

0.019990 / 1536400.000000

Bijlage 05.1 / 8 - 13
Naam Type u/F Positief einde Negatief einde Tekenen
-19.5 L Translatie -0.022860 / -1756900.000000 Vrij Vrij

0.022860 / 1756900.000000
-20.5 L Translatie -0.025800 / -1983100.000000 Vrij Vrij

0.025800 / 1983100.000000
-21.5 L Translatie -0.028810 / -2214400.000000 Vrij Vrij

0.028810 / 2214400.000000
-22.5 L Translatie -0.031880 / -2450500.000000 Vrij Vrij

0.031880 / 2450500.000000
-23.5 L Translatie -0.035010 / -2690700.000000 Vrij Vrij

0.035010 / 2690700.000000
-24.5 L Translatie -0.038180 / -2934700.000000 Vrij Vrij

0.038180 / 2934700.000000

7. Belastingsgevallen
Naam Omschrijving Actie type Lastgroep Belastingtype
BG2 Permanent LG1 Standaard
BG3 100 kN Permanent LG1 Standaard

Bijlage 05.1 / 9 - 13
Naam Omschrijving Actie type Lastgroep Belastingtype
BG4 300 kN Permanent LG1 Standaard
BG5 600 kN Permanent LG1 Standaard
BG6 900 kN Permanent LG1 Standaard
BG7 1000 kN Permanent LG1 Standaard
BG8 1500 kN Permanent LG1 Standaard
BG9 2000 kN Permanent LG1 Standaard
BG10 2500 kN Permanent LG1 Standaard

Bijlage 05.1 / 10 - 13
8. Belastingsgevallen
8.1. Belastingsgevallen - BG2
Naam Omschrijving Actie type Lastgroep
Spec Belastingtype
BG2 Permanent LG1
Standaard

8.1.1. BG2 / Totale waarde

Z
Y
X

Bijlage 05.1 / 11 - 13
9. Niet-lineaire combinaties
Naam Omschrijving Type Belastingsgevallen Coëff.
[-]
NL1 Maximale F Uiterste Grenstoestand BG2 1.00

10. Vervormingen van staaf; uy

Z
Y
X

11. Interne krachten in staaf; Vy

Z
Y
X

Bijlage 05.1 / 12 - 13
12. Interne krachten in staaf; Mz

Z
Y
X

13. Spanning; Von Mises

Z
Y
X

Bijlage 05.1 / 13 - 13
Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

Bijlage 5.2 Energie beschouwing en


plooi controle buis

34 ARCADIS 078153168:A - Definitief


Energie beschouwing palen t.p.v. ponton bovengrens
Verticale buis
Ø: 1220 mm
t: 34 mm
SK: X70

Stootlast bij hoek paal (maatgevend)


1ste paal 2de paal
F E F E
[kN] [mm] [kNm] [kN] [mm] [kNm]
0 0.0 0 0 0.0 0
100 91.2 55.7 14.2 0.40 35.5 9.4 0.17
300 274.1 163.9 48.0 3.71 110.2 31.7 1.62
600 547.8 325.8 104.4 13.81 222.0 68.9 6.18
900 821.8 488.0 164.8 24.58 333.8 108.7 11.06
1000 913.0 541.9 185.2 10.50 371.1 122.2 4.76
1500 1371.5 803.8 298.2 76.03 567.7 196.6 34.92
2000 1826.4 1070.4 422.9 116.86 756.0 278.6 54.27
2500 2292.3 1295.5 590.7 198.50 996.8 387.5 95.44
1295.5 590.7 0.00 996.8 387.5 0.00
444.39 208.42

Benodigde energie rep: 778


: 1 rek: 778
- 652.81
Nog nodig: 125.19
Laaste F
2650 2430.9 1362.2 649.5 78.14 1068.7 425.6 39.35
522.53 247.77
652.81
Laaste F 117.49
Etotal 770.30
voldoet

1600
Energie
1ste paal 2de paal
1400

1200

1000
F [kN]

800

600

400

200

0
0.0 100.0 200.0 300.0 400.0 500.0 600.0 700.0
[mm]

Paal
Staal: fy: 485 N/mm²
Von Mises staal spanning van paal is: 480 N/mm² UC: 0.990 voldoet
Onderkant paal: -22.5 m + NAP

Bijlage 05.2 / 1 - 8
Energie beschouwing palen t.p.v. ponton representatief
Verticale buis
Ø: 1220 mm
t: 34 mm
SK: X70

Stootlast bij hoek paal (maatgevend)


1ste paal 2de paal
F E F E
[kN] [mm] [kNm] [kN] [mm] [kNm]
0 0.0 0 0 0.0 0
100 91.7 54.6 18.1 0.49 37.1 11.9 0.22
300 274.6 163.4 57.7 4.32 111.2 38.1 1.94
600 548.8 326.2 121.9 15.72 222.6 80.4 7.06
900 822.5 489.4 189.1 27.40 333.2 124.7 12.30
1000 914.1 543.2 212.5 12.08 370.9 140.1 5.42
1500 1373.3 803.4 342.7 87.66 569.9 225.6 40.22
2000 1838.9 1029.0 528.5 170.23 809.9 346.0 83.06
2500 1838.9 1029.0 528.5 0.00 809.9 346.0 0.00
1029.0 528.5 0.00 809.9 346.0 0.00
317.90 150.22

Benodigde energie rep: 778


: 1 rek: 778
- 468.12
Nog nodig: 309.88
Laaste F
2500 1226.7 718.6 214.41 965.5 470.1 110.16
532.31 260.38
468.12
Laaste F 324.57
Etotal 792.69
voldoet

1400
Energie
1ste paal 2de paal
1200

1000

800
F [kN]

600

400

200

0
0.0 100.0 200.0 300.0 400.0 500.0 600.0 700.0 800.0
[mm]

Paal
Staal: fy: 485 N/mm²
Von Mises staal spanning van paal is: 439.3 N/mm² UC: 0.906 voldoet
Onderkant paal: -22.5 m + NAP

Bijlage 05.2 / 2 - 8
PROJECT: Hotuhaven
SECTION: Controle palen achter ponton
DATE: 18-11-2014

Local buckling according to Quay Wall Handbook


Limitations:
Piles
- Method to be used for steel quality up to X70 (fy = 483 MPa)
- The formulas are valid for water head differences less than 4 m.
D
- Critical strain formula for pile fill with sand is only valid for 70 120
t
- Alternatively EN 1993-1-6 may be used for piles filled with sand. In that case the resistance may be
increased with a factor 1.13. This is only allowed for D/t < 100 and for D/t ² < 170.
Fill
- Sand shall be present in the area of the section subject to evaluation of the resistance. Sand may be
loose or medium dense, if naturally available.
- In actively filled piles the sand fill shall be compacted, obtaining 70% relative density or qc >10 MPa.
- Clay filled piles shall be considered as empty piles. Sand filled piles with thin (< 0.5 D) intermediate clay
layers may be considered as sand filled piles.
- The results of this work should not be used for dolphin piles of for other applications where plastic
deformation capacity is required. The effect of use of the recommendations for these type of structures
may result in choosing larger D/t ² values, which is not recommendable.

Geometry:
zt : m -> Top level of pile t Dout
zb : m -> Tip level of pile

ctc : m -> c.t.c of piles


(0 means only pile)
Pile:
Do : mm -> Outside section of pile
c.t.c.
t: mm -> Wall thickness

Do t
Di Do 2t 1152 mm -> Internal section of pile r 593 mm -> Radius of
2
middle surface
3 2 3 2 6 3
Apile 2 rt 126.7 10 mm -> Area Wpile r t 36.5 10 mm -> Section modulus
Do
3 10 4
Ipile r t 2.227 10 mm -> Moment of inertia
Sheet Pile:
tfl : mm -> flange thickness
tflange

tweb : mm -> web thickness tweb


hsp : mm -> height sheet pile
hps;total

Local buckling according to CUR Quay Walls 18-11-2014 1 of 6

Bijlage 05.2 / 3 - 8
PROJECT: Hotuhaven
SECTION: Controle palen achter ponton
DATE: 18-11-2014

Material properties:
E: N/mm² -> Modulus of Elasticity

Pile : N/mm² -> Steel quality pile


N
fyp 485 -> Yield strength pile
mm²

SP : N/mm² -> Steel quality sheet pile


N
fysp 240 -> Yield strength sheet pile
mm²

M0 : -> Safety factor

Classification of pile according to NEN-EN-1993-1-1, 5.5.2 / Table 5.2:


D [mm] t [mm] fy [N/mm²] [-] d/t ² [-] class 1: d/t ² <=50 / class 2: 50<d/t ² <=70
1220 34 485 0.696 74 class 3: 70<d/t ² <=90 / class 4: 90<d/t ²
Class 3: cross-sections are those in which the stress in the extreme compression fibre of the steel member assuming
an elastic distribution of stresses can reach the yield strength, but local buckling is liable to prevent development of the
plastic moment resistance.

Local buckling of pile according to NEN-EN-1993-1-6, D.1.2.2 (5):


Cylinders need not be checked against meridional shell buckling if they satisfy:
r E r E
0.03 17.441 0.03 13 x_ctrl "Check buckling"
t fyp t fyp

Load cases:
From sheet pile:
1 2 kNm
M sd.sheet tweb fysp 0 -> Maximum moment from sheet pile
4 m
2 M sd.sheet kN
wy.Ed if t fl = 0 0 0 -> Maximal support reaction
h sp tfl m
From soil and pile:
Soil loads are passive and/or active soil pressures, inside pile neutral soil pressure.
Amount of cases [min 1 / max 5, Left side is water/excavation side]:

Cases : -> i 1 cases

1 Soil
Pile loads
Level Left Right Intern
Case
`h water `h water `h N ed Med
[m +NAP] [kN/m²] [kN/m²] [kN/m²] [kN/m²] [kN/m²] [kN] [kNm]
1 -13.5 0.0 0.0 0.0 0.0 0.0 0 17576
0.0 0.0 0.0 0.0 0.0 0 0

Type of pile:
Pile : -> Choose type of pile (empty or fill)

Local buckling according to CUR Quay Walls 18-11-2014 2 of 6

Bijlage 05.2 / 4 - 8
PROJECT: Hotuhaven
SECTION: Controle palen achter ponton
DATE: 18-11-2014

Soil pressure:
External soil pressure should be calculated with a factor c.t.c/Do (pressure acting on the pile is equal to de c.t.c
between piles per m width of pile)
ctc ctc
qL if ctc = 0 1 'hL wL qR if ctc = 0 1 'hR wRi q Int 'hI
i Do i i i Do i i i
The pressures outside the tube had been averaged for the determination of the mean pressure on the
tube
qL qR
i i kN kN
q max q Int if q L 0 0
i 2 i i m² m²
qR q Int otherwise
i i

qL qR qInt q
Case
[kN/m²] [kN/m²] [kN/m²] [kN/m²]
1 0.0 0.0 0.0 0.0

qL q R q Int
Out of roundness:q
cases
NokN
re-rounding
kN effect
kN caused
kN by soil support to the sides of the tube has been taken in account
2 2 2 2
a- m m fabrication
Due to m m [NEN-EN 1993-1-6, tabel 8.1]:

Cl : Ur.max Cl Do 0.016 -> class [A:Excellent/B:High/C:Normal]

1
ea Ur.max Cl Do Do 4.76 mm
4

b- Due to tensile forces from secondary members [NEN-EN 1993-5, D.2.1]:


3 3
Et 1 2 1 r
EI eb min 0.1 r wy.Ed 0.00 mm
12 2 2 EI

c- Due to soil pressure:


4
q r
1 i kN T
ec if q L = 0 ec ( 0.00 ) mm
i 24 EI m²
4
q r
1 i
otherwise
12 EI

d- Ovalization as a second order effect:

M ed 2 5
r
i i T
ed ed ( 0.90 ) mm
i E Ipile i 2
t

Local buckling according to CUR Quay Walls 18-11-2014 3 of 6

Bijlage 05.2 / 5 - 8
PROJECT: Hotuhaven
SECTION: Controle palen achter ponton
DATE: 18-11-2014

Radius of top and bottom side of the tube due to ovalisation [r`]:
12 EI MN
k steel 66.748
4 m³
r
10kPa MN
k sand 0.017 ( Esand 10 kPa, see article 6.6.6.4, bending moment evaluation for sand-filled tube)
r m³
k steel
k 1
k steel k sand
r
etot ea eb ec ed et etot k if Pile = 2 r'
i i i i i i et
i
etot otherwise 1 3
i r
T
et ( 5.7 ) mm
T
r' ( 610.5 ) mm
Bending moment evaluation:
Do fyp
Critical strain: 35.882 y
t E
3
cri if Pile = 1 cr 11.424 10

t Do
0.25 0.0025 if 120
r' t
i
t
0.1 otherwise
r'
i
if Pile = 2
2 Do
t
7 if 70 120
r' t
i
"Out of range, to be calculated as empty pile" otherwise

cri
T
Parameter : ( 4.95 )
i
y

T
Plasticity rate: if 1 ( 11.7 ) °
i 2 i

1
asin otherwise
i

Local buckling according to CUR Quay Walls 18-11-2014 4 of 6

Bijlage 05.2 / 6 - 8
PROJECT: Hotuhaven
SECTION: Controle palen achter ponton
DATE: 18-11-2014

Bending moment as function of the plasticity rate:


2
Wpile fyp ( 2 r) t fyp
M el.d 16099 kNm M pl.d 21086 kNm
M0 M0
1 i
MR cos M pl.d if 1 MR 20942 kNm
i 2 sin i i
i
M el.d otherwise
i

Reduced bending moment and normal force:


meff;Sd due to tensile forces from secondary members is:
1 1 1
wy.Ed r wy.Ed r
2 kNm
meff.Sd.1 meff.Sd.1 0.0
2 m
meff;Sd due to soil:
1 2 3 2 2
q r q r
8 i 8 3 i kN kNm
meff.Sd.2 if q L = 0 meff.Sd.2 0.0
i 2 m² m
1 2 1 2
q r q r
4 i 4 i
otherwise
2

2 fyp
t kNm
mpl.Rd mpl.Rd 127.423
4 M0 m

meff.Sd.1 meff.Sd.2
i T
c1 4 2 3 c1 ( 2.00 )
i mpl.Rd
c1
i 2 T
g0 g0 ( 1.00 )
i 6 3
2 et
i T
gi 1 g ( 0.99 )
3r
T
si s1 Pile i s ( 1.00 )

M Rd g0 M M Rd 20809 kNm
i i g i si Ri
fyp
Npl Apile and NRd g 0 Npl NRd 55855 kN
M0 i i

Local buckling according to CUR Quay Walls 18-11-2014 5 of 6

Bijlage 05.2 / 7 - 8
PROJECT: Hotuhaven
SECTION: Controle palen achter ponton
DATE: 18-11-2014

Combined bending and normal force evaluation:

1.7
M ed Ned
i i
Ned M ed UC: 0.845
i i M Rd NRd
i i
0 kN 17576 kNm

Ctrl: x_ctrl "OK"

Local buckling according to CUR Quay Walls 18-11-2014 6 of 6

Bijlage 05.2 / 8 - 8
Definitief ontwerp
Berekening Houthaven aanlanding
Ontwerp afmeervoorzieningen

Colofon
DEFINITIEF ONTWERP
BEREKENING HOUTHAVEN AANLANDING
ONTWERP AFMEERVOORZIENINGEN

OPDRACHTGEVER:

Havenbedrijf Amsterdam

STATUS:

Definitief

AUTEUR:

ir. F.J. Kesting

GECONTROLEERD DOOR:

ir M. van Welsink
ir F.H. Leatemia

VRIJGEGEVEN DOOR:

ir F.H. Leatemia

18 november 2014
078153168:A

ARCADIS NEDERLAND BV
Lichtenauerlaan 100
Postbus 4205
3006 AE Rotterdam
Tel 010 2532 222
Fax 010 2532 194
www.arcadis.nl
Handelsregister 09036504
©ARCADIS. Alle rechten voorbehouden. Behoudens uitzonderingen door de
wet gesteld, mag zonder schriftelijke toestemming van de rechthebbenden niets
uit dit document worden verveelvoudigd en/of openbaar worden gemaakt door
middel van druk, fotokopie, digitale reproductie of anderszins.

078153168:A - Definitief ARCADIS 35