1 Reciprocating Compressor
- KOM EKS
1a VSD
expedite procurement to submit
- AML EKS 18-Jul-22 ABB, Schnider, Yaskawa, Siemens, Fuji closed
(using memorandum as attachment)
- Spec SH 23-Jun-22 closed
- D/S SH 21-Jun-22 closed
Expedite Engineerinng and vendor related
- Requisition SH 28-Jul-22 up stream data from compressor PO, need PO
tehnicall issue for Compressor
- Inquiry EKS 29-Jul-22
- Vendor Quotation EKS 12-Aug-22
- Technical Clarification SH 19-Aug-22
- TBE SH 7-Sep-22
- Commercial Clarification SH 14-Sep-22
- LOI / PO EKS 21-Sep-22
- Requisition GEG MFD 22-Jul-22 7-Jul-22 Awaiting final engineering study Closed
- Inquiry EKS 23-Jul-22 1-Aug-22 Awaiting Requisition -estimasi inquiry release senin 1 aug 2022
- TBE MFD 15-Aug-22
- LOI / PO EKS 29-Aug-22
3 Referigerant Package
- Process D/S DCA Closed
- Mech Spec & D/S BSK 1-Jul-22 7-Jul-22 Closed
- Requisition BSK 1-Jul-22 8-Jul-22 Under process JDMS Closed
6 vendor :
-heurtey pterochem france
- basuki pratama
- Inquiry EKS 2-Jul-22 23-Jul-22 -prosympac oil and gas Closed
- thermax babcock
- ITT SPA
- Kangwin Energy
5 Turbo Expander
- Process D/S DCA Closed
- Mech Spec & D/S BSK 7-Jul-22 8-Jul-22 Closed
- Requisition BSK 7-Jul-22 12-Jul-22 Closed
- Inquiry EKS 8-Jul-22 13-Jul-22 Cryostar, Chart Industries, Atlas Copco, Closed
- Received quotation Chart industries 29 Jul 2022, on going review, 4 aug planning meeting w/
- Vendor Quotation EKS 22-Jul-22 29-Jul-22
chart, 8 Aug 2022 meeting w/ atlas copco (baru terima teknikaL)
6 Dehydration Unit
- Process D/S DCA Closed
- Mech Spec & D/S BSK 14-Jul-22 15-Jul-22 Awaiting CPY comment Closed
- Requisition BSK 21-Jul-22 15-Jul-22 Closed
- Inquiry EKS 22-Jul-22 20-Jul-22 Axen, Zeochem, NOV (KOREA)
- Vendor Quotation EKS 5-Aug-22 1-Aug-22 ZEOCHEM BARU BERUPA CATALOG, PIETRO DECLINE
1 Reciprocating Compressor
1a VSD
expedite procurement to submit
- AML EKS 18-Jul-22 ABB, Schnider, Yaskawa, Siemens, Fuji closed
(using memorandum as attachment)
- Spec SH 23-Jun-22 closed
- D/S SH 21-Jun-22 closed
Expedite Engineerinng and vendor related tehnicall
- Requisition SH 28-Jul-22 up stream data from compressor PO, need PO
issue for Compressor
- Inquiry EKS 29-Jul-22
- Vendor Quotation EKS 12-Aug-22
- Technical Clarification SH 19-Aug-22
- TBE SH 7-Sep-22
- Commercial Clarification SH 14-Sep-22
- LOI / PO EKS 21-Sep-22
- Power Selection Study CPY approved to use GEG 4x1.5 (site rating) + GEC Closed
3 Referigerant Package
- Process D/S DCA Closed
- Mech Spec & D/S BSK 1-Jul-22 7-Jul-22 Closed
- Requisition BSK 1-Jul-22 8-Jul-22 Under process JDMS Closed
6 vendor :
-heurtey pterochem france
- basuki pratama
- Inquiry EKS 2-Jul-22 23-Jul-22 -prosympac oil and gas Closed
- thermax babcock
- ITT SPA
- Kangwin Energy
5 Turbo Expander
- Process D/S DCA Closed
- Mech Spec & D/S BSK 7-Jul-22 8-Jul-22 Closed
- Requisition BSK 7-Jul-22 12-Jul-22 Closed
- Inquiry EKS 8-Jul-22 13-Jul-22 Cryostar, Chart Industries, Atlas Copco, Closed
6 Dehydration Unit
- Process D/S DCA Closed
- Mech Spec & D/S BSK 14-Jul-22 15-Jul-22 Awaiting CPY comment Closed
- Requisition BSK 21-Jul-22 15-Jul-22 Closed
- Inquiry EKS 22-Jul-22 20-Jul-22 Axen, Zeochem, NOV (KOREA), Pietro
- Only received catalog product from zochem
- Vendor Quotation EKS 5-Aug-22 1-Aug-22
- Pietro decline
- Technical Clarification BSK 6 -12 Aug 2022
- TBE BSK 12-Aug-22
- Commercial Clarification EKS 19-Aug-22
- LOI / PO EKS 5-Sep-22
1 Reciprocating Compressor
- KOM EKS
1a VSD
expedite procurement to submit
- AML EKS 18-Jul-22 ABB, Schnider, Yaskawa, Siemens, Fuji closed
(using memorandum as attachment)
- Spec SH 23-Jun-22 closed
- D/S SH 21-Jun-22 closed
- Power Selection Study Agreed to use GEG 4x1.5 (site rating) + GEC Closed
- D/S GEG MFD 21-Jul-22 2-Aug-22 - following as per GEG 4x1.5 MW (site rating) Closed
- Requisition GEG MFD 22-Jul-22 7-Jul-22 Awaiting final engineering study electrical menyelesaikan calculation load study Closed
3 Referigerant Package
- Process D/S DCA Closed
- Mech Spec & D/S BSK 1-Jul-22 7-Jul-22 Closed
- Requisition BSK 1-Jul-22 8-Jul-22 Under process JDMS Closed
Under J-PLUS - Already sent to vendor via j-Plus
- Inquiry EKS 2-Jul-22 12-Jul-22 Closed
(Vendor : Mayekawa, Technical Asia, Johnson Control, Enerflex)
- Vendor Quotation EKS 22-Jul-22 30-Jul-22 - Received quotation from Technical Asia, Enerflex, Mayekawa. closed
- Johnson Control potential decline due to high workload
6 vendor :
-heurtey pterochem france
- basuki pratama
- Inquiry EKS 2-Jul-22 23-Jul-22 -prosympac oil and gas Closed
- thermax babcock
- ITT SPA
- Kangwin Energy
5 Turbo Expander
- Process D/S DCA Closed
- Mech Spec & D/S BSK 7-Jul-22 8-Jul-22 Closed
- Requisition BSK 7-Jul-22 12-Jul-22 Closed
- Inquiry EKS 8-Jul-22 13-Jul-22 Cryostar, Chart Industries, Atlas Copco, Closed
6 Dehydration Unit
- Process D/S DCA Closed
- Mech Spec & D/S BSK 14-Jul-22 15-Jul-22 Awaiting CPY comment Closed
- Requisition BSK 21-Jul-22 15-Jul-22 Closed
- Inquiry EKS 22-Jul-22 20-Jul-22 Axen, Zeochem, NOV (KOREA), Pietro
- Only received catalog product from zochem Expedite procurement for vendor quotation
- Vendor Quotation EKS 5-Aug-22 1-Aug-22
- Pietro decline submission
- Technical Clarification BSK 6 -12 Aug 2022
- TBE BSK 12-Aug-22
- Commercial Clarification EKS 19-Aug-22
- LOI / PO EKS 5-Sep-22
1 Reciprocating Compressor
- KOM EKS
1a VSD
expedite procurement to submit
- AML EKS 18-Jul-22 ABB, Schnider, Yaskawa, Siemens, Fuji closed
(using memorandum as attachment)
- Spec SH 23-Jun-22 closed
- D/S SH 21-Jun-22 closed
- Power Selection Study Agreed to use GEG 4x1.5 (site rating) + GEC Closed
- D/S GEG MFD 21-Jul-22 2-Aug-22 - following as per GEG 4x1.5 MW (site rating) Closed
- Requisition GEG MFD 22-Jul-22 7-Jul-22 Awaiting final engineering study electrical menyelesaikan calculation load study Closed
3 Referigerant Package
- Process D/S DCA Closed
- Mech Spec & D/S BSK 1-Jul-22 7-Jul-22 Closed
- Requisition BSK 1-Jul-22 8-Jul-22 Under process JDMS Closed
Under J-PLUS - Already sent to vendor via j-Plus
- Inquiry EKS 2-Jul-22 12-Jul-22 Closed
(Vendor : Mayekawa, Technical Asia, Johnson Control, Enerflex)
- Vendor Quotation EKS 22-Jul-22 30-Jul-22 - Received quotation from Technical Asia, Enerflex, Mayekawa. closed
- Johnson Control potential decline due to high workload
6 vendor :
-heurtey pterochem france
- basuki pratama
- Inquiry EKS 2-Jul-22 23-Jul-22 -prosympac oil and gas Closed
- thermax babcock
- ITT SPA
- Kangwin Energy
5 Turbo Expander
- Process D/S DCA Closed
- Mech Spec & D/S BSK 7-Jul-22 8-Jul-22 Closed
- Requisition BSK 7-Jul-22 12-Jul-22 Closed
- Inquiry EKS 8-Jul-22 13-Jul-22 Cryostar, Chart Industries, Atlas Copco, Closed
6 Dehydration Unit
- Process D/S DCA Closed
- Mech Spec & D/S BSK 14-Jul-22 15-Jul-22 Awaiting CPY comment Closed
- Requisition BSK 21-Jul-22 15-Jul-22 Closed
- Inquiry EKS 22-Jul-22 20-Jul-22 Axen, Zeochem, NOV (KOREA), Pietro
- Only received catalog product from zochem Expedite procurement for vendor quotation
- Vendor Quotation EKS 5-Aug-22 1-Aug-22
- Pietro decline submission
- Technical Clarification BSK 6 -12 Aug 2022
- TBE BSK 12-Aug-22
- Commercial Clarification EKS 19-Aug-22
- LOI / PO EKS 5-Sep-22
1 Reciprocating Compressor
- KOM EKS
1a VSD
expedite procurement to submit
- AML EKS 18-Jul-22 ABB, Schnider, Yaskawa, Siemens, Fuji closed
(using memorandum as attachment)
- Spec SH 23-Jun-22 closed
- D/S SH 21-Jun-22 closed
- Power Selection Study Agreed to use GEG 4x1.5 (site rating) + GEC Closed
- D/S GEG MFD 21-Jul-22 2-Aug-22 - following as per GEG 4x1.5 MW (site rating) Closed
- Requisition GEG MFD 22-Jul-22 7-Jul-22 Awaiting final engineering study electrical menyelesaikan calculation load study Closed
3 Referigerant Package
- Process D/S DCA Closed
- Mech Spec & D/S BSK 1-Jul-22 7-Jul-22 Closed
- Requisition BSK 1-Jul-22 8-Jul-22 Under process JDMS Closed
Under J-PLUS - Already sent to vendor via j-Plus
- Inquiry EKS 2-Jul-22 12-Jul-22 Closed
(Vendor : Mayekawa, Technical Asia, Johnson Control, Enerflex)
- Vendor Quotation EKS 22-Jul-22 30-Jul-22 - Received quotation from Technical Asia, Enerflex, Mayekawa. closed
- Johnson Control potential decline due to high workload
6 vendor :
-heurtey pterochem france
- basuki pratama
- Inquiry EKS 2-Jul-22 23-Jul-22 -prosympac oil and gas Closed
- thermax babcock
- ITT SPA
- Kangwin Energy
5 Turbo Expander
- Process D/S DCA Closed
- Mech Spec & D/S BSK 7-Jul-22 8-Jul-22 Closed
- Requisition BSK 7-Jul-22 12-Jul-22 Closed
- Inquiry EKS 8-Jul-22 13-Jul-22 Cryostar, Chart Industries, Atlas Copco, Closed
6 Dehydration Unit
- Process D/S DCA Closed
- Mech Spec & D/S BSK 14-Jul-22 15-Jul-22 Awaiting CPY comment Closed
- Requisition BSK 21-Jul-22 15-Jul-22 Closed
- Inquiry EKS 22-Jul-22 20-Jul-22 Axen, Zeochem, NOV (KOREA), Pietro
- Only received catalog product from zochem Expedite procurement for vendor quotation
- Vendor Quotation EKS 5-Aug-22 1-Aug-22
- Pietro decline submission
- Technical Clarification BSK 6 -12 Aug 2022
- TBE BSK 12-Aug-22
- Commercial Clarification EKS 19-Aug-22
- LOI / PO EKS 5-Sep-22
1 Reciprocating Compressor
- KOM EKS
1a VSD
expedite procurement to submit
- AML EKS 18-Jul-22 ABB, Schnider, Yaskawa, Siemens, Fuji closed
(using memorandum as attachment)
- Spec SH 23-Jun-22 closed
- D/S SH 21-Jun-22 closed
- Power Selection Study Agreed to use GEG 4x1.5 (site rating) + GEC Closed
8/2/2022
- D/S GEG MFD 21-Jul-22
3 aug 2022 - following as per GEG 4x1.5 MW (site rating) Closed
- Latest data sheet has sent
- Inquiry EKS 23-Jul-22 4-Aug-22 Inquiry sent, witing vendor qotation target 19 Aug 2022
- TBE MFD 15-Aug-22
- LOI / PO EKS 29-Aug-22
3 Referigerant Package
- Process D/S DCA Closed
- Mech Spec & D/S BSK 1-Jul-22 7-Jul-22 Closed
- Requisition BSK 1-Jul-22 8-Jul-22 Under process JDMS Closed
Under J-PLUS - Already sent to vendor via j-Plus
- Inquiry EKS 2-Jul-22 12-Jul-22 Closed
(Vendor : Mayekawa, Technical Asia, Johnson Control, Enerflex)
- Vendor Quotation EKS 22-Jul-22 30-Jul-22 - Received quotation from Technical Asia, Enerflex, Mayekawa. closed
- Johnson Control potential decline due to high workload
6 vendor :
-heurtey pterochem france
- basuki pratama
- Inquiry EKS 2-Jul-22 23-Jul-22 -prosympac oil and gas Closed
- thermax babcock
- ITT SPA
- Kangwin Energy
5 Turbo Expander
- Process D/S DCA Closed
- Mech Spec & D/S BSK 7-Jul-22 8-Jul-22 Closed
- Requisition BSK 7-Jul-22 12-Jul-22 Closed
- Inquiry EKS 8-Jul-22 13-Jul-22 Cryostar, Chart Industries, Atlas Copco, Closed
6 Dehydration Unit
- Process D/S DCA Closed
- Mech Spec & D/S BSK 14-Jul-22 15-Jul-22 Awaiting CPY comment Closed
- Requisition BSK 21-Jul-22 15-Jul-22 Closed
- Inquiry EKS 22-Jul-22 20-Jul-22 Axen, Zeochem, NOV (KOREA), Pietro
- Only received catalog product from zochem Expedite procurement for vendor quotation
- Vendor Quotation EKS 5-Aug-22 1-Aug-22
- Pietro decline submission
- Technical Clarification BSK 6 -12 Aug 2022
- TBE BSK 12-Aug-22
- Commercial Clarification EKS 19-Aug-22
- LOI / PO EKS 5-Sep-22
1 Reciprocating Compressor
TBE
(re-submit, following latest MFD 22-Aug-22
configuration)
- KOM EKS
1a VSD
- Requisition SH 28-Jul-22
For inlet/expor compressor VSD deleted, closed
included in refrigrant package vendor doc
- Inquiry EKS 29-Jul-22
- Vendor Quotation EKS 12-Aug-22
- Technical Clarification SH 19-Aug-22
- TBE SH 7-Sep-22
- Commercial Clarification SH 14-Sep-22
- LOI / PO EKS 21-Sep-22
- Power Selection Study Agreed to use GEG 4x1.5 (site rating) + GEC Closed
3 Referigerant Package
- Process D/S DCA Closed
- Mech Spec & D/S BSK 1-Jul-22 7-Jul-22 Closed
- Requisition BSK 1-Jul-22 8-Jul-22 Under process JDMS Closed
6 vendor :
-heurtey pterochem france
- basuki pratama
- prosympac oil and gas
- Inquiry EKS 2-Jul-22 23-Jul-22 - thermax babcock Closed
- ITT SPA
- Kangwoon Energy
- PT Insania Energy
5 Turbo Expander
- Process D/S DCA Closed
- Mech Spec & D/S BSK 7-Jul-22 8-Jul-22 Closed
- Requisition BSK 7-Jul-22 12-Jul-22 Closed
- Inquiry EKS 8-Jul-22 13-Jul-22 Cryostar, Chart Industries, Atlas Copco, Closed
- JIND has conduct technical clarification with Chart, - Atlas copco confirm to conduct technical meeting
- Technical Clarification BSK 23-28 Jul 2022
and Chart will send updated proposal technical on 13 Aug 2022 clarification on 11 Aug 2022
6 Dehydration Unit
- Process D/S DCA Closed
- Mech Spec & D/S BSK 14-Jul-22 15-Jul-22 Awaiting CPY comment Closed
- Requisition BSK 21-Jul-22 15-Jul-22 Closed
- Inquiry EKS 22-Jul-22 20-Jul-22 Axen, Zeochem, NOV (KOREA), Pietro
Received quotation from
- Pacific Process. Yuan Sejati, on 6 Aug 2022
- Vendor Quotation EKS 5-Aug-22 9-Aug-22
- Insania Energy on 9 Aug 2022
- Pietro Decline
- Technical Clarification BSK 6 -12 Aug 2022
- TBE BSK 12-Aug-22
- Commercial Clarification EKS 19-Aug-22
- LOI / PO EKS 5-Sep-22
7 Sales Gas Metering Closed
- Mech Spec & D/S SF 30-Jun-22 5-Jul-22 Closed
- Requisition SF 29-Jul-22 15-Jul-22 Closed
- Inquiry EKS 15-Jul-22 19-Jul-22
7 Vendor :
- Yokogawa - Elster Instromed
- Control system arena paranusa
- hanang gema
- Vendor Quotation EKS 29-Jul-22 5-Aug-22
- Ultra delta maju - SICK
- Duta instrument alfa sakti -SICK
- Yuan sejati - decline
- National energy solution - Daniel
1 Reciprocating Compressor
- Pre award meeting EKS 14 Jul 2022 15-Jul-22 following old design (motor driven) Closed
- KOM EKS
1a VSD
VSD For inlet/expor compressor no longer applicable,
included in refrigrant package vendor doc
- Power Selection Study Agreed to use GEG 4x1.5 (site rating) + GEC Closed
3 Referigerant Package
- Process D/S DCA Closed
- Mech Spec & D/S BSK 1-Jul-22 7-Jul-22 Closed
- Requisition BSK 1-Jul-22 8-Jul-22 Under process JDMS Closed
6 vendor :
-heurtey pterochem france
- basuki pratama
- prosympac oil and gas
- Inquiry EKS 2-Jul-22 23-Jul-22 - thermax babcock Closed
- ITT SPA
- Kangwoon Energy
- PT Insania Energy
5 Turbo Expander
- Process D/S DCA Closed
- Mech Spec & D/S BSK 7-Jul-22 8-Jul-22 Closed
- Requisition BSK 7-Jul-22 12-Jul-22 Closed
- Inquiry EKS 8-Jul-22 13-Jul-22 Cryostar, Chart Industries, Atlas Copco, Closed
6 Dehydration Unit
- Process D/S DCA Closed
- Mech Spec & D/S BSK 14-Jul-22 15-Jul-22 Awaiting CPY comment Closed
- Requisition BSK 21-Jul-22 15-Jul-22 Closed
- Inquiry EKS 22-Jul-22 20-Jul-22 Axen, Zeochem, NOV (KOREA), Pietro
Received quotation from
- Pacific Process. Yuan Sejati, on 6 Aug 2022
- Vendor Quotation EKS 5-Aug-22 9-Aug-22
- Insania Energy on 9 Aug 2022
- Pietro Decline
7 Vendor :
- Yokogawa - Elster Instromed
- Control system arena paranusa
- hanang gema
- Vendor Quotation EKS 29-Jul-22 5-Aug-22
- Ultra delta maju - SICK
- Duta instrument alfa sakti -SICK
- Yuan sejati - decline
- National energy solution - Daniel
1 Reciprocating Compressor
- Pre award meeting EKS 14 Jul 2022 15-Jul-22 following old design (motor driven) Closed
Technical Clarification MFD 15-Aug-22 15-Aug-22 Has conduct technical clarification meeting meeting with NEA
- KOM EKS
1a VSD
VSD For inlet/expor compressor no longer applicable,
included in refrigrant package vendor doc
Quotation EKS 15-Aug-22 19-Aug-22 - Received comercial offering letter from Altrac on 15 Aug 2022
3 Referigerant Package
- Process D/S DCA Closed
- Mech Spec & D/S BSK 1-Jul-22 7-Jul-22 Closed
- Requisition BSK 1-Jul-22 8-Jul-22 Under process JDMS Closed
- Technical Clarification BSK 22-24 aug 2022 - Clarificastion meeting with technical asia on 16 Aug 2022
6 vendor :
-heurtey pterochem france
- basuki pratama
- prosympac oil and gas
- Inquiry EKS 2-Jul-22 23-Jul-22 - thermax babcock Closed
- ITT SPA
- Kangwoon Energy
- PT Insania Energy
5 Turbo Expander
- Process D/S DCA Closed
- Mech Spec & D/S BSK 7-Jul-22 8-Jul-22 Closed
- Requisition BSK 7-Jul-22 12-Jul-22 Closed
- Inquiry EKS 8-Jul-22 13-Jul-22 Cryostar, Chart Industries, Atlas Copco, Closed
6 Dehydration Unit
- Process D/S DCA Closed
- Mech Spec & D/S BSK 14-Jul-22 15-Jul-22 Awaiting CPY comment Closed
- Requisition BSK 21-Jul-22 15-Jul-22 Closed
- Inquiry EKS 22-Jul-22 20-Jul-22 Axen, Zeochem, NOV (KOREA), Pietro
Received quotation from
- Pacific Process. Yuan Sejati, on 6 Aug 2022
- Vendor Quotation EKS 5-Aug-22 9-Aug-22
- Insania Energy on 9 Aug 2022
- Pietro Decline
7 Vendor :
- Yokogawa - Elster Instromed
- Control system arena paranusa
- hanang gema
- Vendor Quotation EKS 29-Jul-22 5-Aug-22
- Ultra delta maju - SICK
- Duta instrument alfa sakti -SICK
- Yuan sejati - decline
- National energy solution - Daniel
meeting with :
- National Energy Solution : 8 Aug 2022
- Yokogawa and UDM : 9 Aug 2022
- Technical Clarification SF 5 Aug - 25 Aug 2022 - Control System : 10 Aug 2022
- TBE SF 26-Aug-22
- Commercial Clarification EKS 27 Aug - 18 Sept 22
- LOI / PO EKS 19-Sep-22
No Description PIC Plan Actual Forecast TL Concern Mitigation/Action Status
1 Reciprocating Compressor
- Pre award meeting EKS 14 Jul 2022 15-Jul-22 following old design (motor driven) Closed
Technical Clarification MFD 15-Aug-22 15-Aug-22 Has conduct technical clarification meeting meeting with NEA
Updated D/S to CPY MFD 16-Aug-22 16-Aug-22 D/S submitted following latest configuration
- KOM EKS
1a VSD
VSD For inlet/expor compressor no longer applicable,
included in refrigrant package vendor doc
- Received comercial offering letter from Altrac on 15 Aug 2022, and Technical 19 aug
Quotation EKS 15-Aug-22 19-Aug-22
'- Received from enerflex 18 Aug 2022
3 Referigerant Package
- Process D/S DCA Closed
- Mech Spec & D/S BSK 1-Jul-22 7-Jul-22 Closed
- Requisition BSK 1-Jul-22 8-Jul-22 Under process JDMS Closed
- Technical Clarification BSK 22-24 aug 2022 - Clarificastion meeting with technical asia on 16 Aug 2022
6 vendor :
-heurtey pterochem france
- basuki pratama
- prosympac oil and gas
- Inquiry EKS 2-Jul-22 23-Jul-22 - thermax babcock Closed
- ITT SPA
- Kangwoon Energy
- PT Insania Energy
5 Turbo Expander
- Process D/S DCA Closed
- Mech Spec & D/S BSK 7-Jul-22 8-Jul-22 Closed
- Requisition BSK 7-Jul-22 12-Jul-22 Closed
- Inquiry EKS 8-Jul-22 13-Jul-22 Cryostar, Chart Industries, Atlas Copco, Closed
6 Dehydration Unit
- Process D/S DCA Closed
- Mech Spec & D/S BSK 14-Jul-22 15-Jul-22 Awaiting CPY comment Closed
- Requisition BSK 21-Jul-22 15-Jul-22 Closed
- Inquiry EKS 22-Jul-22 20-Jul-22 Axen, Zeochem, NOV (KOREA), Pietro
Received quotation from
- Pacific Process. Yuan Sejati, on 6 Aug 2022
- Vendor Quotation EKS 5-Aug-22 9-Aug-22
- Insania Energy on 9 Aug 2022
- Pietro Decline
7 Vendor :
- Yokogawa - Elster Instromed
- Control system arena paranusa
- hanang gema
- Vendor Quotation EKS 29-Jul-22 5-Aug-22
- Ultra delta maju - SICK
- Duta instrument alfa sakti -SICK
- Yuan sejati - decline
- National energy solution - Daniel
meeting with :
- National Energy Solution : 8 Aug 2022
- Yokogawa and UDM : 9 Aug 2022
- Technical Clarification SF 5 Aug - 25 Aug 2022 - Control System : 10 Aug 2022
1 Reciprocating Compressor
- Pre award meeting EKS 14 Jul 2022 15-Jul-22 following old design (motor driven) Closed
Technical Clarification MFD 15-Aug-22 15-Aug-22 Has conduct technical clarification meeting meeting with NEA
Updated D/S to CPY MFD 16-Aug-22 16-Aug-22 D/S submitted following latest configuration
- KOM EKS
1a VSD
VSD For inlet/expor compressor no longer applicable,
included in refrigrant package vendor doc
- Received comercial offering letter from Altrac on 15 Aug 2022, and Technical 19 aug
- Received from enerflex 18 Aug 2022
- Multikarya 19 aug 2022 accelerate in clarification and nomnated shorlisted
Quotation EKS 15-Aug-22 19-Aug-22
- Kaltimex 19 aug 2022 candidate
- Trakindo 19 aug 2022
-Euro asiatic 19 aug 2022 (reference list only)
3 Referigerant Package
- Process D/S DCA Closed
- Mech Spec & D/S BSK 1-Jul-22 7-Jul-22 Closed
- Requisition BSK 1-Jul-22 8-Jul-22 Under process JDMS Closed
- Technical Clarification BSK 22-24 aug 2022 - Clarificastion meeting with technical asia on 16 Aug 2022
6 vendor :
-heurtey pterochem france
- basuki pratama
- prosympac oil and gas
- Inquiry EKS 2-Jul-22 23-Jul-22 - thermax babcock Closed
- ITT SPA
- Kangwoon Energy
- PT Insania Energy
5 Turbo Expander
- Process D/S DCA Closed
- Mech Spec & D/S BSK 7-Jul-22 8-Jul-22 Closed
- Requisition BSK 7-Jul-22 12-Jul-22 Closed
- Inquiry EKS 8-Jul-22 13-Jul-22 Cryostar, Chart Industries, Atlas Copco, Closed
6 Dehydration Unit
- Process D/S DCA Closed
- Mech Spec & D/S BSK 14-Jul-22 15-Jul-22 Awaiting CPY comment Closed
- Requisition BSK 21-Jul-22 15-Jul-22 Closed
- Inquiry EKS 22-Jul-22 20-Jul-22 Axen, Zeochem, NOV (KOREA), Pietro
Received quotation from
- Pacific Process. Yuan Sejati, on 6 Aug 2022
- Vendor Quotation EKS 5-Aug-22 9-Aug-22
- Insania Energy on 9 Aug 2022
- Pietro Decline
7 Vendor :
- Yokogawa - Elster Instromed
- Control system arena paranusa
- hanang gema
- Vendor Quotation EKS 29-Jul-22 5-Aug-22
- Ultra delta maju - SICK
- Duta instrument alfa sakti -SICK
- Yuan sejati - decline
- National energy solution - Daniel
meeting with :
- National Energy Solution : 8 Aug 2022
- Yokogawa and UDM : 9 Aug 2022
- Technical Clarification SF 5 Aug - 25 Aug 2022 - Control System : 10 Aug 2022
8 Steel Structure
- Specification DH 14-Jul-22
- Steel Structure DWG IFR DH 9-Sep-22
- Requisition DH 14-Jul-22
- Inquiry EKS 24-Jun-22
- Vendor Quotation EKS 14-Jul-22
- Technical Clarification DH 28-Jul-22
- TBE DH 28-Jul-22
- Commercial Clarification EKS 28-Jul-22
- LOI / PO EKS 22-Aug-22
1 Reciprocating Compressor
- Pre award meeting EKS 14 Jul 2022 15-Jul-22 following old design (motor driven) Closed
Technical Clarification MFD 15-Aug-22 15-Aug-22 Has conduct technical clarification meeting meeting with NEA
Updated D/S to CPY MFD 16-Aug-22 16-Aug-22 D/S submitted following latest configuration
- KOM EKS
1a VSD
VSD For inlet/expor compressor no longer applicable,
included in refrigrant package vendor doc
- Received comercial offering letter from Altrac on 15 Aug 2022, and Technical 19 aug
- Received from enerflex 18 Aug 2022
- Multikarya 19 aug 2022
Quotation EKS 15-Aug-22 19-Aug-22
- Kaltimex 19 aug 2022
- Trakindo 19 aug 2022
-Euro asiatic 19 aug 2022 (reference list only)
3 Referigerant Package
- Process D/S DCA Closed
- Mech Spec & D/S BSK 1-Jul-22 7-Jul-22 Closed
- Requisition BSK 1-Jul-22 8-Jul-22 Under process JDMS Closed
- Technical Clarification BSK 22-24 aug 2022 - Clarificastion meeting with technical asia on 16 Aug 2022
6 vendor :
-heurtey pterochem france
- basuki pratama
- prosympac oil and gas
- Inquiry EKS 2-Jul-22 23-Jul-22 - thermax babcock Closed
- ITT SPA
- Kangwoon Energy
- PT Insania Energy
5 Turbo Expander
- Process D/S DCA Closed
- Mech Spec & D/S BSK 7-Jul-22 8-Jul-22 Closed
- Requisition BSK 7-Jul-22 12-Jul-22 Closed
- Inquiry EKS 8-Jul-22 13-Jul-22 Cryostar, Chart Industries, Atlas Copco, Closed
6 Dehydration Unit
- Process D/S DCA Closed
- Mech Spec & D/S BSK 14-Jul-22 15-Jul-22 Awaiting CPY comment Closed
- Requisition BSK 21-Jul-22 15-Jul-22 Closed
- Inquiry EKS 22-Jul-22 20-Jul-22 Axen, Zeochem, NOV (KOREA), Pietro
Received quotation from
- Pacific Process. Yuan Sejati, on 6 Aug 2022
- Vendor Quotation EKS 5-Aug-22 9-Aug-22
- Insania Energy on 9 Aug 2022
- Pietro Decline
7 Vendor :
- Yokogawa - Elster Instromed
- Control system arena paranusa
- hanang gema
- Vendor Quotation EKS 29-Jul-22 5-Aug-22
- Ultra delta maju - SICK
- Duta instrument alfa sakti -SICK
- Yuan sejati - decline
- National energy solution - Daniel
meeting with :
- National Energy Solution : 8 Aug 2022
- Yokogawa and UDM : 9 Aug 2022
- Technical Clarification SF 5 Aug - 25 Aug 2022 - Control System : 10 Aug 2022
8 Steel Structure
- Specification DH 14-Jul-22
- Steel Structure DWG IFR DH 9-Sep-22
- Requisition DH 14-Jul-22
- Inquiry EKS 24-Jun-22
- Vendor Quotation EKS 14-Jul-22
- Technical Clarification DH 28-Jul-22
- TBE DH 28-Jul-22
- Commercial Clarification EKS 28-Jul-22
- LOI / PO EKS 22-Aug-22
1 Reciprocating Compressor
- Pre award meeting EKS 14 Jul 2022 15-Jul-22 following old design (motor driven) Closed
Technical Clarification MFD 15-Aug-22 15-Aug-22 Has conduct technical clarification meeting meeting with NEA
Updated D/S to CPY MFD 16-Aug-22 16-Aug-22 D/S submitted following latest configuration
- KOM EKS
1a VSD
VSD For inlet/expor compressor no longer applicable,
included in refrigrant package vendor doc
- Received comercial offering letter from Altrac on 15 Aug 2022, and Technical 19 aug
- Received from enerflex 18 Aug 2022
- Multikarya 19 aug 2022
Quotation EKS 15-Aug-22 19-Aug-22 Closed
- Kaltimex 19 aug 2022
- Trakindo 19 aug 2022
-Euro asiatic 19 aug 2022 (reference list only)
3 Referigerant Package
- Process D/S DCA Closed
- Mech Spec & D/S BSK 1-Jul-22 7-Jul-22 Closed
- Requisition BSK 1-Jul-22 8-Jul-22 Under process JDMS Closed
6 vendor :
-heurtey pterochem france
- basuki pratama
- prosympac oil and gas
- Inquiry EKS 2-Jul-22 23-Jul-22 - thermax babcock Closed
- ITT SPA
- Kangwoon Energy
- PT Insania Energy
5 Turbo Expander
- Process D/S DCA Closed
- Mech Spec & D/S BSK 7-Jul-22 8-Jul-22 Closed
- Requisition BSK 7-Jul-22 12-Jul-22 Closed
- Inquiry EKS 8-Jul-22 13-Jul-22 Cryostar, Chart Industries, Atlas Copco, Closed
6 Dehydration Unit
- Process D/S DCA Closed
- Mech Spec & D/S BSK 14-Jul-22 15-Jul-22 Awaiting CPY comment Closed
- Requisition BSK 21-Jul-22 15-Jul-22 Closed
- Inquiry EKS 22-Jul-22 20-Jul-22 Axen, Zeochem, NOV (KOREA), Pietro
Received quotation from
- Pacific Process. Yuan Sejati, on 6 Aug 2022
- Vendor Quotation EKS 5-Aug-22 9-Aug-22
- Insania Energy on 9 Aug 2022
- Pietro Decline
JIND requested vendor to provide
- Technical Clarification BSK 23-26 Aug 2022 reference/code/standard regarding water content
issue
7 Vendor :
- Yokogawa - Elster Instromed
- Control system arena paranusa
- hanang gema
- Vendor Quotation EKS 29-Jul-22 5-Aug-22 5-Aug-22
- Ultra delta maju - SICK
- Duta instrument alfa sakti -SICK
- Yuan sejati - decline
- National energy solution - Daniel
meeting with :
- National Energy Solution : 8 Aug 2022
- Yokogawa and UDM : 9 Aug 2022
- Technical Clarification SF 5 Aug - 25 Aug 2022 5 aug - 26 aug 2022 5 aug - 26 aug 2022 - Control System : 10 Aug 2022
- TBE issue to client SF 2-Sep-22 Shorlisted estimate 26 Aug 2022 30 Aug 2022
- Commercial Clarification EKS 27 Aug - 18 Sept 22
- LOI / PO EKS 19-Sep-22