Paintings
Project :
The purpose of this method statement is to provide general guidelines for painting works, and to define the inspection activities. It covers the activities of painting
works at all project sites.
3. REFRENCE
4. RESPONSIBILITIES
Project Manager
Project/Construction Manager will be responsible for:-
➢ Overall implementation and monitoring of all the activities
in the method of statement of Paintings.
Site Manager
Site Manager will be responsible for:-
➢ Over-all direction.
➢ Monitoring.
➢ Coordination.
➢ Control of all the constructions activities related to the paintings.
Site Engineer/Supervisor
The Site engineer will be responsible for:-
➢ Directly involved in the planning and execution of the activities involved in the Paintings.
➢ Work permits in place prior to commence of works.
➢ Directly control and give instruction to the working personnel.
➢ Ensure that works are performed with proper tools/equipment, PPE’s and good housekeeping around the working area.
QA/QC Manager/Engineer
QA/QC Engineer will be responsible for:-
➢ Monitoring the work is carried out as per the Company approved ITP.
➢ To ensure all materials to be used is approved by the COMPANY.
➢ Check each and every activity before and after the completion of the work.
HSE engineer/Supervisor
Safety engineer / Supervisor will be responsible:-
➢ Ensure work is carried out as per Safe Work Practices, start card and work permit has been prepared and issued.
➢ To conduct tool box talk and maintain safety check list prior to commence the activity.
Paintings
Project :
6. PROCEDURE
Paintings
Project :
7. ATTACHEMENTS
Nil