Bole Junction – Weterdino Horticulture and Bole – Abomsa Design and Build Road Project

Response to Employer’s Representative Comments on the Draft Geotechnical Report for Culvert Foundations for Bole – Abomsa
Section from: K5 to k19.96
No. Section Comment Reply
1 Figure 2-2 1. Can you possibly mark the chainages at least - Noted. Incorporated.
5km intervals, so it will help to visualize the
distribution of regional geological setting
along the route
2. Include the Northing pointer, Geo-references - Noted. Incorporated.
on the boundaries & scale for the Map

2 Table 3-1 You are advised to include the natural ground It should not necessarily be shown in this
elevation for each Culvert sites report. That will be clearly indicated in the
Shop drawings. However to satisfy your
demand it is now included.

3 Conclusion and For stations Km5+932 & 11+580, allowable Hard rock bed was encountered at these
recommendations bearing capacity is determined based on locations. A safe and conservative presumed
“presumed values:- where usually referred for bearing capacity was recommended for the
preliminary design purposes” only. Can you culvert foundations. Expected Applied loads
justify using some technical tests such as Schmidt to foundation soil are in the order of 250kpa.
hammer or a Point Load test on a piece of rock Often the trend was that Schmidt hammer
fragments collected from the site? readings were required for Major / Bridge
foundations structure to assess the
preliminary BC but not for culverts. For this
reason the team did not carry a Schmidt
hammer at the time of the investigation.
4 General procedure As per ERA 2013 Standard, sub-surface SIP was submitted for major structures site
investigation plan (SIP) had been submitted for investigation /drilling work.
review and approval before conducting the actual
site investigation work on the site.