Professional Documents
Culture Documents
Qcpi 8
Qcpi 8
- CDO FACTORY
Daily Welder
Performance Record
13. NDE OF FIELD/ Pipe to pipe, to fitting Butt joint full penetration RT Per line - ASME B 31.3
Pipe to support
Rate.
Record of Repairs
14. PWHT OF Weld Joints Welds/Base Metal Verification As required - Approved Project
15. PREPARATION Testpack Content Completeness Verification 100% 100% Approved Project
12.2 Shall be free from weld defects. Acceptance criteria for visual C W W
13.3 Shall not exceed 5 % of the total joints RT'd or total joints UT'd. - R R
14.1 Shall be as required by line class and as per ASME B 31.3 D/C C R