You are on page 1of 2

GOVERNMENT OF GOA

DIRECTORATE OF SKILL DEVELOPMENT & ENTREPRENEURSHIP


Industrial Training Institute, Bicholim Goa.
JOB PLAN
Name: Shaibaz G. Shaikh Trade: Fitter

Unit No.: 12 Job No.: 2 Job Sr. No.: 91 Time allotted:

Date of Starting: Date of Completion:

MARKING SCHEME
A B C D E F Total

Job Handling Safety


Particular application Drilling
preparation equipments precautions
Marks
20 20 30 20 10 100
Allotted

TITLE : True job on four jaw chuck using knife tool

SKETCH

All Dimensions are in MM


Tools/Equipments Sr.
Sr. Items required with Sr. Skills
Quantity required with Quantity No
No. specification No. Involved
specification .
1 Bastard File 1 No. 1 Filling
1. M.S. Round 40X250 1 No. 2 Second Cut File 1 No. 2 Drilling
3 Try square 1 No. 3 Angular
4 Vernier Caliper 1 No. Filing
5 Vernier Height 1 No. 4 Fitting
Gauge
6 Chisel 1 No.
7 Hammer 1 No.
8 Drill Machine 1 No.

PROCEDURE:
1. Open one jaw by chuck key.

2. Turn the chuck and open the opposite jaw

3. Open all jour jaws approximately more than job diameter

4. Keep the job inside the jaws

5. Make jaws close and hold the job

6. Check the job trueness by knife tool.

7. Tighten all the jaws.

8. Check the trueness of the job by rotating the chuck in neutral position using knife tool.

9. Knife tool should touch the job evenly.

10. Check once again for the true running of the job

SAFETY PRECAUTIONS:

a) Marking should never be done by damage tool


b) The correct tools and equipment’s should always be used
c) Coolant should be used wile drilling the hole.

Signature Signature
Vocational Instructor with date Group Instructor with date

You might also like