You are on page 1of 8

Project Elite

UNIT TEST RESULT DOCUMENT


Stryker Incoming first pass yield

PUR-R-23

Prepared By: Venkata Satyanarayana TH

Author: Venkata Satyanarayana TH

Creation Date: Mar 26, 2009

Last Updated:

Last Updated By:

Version: 1.0
Incoming First Pass Yield Report
Unit Test Document

Contributors

Name Position

Test Plan Reviewers / Approvers

Name Position
Ali Chowdhury Technical Manager
Praveen Kumar Technical Lead
Murali Bollavaram Offshore Lead

Change Record

Date Author Version Change Reference


26-Mar-2009 Venkata Satyanarayana TH 1.0 Initial

Related Documents

Document Name Description

10/29/2023 Page 2 of 8
STRYKER Confidential
Incoming First Pass Yield Report
Unit Test Document

Contents

1 INTRODUCTION...............................................................................................4

Purpose........................................................................................................................................... 4

References....................................................................................................................................... 4

Definitions....................................................................................................................................... 4

Assumptions.................................................................................................................................... 4

2 APPROACH......................................................................................................5

3 TEST CASES....................................................................................................6

4 Approvals........................................................................................................ 8

10/29/2023 Page 3 of 8
STRYKER Confidential
Incoming First Pass Yield Report
Unit Test Document

1 INTRODUCTION
Purpose
The purpose of this document is to provide a testing strategy for Stryker SPR Supplier FPY Report.

References

This test references the following documents:

Document Version Date


1.0
PUR-R-23 Supplier FPY Report Functional Design

Table 1: References

Definitions

Assumptions

10/29/2023 Page 4 of 8
STRYKER Confidential
Incoming First Pass Yield Report
Unit Test Document

2 APPROACH
The program includes Stryker SPR Supplier FPY Report Concurrent Program, which is to run manually.
 Run Stryker Stryker SPR Supplier FPY Report , using different parameter values.
 Verify displaying report type and format right.

10/29/2023 Page 5 of 8
STRYKER Confidential
Incoming First Pass Yield Report
Unit Test Document

3 TEST CASES

Table 1: Test cases and Input/output Specifications

Tech Tested By Commen


Actual Results Pass / Fail Design ts
Refere
Expected nce
Test Case Inputs Outputs
Results (Pg
No. /
Sec
No.)
1 Verify Report Organization Data was Only Only display data Pass Venkata
Conditions ‘SPR restricted display with Organization Satyanarayana
Business Unit by input data with ’ name ‘SPR’ and TH
parameter Organizatio the given
s n’SPR’ and Business Unit
the given
Business
Unit

2 Verify Report Organization Data was Only No Data Found Pass Venkata
Conditions ‘SPR restricted display for the given Satyanarayana
Business Unit by input data with ’ Organization, TH
,Vendor parameter Organizatio Business Unit,
Name s n’SPR’ and the given
,business Vendor name
Unit, and
the given
vendor
name
3 Verify Report Organization Data was Only displayed data Pass Venkata
Conditions ‘SPR, restricted display with ’ Satyanarayana
Business Unit by input data with ’ Organization’SPR’ TH
,Vendor parameter Organizatio ,business Unit,
Name, s n’SPR’ vendor name
Date From, ,business And the
Date to Unit, transaction that
vendor are between the
name given dates
And the
transaction
that are
between
the given
dates

10/29/2023 Page 6 of 8
STRYKER Confidential
Incoming First Pass Yield Report
Unit Test Document

4 Verify Report Organization Data was Only Displayed data Pass Venkata
Conditions ‘SPR, restricted display with ’ Satyanarayana
Business Unit by input data with ’ Organization’SPR TH
,Vendor parameter Organizatio ,business Unit,
Name, n’SPR’ vendor name,
Date From, ,business transaction that
Date to, Unit, are between the
Item From, vendor given dates and
Item To name, The data of given
transaction Item Numbers
that are
between
the given
dates and
The data of
given Item
Numbers

10/29/2023 Page 7 of 8
STRYKER Confidential
Incoming First Pass Yield Report
Unit Test Document

4 APPROVALS

Unit Test Plan Signoff

Client: STRYKER Endoscopy

Project: Elite

Initiated by: Venkata Satyanarayana TH Date: 26-Mar-2009

Deliverable Reference: Type:

Deliverable Description:

The above deliverable has been reviewed by STRYKER Software and fully meets the objectives expressed by
STRYKER Endoscopy and passes the acceptance criteria specified by STRYKER Endoscopy.

Signed for STRYKER Software Date

_________________________________

_________________________________

10/29/2023 Page 8 of 8
STRYKER Confidential

You might also like