You are on page 1of 8

OISD/DOcI2021/2

OISD-GDN - 202 Page No. 1


Field Inspection of Drilling and Work-over Rig Mast, Sub
Structure &Equipment

9.0 ANNEXURES

9.1 Annexure I
CHECKLIST OE VISUALEELD NSPECTUON OFMAST &SUB-STRUCTURE*
(Level Il -rig up)

RIG NAME: RIG NO.

LOCATION DATE

MAST/DERRICK
IDENTIFICATION NO. SR. NO.

YEAR OF MANUFACTURE

RIG STANDING

INSPECTED BY

ACTIVE SERVICE YEARS

DATE OF LAST INSPECTION

CUMULATIVE METERAGE DRILLED

A) MAST/DERRICK:

I CrownAssembly
a) Sheaves

NO. MAIN CLUSTER SHEA VE SIZE FAST LINE SHEAVE SIZE

b) Condition

1. SHEAVES: WARPED OK
GROOVE: WORN OK

2. SPACERSOR SEALS: BAD OK


GREASE FITTING: MISSING OK

3. BEARINGS: LOOSE BAD OK

7. CROWN SAFETY PLATFORM: MINOR DAMAGE BADLY DAMAGED


WELD CRACKS OK
OISD-GDN 202

Field Inspection of Drilling and


Work-over Rig Mast, Sub
Page No. 1
OISDIDOG2021.
Structure &Equipment

BADLY DAMAGED
CROWN HANDRAILS: MINOR DAMAGE
WELD CRACKS OK

BEAM FLANGES
6. CROWN FRAME: BENT
BEAM WEBS BENT CRACKED WELDS
LOCATION OK
7. COMMENT: RUSTY NEEDS REPAIR
NEEDS PAINTING OTHER OK

Additional Sheave Assemblies:

NAME OK
NUMBER OF VISIBLE MARKS APPLIED

III Crown Support Beams


BEAM FLANGES BENT

BEAM WEBS BENT

CRACKED WELDS OK

NEEDS REPAIR
NUMBER OF VISIBLE MARKS APPLIED

IV Legs
The following points are to be checked at Front Leg off Drillers Side, Front Leg on Drillers Side,
a)
Rear Leg Drillers Side, Rear Leg Off Drillers Side

BEND within Limit BEND Exceeding limit


NEEDS REPAIR OK
PIN CONNECTION: BAD OK
PIN HOLE. BAD OK
CRACKED WELDS OK
SAFETY PINS: MISSING OK

V Spreaders (Back Panel trusses)

DAMAGE within limit DAMAGE exceeding limit OK


CRACKED WELDS
NEEDS REPAIR OK
BOLT AND PIN: IMPROPER LENGTH OK
SAFETY PINS: MISSING OK
BOLT AND PIN HOLES:OVAL OK

VI. Girts and Bracing (diagonal braces)


OK
BENT
NUMBER BENT: SLIGHT NOS. BADLY NOS.
CRACKED WELDS
NEEDS REPAIR OK

or responsibility for loss or damage resulting


"OISD hereby expressly disclaims any liabilityStandards/Guidelines.
from the use of OISD
OISD/DocI2021/28
OISD-GDN-202 Page No. 1

Field Inspection of Drilling and Work-over Rig Mast, Sub


Structure & Equipment

NO OF VISIBLE MARKS APPLIED

VII. Feet or Pivots(Mast lugs)


DAMAGED
CRACKED WELDS
CORRODED
WORN HOLES WORN PINS
NEEDS REPAIRS

VIIL. A- Frame

a) LEGS: DAMAGED MEMBERS


CRACKED WELDS
OK
TRUSSES: DAMAGED MEMBERS
b) SPREADERS OR
CRACKED WELDS OK
DAMAGED
c)UPPER CONNECTIONS:
CRACKED WELDS OK
d)LOWER CONNECTIONS:
OK
CORRODED
PIN CONNECTION: LOOSE OK
PINHOLE: WORN OK
SAFETY PINS: MISSING OK

IX. WORKING PLATFORM


a) RACKING PLATFORM:
OK
FRAME: DAMAGED
OK
CRACKED WELDS
OK
PIN CONNECTION:WORN
SAFETY PINS: MISSING OK
FINGERS : DAMAGED OK
OK
NEEDS REPAIR

b) RACKING HANDLERS:
OK
FRAME: DAMAGED
OK
FINGERS :DAMAGED OK
BASKET :DAMAGED
OK
CRACKED WELDS

c)WORKING PLATFORM DAMAGED OK


OK
CRACKED WELDS
OK
TUBING SUPPORT FRAME:DAMAGED OK
CONNECTIONS: DAMAGE
OK
CRACKED WELDS

HAND RAILS:
OK
DAMAGES:MINOR MAJOR
CRACKED WELDS OK
CONNECTIONS: NEED REPAIRS OK

"OSD hereby expressly disclaims any liability or responsibillty for loss or damage resulting
OI/SD Standards/Guidelines."
from the use of
OISD -GDN - 202 Page No. 1
Field Inspection of Drilling and Work-over Rig Mast, Sub
Structure &Equipment OSDIDc
X. LADDERS

CRACKED WELDS BAD RUNGS


BAD CONNECTIONS OK
DAMAGES: MINOR MAJOR_
RAISING AND TELESCOPING SYSTEM:

WIRELINE SYSTEM REFER TO API4E FOR SPECIFICATIONS


a) WIRE LINE:FRAYED KINKED
CORRODED OK
b) CABLE CLAMPS:LOOSE OK
NO. OF CLAMPS PROPERLY INSTALLED

SHEAVES AND MOUNTINGS: DAMAGED OK


d) EQUALISER ASSY.: DAMAGED OK_
SOCKETSAND PINS:DAMAGED OK

HYDRAULICSYSTEM:
1 HYDRAULICCYLINDERS:
i) RAISING: LEAKING OK
EXPOSED SURFACE OK
CORRODED OK
ii) SCOPING: LEAKING OK
EXPOSED SURFACE OK
CORRODED OK
2. CONNECTIONS: LEAKING OK
3. HOSES & HOSE END FITTING:
EXPOSED WIRE CORRODED OK
DAMAGED OK
4. PIN HOLES: OVAL OK

5 SCOPING CYLINDER STABILIZERS:


BENT OK
LUBRICATION OK
MAST GUIDES :

CLEANED AND LUBRICATED OK


NEEDS ATTENTION OK

XIL. LOCKING DEVICES & SEATS TELESCOPINGMASTS

a) PINS, BARS OR PAWLS : DAMAGED OK


b) SEATS :DEFORMED OK
c) MECHANISM : DAMAGED OK

"OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines."
OISD/DOCI2021/28
OISD -GDN 202 Page No. 1
Field Inspection of Drilingand Work-over Rig Mast, Sub
Stety Brector
Structure &Equipment

NEEDSCLEANING & LUBRICATION OK


d)
XIII. GUYLINES ANCHORAGE:
a) GUY LINE:DAMAGED
b) NEEDSADJUSTING
OK
NEEDSREPLACING
OK
CABLE CLAMPS: LOOSE
PROPERLY INSTALLED OK
SOME MISSING
OK_
PINS AND SAFETY PINS: MISSING
TURNBUCKLES: LOCKED/DAMAGED/REPLACE OK

OK
ANCHOR & DEADEND: REPLACE

BOLTED STRUCTURES:
XIV.
TIGHTENED, AND MISSING PARTS
CONNECTIONS ARE TO BE INSPECTED, AND IN NEED OF REPAIR.
a) ALL BOLTED AS MISSING OR DAMAGED
REPLACED OR VISIBLY MARKED
BE SATISFACTOY AS
CHECKED AND LOOSE BOLTS
CONNECTIONS FOUND TO
b) ALL BOLTED
TIGHTENED
SPOTCHECKED FOR TIGHTNESS AND
VISUALLY INSPECTED AND
c)ALL BOLTED CONNECTIONS OR REPAIRS NECESSARY.
TIGHTENING
NOFURTHER BOLT

DERRICK & MAST


XV, SUMMARY OF INSPECTION OF
YES/NO
ASSY, DRAWING USED:
a) WAS MANUFACTURER'S POOR
APPEARANCE: GOOD FAIR
b) MINOR MAJOR
REPAIRS NEED: NONE
NUMBER OF MISSING PARTS
d)
EXTENSION
SUBSTRUCTURE & VERTICAL
A) OK
PIVOTS: DAMAGED
(a) SHOES, PEDESTALS OR OK
HOLES: WORN OK
BOLTS: NEED REPLACING OK
PINS: WORN OK
SAFETY PINS: MISSING DAMAGED
BEAMS:
SUPPORT OK
CORRODED:

FLOORING OK_
(b) DAMAGES: MINOR MAJOR

& SUB-SPREADERS & ROTARY BEAMS:


SUBSTRUCTURESFOR DERRICK OR MAST
(c)

damage resulting
expressly disclaims or responsibility for loss or
any liability Standards/Guidelines."
"OISD hereby
from the use of Ol/SD
OISD -GDN 202
Drilling and Work-over Rig Mast, Sub
Field Inspection ofStructure
Page No. 1
oIsDDoG2,
&Equipment

MAJOR OK
DAMAGES: MINOR
MAJOR OK
CORROSION: MINOR
CONNECTIONS: WORN
CRACKED WELDS
SAFETY PINS: MISSING OK

d) ENGINE FOUNDATION SPREADERS:

DAMAGES: MINOR MAJOR OK


CORROSION: MINOR MAJOR OK
CONNECTIONS WORN
CRACKED WELDS OK
SAFETY PINS: MISSING OK

STAIRWAYS, LANDINGS & HANDRAILS

DAMAGES: MINOR MAJOR OK

f) HOLD DOWN AND ANCHORING CONNECTIONS:


BOLTS TIGHT BOLTS MISSING
DAMAGED
NEEDS REPAIRING
OK

g) FOUNDATION:
ADEQUATE: YES NO WHY

h) SUMMARY OF INSPECTION OF SUBSTRUCTURE &VERTICAL EXTENTION


APPEARANCE: GOOD FAIR POOR
REPAIR NEEDED: NONE MINOR MAJOR
WAS MANUFACTURE'S ASSEMBLY DRAWING USED? YESNO
NUMBER OF MISSING PARTS

LOCALISED CLEANING DONE:


SAND BLASTING DONE:
NDT DONE
:(MPI/UT)
HORIZONTAL MEMBER:
SLIGHTDAMAGE ;BADLY DAMAGED
CRACKED WELDS NEED REPAIR

VERTICAL MEMBER:
SLIGHT DAMAGE ;BADLY DAMAGED
CRACKED WELDS NEED REPAIR

DIAGONAL MEMBER:
SLIGHT DAMAGE ;BADLY DAMAGED
CRACKED WELDS NEED REPAIR

FEET:

disclaims any liability or responsibility for loss or damage resulting


"OISD hereby expresslyfrom the use of OlSD Standards/Guidelines.
OISD -GDN -202 Page No. 1
OISD/D0CI2021/28
Field Inspection of Drilling and
Work-over Rig Mast, Sub
Structure &Equipment

DAMAGED :CRACKED WELDS


CORRODED ;WORN HOLES
WORN PINS ; NEED REPAIR

B) SUBSTRUCTURE FOR MAST:

PRIMARY LOAD BEARING MEMBER:


SLIGHTDAMAGE BADLY DAMAGED
CRACKED WELDS ; NEED REPAIR
NEEDREPLACEMENT
SECONDARY LOAD BEARING MEMBER:
SLIGHT DAMAGE ;BADLY DAMAGED
CRACKED WELDS ;NEEDREPAIR
NEED REPLACEMENT
ANY OTHER MEMBER(INCLUDING DIAGONAL):
SLIGHT DAMAGE BADLY DAMAGED
CRACKED WELDS ;NEED REPAIR
NEED REPLACEMENT

FLOORING:
DAMAGES: MINOR ;MAJOR
REPLACEMENT NEEDED
REPAIR NEEDED
CORROSION: MINOR MAJOR ; NONE

PAINTING DONE:
.NO APPEARANCE
YES

ELECTRICAL LIGHTING
DURING THE WORKING HOURS AT
ADEQUATE GENERAL LIGHTING ARRANGEMENTS AVAILABLE
YES NO
A)DERRICKFLOOR
YES NO
B)MONKEY BOARD NO
C)DRILLER'S END YES
YES NO
D)DOG HOUSE NO
YES
E)BOPCONTROL NO
YES
F)CAT WALK NO
WORK YES
G)EVERY PLACE WHERE PERSONS ARE TO NO
H)EVERY PLACE OF ESCAPE/ACCESS YES

LIGHTING PROVIDED AT THE MAST /SUBSTRUCTURE


GLARE
CAUSE ANY
IS SO ARRANGED THAT IT DOES NOT YES NO
OR EYE STRAIN.
IS OF
LIGHTING PROVIDED AT MAST / SUB STRUCTURE
INCREASED SAFETY TYPE AS PER ZONE 2
YES NO
REQUIREMENT OF OMR 2017
PROPER CARE HAS BEEN TAKEN WHILE FITMENT OF NO
YES
LIGHTINGAPPARATUS TO AVOID ACCIDENTAL DAMAGE

or responsibility for loss or damage resulting


"OISDhereby expressly disclaims any liabilityStandards/Guidelines.
from the use of OISD
OISD -GDN - 202 Page No. 1 OISD/DOCI2021/28
Field Inspection of Drilling and Work-over Rig Mast, Sub
Structure &Equipment

ADEQUATE WIRE GUARDS ARE PLACED OVER THE YES NO


TOUGHENED GLASS.
AVIATIONLIGHT OF INTERMITTENT TYPE IS FITTED AT TOP YES NO
OF THE MAST.
EMERGENCY/SAFETY TORCH IS AVAILABLE AND
PROPERLY MAINTAINED. YES NO
LIGHTING VOLTAGE PHASE TO PHASE IS O.K. (215V) YES NO

EARTHING
EQUIPMENT / MAST ARE DOUBLE EARTHED WITH YES NO
APPROPRIATE GI STRIP.
MAINTENANCE OF EARTHING PIT AND ITS RESISTANCE YES NO
MEASUREMENT DONEAT EACH NEW LOCATION DURING
DURING RIG BUILDING /SIX MONTHLY.

CABLECONNECTIONS
CABLES ARE LAID DOWN IN THE CABLE TRENCHES AS YES NO
PER CODE OF PRACTICES I.E.BIS-255A
CABLE CONNECTIONS HAVE BEEN PROVIDED YES NO
WITH DOUBLE COMPRESSION GLANDS.
RECEPTACLES AND PLUGS ARE IN GOOD CONDITION, YES NO
INSULATION IS REGULARLY CHECKED AT THE
NEW LOCATION DURING RIG BUILDING AND
SUBSEQUENTLY. YES NO
FLP /INCREASED SAFETY FEATURES(AS PER
ZONE CLASSIFICATION)OF JUNCTION
BOXES,LIGHTING ANDCABLE CONNECTION VIZ.
AIR GAP, GLANDS ETC ARE MAINTAINED IN
HAZARDOUS ZONES. YES NO

REMARKS :

*Reproduced from API Recommended Practice 4G.

disclaims any liability or responsibility for loss or damage resuting


"OISD hereby expresslyfrom the use of OISD Standards/Guidelines.