STRIP DOWN REPORT

I. INFORMATION DATA
Report No. 126/SDR/TSPTMK/II/2024 Comp. Name BEAM ASSEMBLY
Tanggal FEBRUARY 10, 2024 Model FOR WS 6X4 (R1000)
Customer PT. FREEPORT INDONESIA Material Number 40379759
Branch / Site FREEPORT Machine SMR. N/A
Machine Model WESTERNSTAR Install Date N/A
Serial No. Unit / Code Unit N/A Trouble Date N/A
Date Comp. In FEBRUARY 6, 2024 Life time comp. N/A
Prod. Order No. 2200324 Transaction Type ORDINARY
Symptom NO SYMPTOM FOUND (NO SHIPPING TAG)

II. GENERAL HYSTORICAL


The Walk Beam arrived in PT Triatra Sinergia Pratama LIP shop from Freeport on February 6, 2024 for overhaul

No Shipping Tag

III. FINDING INVESTIGATION


DAMAGE CORE / RECEIVING PN COMPONENT : 07500 579

The walk beam assy

Bushing LH Bushing RH
STRIP DOWN REPORT

Bushing Center

PARTS DISASSEMBLY CONDITION

ID Hole Center
Std 214.38 - 214.45 mm

0° 214.81 214.75 214.71 214.67 214.65

90° 213.70 213.71 213.41 213.39 213.39

135° 214.45 214.50 214.51 214.50 214.50

Part Number : -
Description : Walk Beam (ID Hole Center)
Condition : Oval
Recommendation : Repair (line boring)
STRIP DOWN REPORT

ID Hole RH
Std 214.38 - 214.45 mm

0° 214.10 214.12 214.11 214.11 214.09

90° 214.45 214.49 214.41 214.40 214.41

135° 214.81 214.79 214.75 214.70 214.71

Part Number : -
Description : Walk Beam (ID Hole RH)
Condition : Oval
Recommendation : Repair (line boring)
STRIP DOWN REPORT

ID Hole LH
Std 214.38 - 214.45 mm

0° 214.39 214.40 214.43 214.41 214.40

90° 214.40 214.37 214.39 214.38 214.40

135° 214.60 214.63 214.63 214.61 214.61

Part Number : -
Description : Walk Beam (ID Hole LH)
Condition : Oval
Recommendation : Repair (line boring)
STRIP DOWN REPORT
IV. SUMMARY OF MAIN PARTS
NO PART NUMBER Part Name Qty Failure Suggestion
1 - Walk Beam (ID Hole Center) 1 Oval Repair (line boring)
2 - Walk Beam (ID Hole RH) 1 Oval Repair (line boring)
3 - Walk Beam (ID Hole LH) 1 Oval Repair (line boring)

V. GENERAL COMMENT

The Walk Beam was worn out caused by work load cycle, stress out material.

VI. CONCLUSION

From the analysis result concluded that the cause of Walk Beam damage by Operation Issue.

REPORTED BY QUALITY ASSURANCE APPROVED SUPERVISOR APPROVED PRODUCTION HEAD

Name : KRISTIANTO Name : WAHYU HANDOYO Name : ESTOMIHI TAMBUNAN

Date : FEBRUARY 10, 2024 Date : FEBRUARY 10, 2024 Date : FEBRUARY 10, 2024