You are on page 1of 1

N

W E

KEY PLAN
LOCATION
AREA Tunki Makta, Telangana
COORDINATE 17.758058 N,78.551277 E

LEGEND

SYSTEM DETAILS

Sl. No PARAMETER
1. Total Plant_DC Capacity 109 kWp
2. Total Plant_AC Capacity 83 kW
3. Module Wp 545 Wp
4. Orientation Portrait
5. No Of Module 200 nos

Note:

1. All dimensions are in mm. Unless otherwise mentioned.


2. Plant capacity and module placements may change during detail engineering.
3. This is tentative layout for proposal only.

REV. DATE DESCRIPTION

109 kWp DC SAATVIK GREEN ENERGY


Solar PV Power Plant at MP Birla Cement Factory Park Centra, 6th Floor, Avanta Business Center, Sector - 30, Gurugram - 122001, Haryana

PROJECT NAME: Solar PV Power Plant at MP Birla Cement Factory CLIENT NAME : - MP Birla Cement Factory_Kundanganj, Karanpur, Uttar Pradesh

REV NO

DRAWING NAME : - PV Array Layout _Load Center 2 SCALE : -NTS


SIZE :- A4
NAME SIGN. DATE PROJECTION :-
DRAWN H.S 17-05-2023 SHEET NO : -
CHECKED SKM 17-05-2023 APPROVAL INFORMATION RECORD CONSTRUCTION
APPROVED 17-05-2023 SUBMITTED FOR
CPY