Professional Documents
Culture Documents
Plan
To achieve the 6-point Greatness goals, GFLMNHS is set to implement the
following local projects anchored to the Division’s dream project and District Ten Point
Agenda for the next three years.
It was providential that the Lemery District thru our PSDS launched its Project
“BLOOM PA MORE” Building a Landmark of Organizational Opportunities and
Milestone: An Initiative Parameter of meeting Challenges of timely Relevant Education
for Lemerenos. Where our Mantra is New Normal, New Lemery, New Heights. This
project serves as the District Basic Education Learning Recovery and Continuity Plan,
which aims to address issues and concerns for learning as the schools reopen for
onsite classes. BLOOM PA MORE, therefore, serves as the base to which the school’s
PPAs are anchored.
Table 5
GFLMNHS plans and projects for three years
(SY 2022-2023 to SY 2024- 2025)
“DREAM” GOALS CVLIS SIP GOALS CVLIS PPAs
ACCESS
ASSESS numeracy Guarantee learners’ access Project SIGPAW
and literacy levels to education from transition School’s Initiative in Guiding the
and the overall to graduation Performance, Achievement and
situation of learners Welfare of learners
specially the
marginalized.
MODIFY learning Employ new learning Project CLIMB (Creating
package focused on modalities to address the Localized/ contextualized
fundamental skills varying needs of today’s Instructional Materials for the
towards resiliency learners Betterment of the teaching-
learning process
EQUITY
DEVELOP and Reach out to the least, the
implement long-term last and the lost Project HANDS (Hand -in
catch-up plans to Assistance to Nurture and
accelerate learning Develop Students)