24/10/2023 9am

-Dorcas: Pad inspections, Area D, trees felled. Pad 11A & B. Waiting to meet farmer to discuss.
Deliberations to contact farmer to report the incident.
* Visit to areas without sump to inspect damage to farms. Land in between Pad 13 and 14 to be
completed.
- Mike: 15/10/2023, 292 samples sent SMDD, 23,27,28 marking being done. 4 holes ready to be
sampled. Core blocks are not available. Carpenter to provide blocks as soon as possible. Possibly
today.
- Bright: dB update is ongoing. Lidar data received from RUDAN. Elevations issues resolved.
Sections being plotted and soon to be completed. Saamang 2594.1m completed. i.e. 3740.3m.
350.9m left. 422 core boxes left. 1030 assays yet to be received from lab. i.e., SMDD23-18-28
Server: One drive recommended and to be set up.
Prince: Area D main access bridge to southernmost point constructed. some areas need to be
reconstructed. Plugging of holes done but down on pvc. Pvc available and blade to cut and plug
DHs. Concreting to be done around PVC later.
KK: Lost items quotations brought in. Agreement to take out some charges.
Paul: Drilling progressing well. Yellow Rig down. Head being replaced and drilling to start
soon.
Prince: Pad 33 @ SRK 033SI to be prepared.
Paul: Logging still ongoing, model being confirmed and still being developed.
Philip: Safety officer added to health and environment .
After Drilling what next?
Both long-term and short term considerations
Dorcas: Accommodation and bills concerns
Meeting ends at 1024 hrs.