Activity : 30V DC System Shifting & installation of LV ESDB works inside GS Doc. Ref.: UEP/HSE/DISC/RA/02 Rev. No. 0
Risk Rating
Risk Rating
Likelihood
Likelihood
# Sub-Activity OES Hazard Hazard Effect Control Measures
R= S x L
R= S x L
Severity
Severity
Measures
(L)
(L)
(S)
(S)
Compliance
Risk Rating
Risk Rating
Likelihood
Likelihood
# Sub-Activity OES Hazard Hazard Effect Control Measures
R= S x L
R= S x L
Severity
Severity
Measures
(L)
(L)
(S)
(S)
Compliance
Risk Rating
Risk Rating
Likelihood
Likelihood
# Sub-Activity OES Hazard Hazard Effect Control Measures
R= S x L
R= S x L
Severity
Severity
Measures
(L)
(L)
(S)
(S)
Compliance
Risk Rating
Risk Rating
Likelihood
Likelihood
# Sub-Activity OES Hazard Hazard Effect Control Measures
R= S x L
R= S x L
Severity
Severity
Measures
(L)
(L)
(S)
(S)
Compliance
Risk Rating
Risk Rating
Likelihood
Likelihood
# Sub-Activity OES Hazard Hazard Effect Control Measures
R= S x L
R= S x L
Severity
Severity
Measures
(L)
(L)
(S)
(S)
Compliance
Running
Slips & trips thereby Ensure Cable has no damages First Aid box with
Cable Cables on
personnel injury Use always plug top, electrical Authorized
Management/ floor.
12 Yes Electric shock 2 3 6 connections as per OES-4. 2 1 2 First Aider
Condition of Damaged
Cable Cables/ Poor Damage of Avoid joints as far as possible. If at all Emergency
Cable Joints wires/cables. to be done, ensure proper joint. Preparedness
United Engineer Project Co. LLC OETC/ DEC (Client Consultant) Dhofar Integrated Service Company S.A.O.C
Prepared by Reviewed by Reviewed by Reviewed & Approved by
Name: A.Balakumaran Abhijith K C,Durai Pandian
Designation: Site Engineer HSE Officer Project Manager - DEC